Sheet D Imperial Working Drawing Template
Transcription
Sheet D Imperial Working Drawing Template
Door Schedule - Ground Floor U/S of existing steel pan deck INFRASTRUCTURE SERVICES & COMMUNITY SUSTAINABILITY / SERVICES D'INFRASTRUCTURE ET VIABILITÉ DES COLLECTIVITÉS INFRASTRUCTURE SERVICES BRANCH / DIRECTION D'INFRASTRUCTURE DESIGN AND CONSTRUCTION DIVISION / DIVISION DE LA CONCEPTION ET DE LA CONSTRUCTION Door Frame Quantity Door Number Door Type Hardware Set No. Notes Width/Height/Thickness Material Finish Material Finish 1 101A A +914mm x +2134mm x 45mm x2 Aluminum door w/ glass insert 1 101B R +914mm x +2134mm x 45mm x2 Aluminum door w/ glass insert Suspended acoustical tile ceiling. N/A Aluminum frame N/A Aluminum frame N/A N/A Refer to architectural drawings for details pertaining to the exterior glass doors. H1 DEPUTY CITY MANAGER / DIRECTEUR DES SERVICES MUNICIPAUX DIRECTOR / DIRECTEUR MANAGER / GESTIONNAIRE Reinstate glass door w/ aluminum frame assembly. Reinstate card reader and electric strike. H1 FOR / POUR INFRASTRUCTURE SERVICES & COMMUNITY SUSTAINABILITY INFRASTRUCTURE SERVICES DESIGN & CONSTRUCTION - BUILDINGS Door Schedule - 2nd Floor Acoustical Building Felt Liner. Quantity Door Number Door Type "L" trim (Typical). 202 B +914mm x +2134mm x 45mm Maple Wood to match existing N/A 204 E +914mm x +2134mm x 45mm Existing to remain P2 Building Standard Ceiling 'T' Clip. 1 65mm 25 gauge steel metal studs @ 410mm o.c. c/w 15mm gypsum board both sides. Tape, fill & sand smooth ready for paint or other finish. Door Frame Hardware Set No. Notes Width/Height/Thickness Material Finish Material Finish Maple veneer Frame to match Clear existing Hollow Metal P2 H2 N/A 211-2141 Thurston Drive Ottawa ON K1G 6C9 1 LWG-ai.com [email protected] Install new 18mm drywall bulkhead to cover new structural beams. Refer to architectural drawings for details. Baseboard as applicable. Metal runner (Typical). 6mm drywall reveal detail to match existing New maple wood veneer door to match existing Reinstate existing glazing c/w framing assembly Acoustical caulk. New maple wood frame to match existing Line of finished floor as applicable. Replace framing top caps were damages and as required to match existing Line of existing concrete slab. W1 - Interior Partition - Underside of T-Bar Ceiling 1:2 6 5 New hardware as per schedule Reinstate existing power door operator 3112 1 ID9 T 613-739-3699 F 613-739-3965 New 6mm glass insert c/w CGC window film. Refer to specification on page ID10, elevation 1 / ID10. Reinstate existing glass doors c/w aluminum frame 4 Issued for tender 28-08-2013 MB 3 Issued for Final client review 13-08-2013 MB 2 Issued for 90% client review 23-07-2013 MB 1 Issued for 60% client review 26-06-2013 MB NUMBER/ NUMÉRO MILESTONE / FAIT SAILLANT DG DATE: (Y/M/D) (A/M/J) INITIALS INITIALES DG MB SCALE U/S of existing concrete slab 1 DRAWING TITLE A1.1 SCALE: SHEET NUMBER Reinstate existing barrier-free push button Acoustical caulk 4 ID9 1000 Non-adhesive, Non-staining Continuous Compressible Gasket Elevation - Door Type B 6mm reveal to be painted out to match wall Blocking as required 13 4" solid paint grade door 1:20 Suspended acoustical tile ceiling. Room Interior Corridor Side 1828 Acoustical Building Felt Liner Building Standard Ceiling 'T' Clip CE DESSIN CONSTITUE LA PROPRIÉTÉ DE LA VILLE D'OTTAWA ET TOUT DROIT D'AUTEUR EST RÉSERVÉ. LES DIMENSIONS UTILISÉES LE SONT À DES FINS D'ESTIMATION SEULEMENT. IL INCOMBE À CHAQUE ENTREPRENEUR, SOUS-CONTRACTANT OU CONSULTANT DE VÉRIFIER TOUTES LES DIMENSIONS ET LES CONDITIONS SUR LE CHANTIER. VEUILLEZ INFORMER LE PROPRIÉTAIRE DE TOUTE ERREUR OU OMISSION AVANT D'ENTAMER LES TRAVAUX. NE DRESSEZ PAS LES PLANS À L'ÉCHELLE. 1 Elevation - Door Type R ARCHITECT / ARCHITECTE CONSULTANT / EXPERT-CONSEIL RID Silicone bead 1 4" tempered glass insert 1:20 5 ID9 65mm 25 gauge steel metal studs @ 410 o.c. c/w 15mm gypsum board both sides. Tape, fill & sand smooth ready for paint or other finish. 65mm sound attenuation batts suitable for metal stud application 6mm reveal to be painted out to match wall Corridor Side Baseboard as applicable Section - Door 1:5 Header CONSULTANT / EXPERT-CONSEIL 13mmx13mm solid stock glazing stop Line of header above O "L" trim (Typical) 3A ID9 1 2"x 2" solid stock glazing stop THIS DRAWING IS THE PROPERTY OF THE CITY OF OTTAWA AND ALL COPYRIGHT IS RESERVED. DIMENSIONS ON DRAWING ARE FOR ESTIMATING PURPOSES ONLY. IT IS THE RESPONSIBLITY OF EACH CONTRACTOR AND SUB-CONTRACTOR OR CONSULTANT TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE. NOTIFY OWNER OF ANY ERRORS OR OMISSIONS PROIR TO COMMENCING THE WORK. DO NOT SCALE THE DRAWINGS. A 2084 DETAIL NUMBER Reinstate existing hardware CONSULTANT / EXPERT-CONSEIL 6mm reveal to be painted out to match wall Silicone bead Metal runner (Typical) PROJECT / LOCATION / PROJET / ENDROIT Reinstate push button in previous location. Acoustical caulk Line of finished floor as applicable 6 ID9 1000 Line of existing concrete slab 2 ID9 Room Interior Refer to architectural drawing on page XX for details on the exterior facade. W2 - Interior Partition - c/w Plenum Barrier 1:2 6mm tempered glass insert 45mm solid paint grade door Heavy duty hinge Section - Door Jamb 1:5 Services Building Renovation Phase 2 1 River St. 2nd Floor OTTAWA, ONTARIO DRAWING / DESSIN Partition Details, Door Schedule, Door Elevations & Door Details FACILITY NO. / NO. DE INSTALLTIONS 3B ID9 Elevation - Door Type A TBC PROJECT NO. / PROJET NO. 1:20 11080SPTI3 SHEET NO. / FEUILLE No. ID09