Jozef Stefan Institute
ENERGY EFFICIENCY CENTRE
Smart meters: Monitoring of
implementation
Work package n.: 6
Aleš Podgornik
7th Steering Committee Meeting
18.9.2013 | Ljubljana
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
WP6 – Impact on behavior
Equipment
ELIHMed
Feedback Services
Households
Energy
savings
Behavior
Consumption
costs reduction
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
2
Implementations
1.
Type of
consumption
Smart Metering implementation
presentation
Consumption
Appliance specific consumption breakdown
with simple kWh, CO2 and costs presentation Budget
of energy consumption on IHD and/or Web.
Environment
Target
Number
of cases
Behavior of
single
household
60
40
2.
Sophisticated environmental feedback in the
form of advanced consumption and
environment monitoring system, where
energy consumption, temperature, humidity
and other parameters are monitored and
presented in individualized web page.
Environment
Consumption
Budget
Behavior of
single
household
3.
Utility smart meters are used as main focus
point of consumption monitoring and
informative billing is used as main
consumption feedback medium. Installation
of smart meters is coupled with installation
of photovoltaic system.
Budget
Consumption
Environment
Behavior of
single
household
60
4.
Comparative consumption feedback between
several buildings/student dorms in the form
of public dashboards to initiate and stimulate
the competition.
Environment
Consumption
Behavior of
group of
residents
5 buildings
144
rooms
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
3
Case by case implementations I.
Valencia
• Type 1 of implementation
• past consumption partly available
• survey data available
• manual data collection
• Awareness campaign
- Bulletins
- Information campaigns
- Education
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
4
Case by case implementations II.
Malaga
• Type 1 of implementation
• past consumption partly available
• survey data available
• online monitoring (data available)
• Awareness campaign
- Information campaigns
- Education
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
5
Case by case implementations III.
13Habitat
• Decision for type 1 of implementation
• intent to implement online data collection (as Malaga pilot)
• demonstration by equipment provider has been performed
• past consumption not yet available
• survey data not yet available
Region LR
• Type 2 of implementation
• metering equipment has been presented in Montpellier
• waiting for past consumption data
• survey of tenants and premises have to be completed for monitoring
to be successful
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
6
Case by case implementations IV.
DUTH
• Type 4 of implementation
• past consumption is being evaluated (extrapolated from past bills for
campus) as individual building data is not available
• data on room typology available
• remote reading will be applied
-
monitoring of individual building
with 5 samples of individual room monitoring
Cyprus
• Type 3 of implementation
• work in progress
• survey and past consumption data available
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
7
Monitoring needs
Needs for results evaluation
► Individualized excel sheets sent to partners - Basic tool for IJS (WP6 leader)
• past consumption
• essential data from surveys (households data) /performance indicators
• dates of:
- equipment installation
- promotion and awareness campaigns
- implementation of EE measures (refurbishments)
- change in household (new tenants, birth, death etc.)
• costs (not directly affiliated to monitoring but to evaluation):
- equipment
- installation (works)
- additional/extra costs, not related to dwelling refurbishment
(i.e. wiring or fuse box replacement to enable installation)
►
Consumption data (stream of consumption data/provided by installed equipment)
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
8
Scientific view I.
Article: The Impact of Smart Metering on Energy Efficiency in Low-
Income Housing in Mediterranean
Describing ELIH-Med Smart metering experiment
(Experimentation plan: WP6 - phase 2),
has been published in Springers:
CLIMATE-SMART TECHNOLOGIES
Integrating Renewable Energy and
Energy Efficiency in Mitigation and
Adaptation Responses
Leal Filho, W.; Mannke, F.; Mohee, R.; Schulte,
V.; Surroop, D. (Eds.)
2013, XII, 628 p. 250 illus.
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
9
Scientific view II.
Article: Smart Metering and Sustainable Behavior in Low-income
Households in Mediterranean
Describing implementation of experimental plan
(4 types of experimentation)
is pending to be published in
Springers:
HANDBOOK OF CLIMATE
CHANGE ADAPTATION