Malaga pilot project update
Transcription
Malaga pilot project update
Smart Metering experiment in Malaga Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Selection of dwellings ► ► Selection of dwellings for smart metering Total = 45 dwellings Los Limoneros 20 smart meters (15 without internet) Barrio de la Luz (financial pilot) 10 smart meters West Malaga (outside of ELIH MED) 15 smart meters Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Selection of providers (I/III) ► ► A list of technical requirements for the smart meters was drawn up with information from the TMG + from the guidelines sent out by IJS The invitation to tender was sent out to 3 different smart meter providers: – EFI Market: – ENER HELIA – CURRENT COST Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Selection of providers (II/III) Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Selection of providers (III/III) ► What equipment will we use? ► ► ► ► ► ENVIR Monitor 2 connections to the main electricity box 6 additional monitors for different appliances around the house Software ENERATI What can we measure? ► ► ► ► ► ► Total electricity consumption / dwelling Electricity consumption / selected plug/cable Price of the electricity consumed Difference between electricity consumed / historical consumption Temperature in the dwelling Create reports and generate alarms Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Installation and training ► Before installation: – Dwelling properties matrix has been filled out using the results of the questionnaire carried out in WP5 – Translation and completion of the energy consumption questionnaire developed by IJS (to be carried out during installation) – Preparation of installation package – Official document regarding ownership ► Installation and training: – Installation to be carried out between Jan-Mar 2013. 1st installation 17/01/2013. – On the spot training will be provided to each end user during installation Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF Data collection & Monitoring ► DATA COLLECTION – Manual data collection (approx every 3 months) – Automatic data collection (every month) ► MONITORING – Informative bulletin to be prepared and sent out to end users at three different stages during the smart metering project – A periodic analysis will be prepared with results from all 45 dwellings – The energy consumption questionnaire will be distributed 3 times at different points during the monitoring phase Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF