Malaga pilot project update

Transcription

Malaga pilot project update
Smart Metering experiment in Malaga
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Selection of dwellings
►
►
Selection of dwellings for smart metering
Total = 45 dwellings
Los Limoneros
20 smart meters
(15 without internet)
Barrio de la Luz
(financial pilot)
10 smart meters
West Malaga
(outside of ELIH MED)
15 smart meters
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Selection of providers (I/III)
►
►
A list of technical requirements for the smart meters was
drawn up with information from the TMG + from the
guidelines sent out by IJS
The invitation to tender was sent out to 3 different smart
meter providers:
– EFI Market:
– ENER HELIA
– CURRENT COST
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Selection of providers (II/III)
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Selection of providers (III/III)
►
What equipment will we use?
►
►
►
►
►
ENVIR Monitor
2 connections to the main electricity box
6 additional monitors for different appliances around the house
Software ENERATI
What can we measure?
►
►
►
►
►
►
Total electricity consumption / dwelling
Electricity consumption / selected plug/cable
Price of the electricity consumed
Difference between electricity consumed / historical consumption
Temperature in the dwelling
Create reports and generate alarms
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Installation and training
►
Before installation:
– Dwelling properties matrix has been filled out using the results of the
questionnaire carried out in WP5
– Translation and completion of the energy consumption questionnaire
developed by IJS (to be carried out during installation)
– Preparation of installation package
– Official document regarding ownership
►
Installation and training:
– Installation to be carried out between Jan-Mar 2013. 1st installation
17/01/2013.
– On the spot training will be provided to each end user during
installation
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF
Data collection & Monitoring
►
DATA COLLECTION
– Manual data collection (approx every 3 months)
– Automatic data collection (every month)
►
MONITORING
– Informative bulletin to be prepared and sent out to end users at three
different stages during the smart metering project
– A periodic analysis will be prepared with results from all 45 dwellings
– The energy consumption questionnaire will be distributed 3 times at
different points during the monitoring phase
Projet co-financé par le Fonds Européen de Développement Régional - FEDER
Project co-financed by European Regional Development Fund - ERDF