fixed boat protection barrier, us
Transcription
fixed boat protection barrier, us
Protection contre les impacts FIXED BOAT PROTECTION BARRIER, US FIXED BOAT PROTECTION BARRIER Protection contre les impacts Project Street Zip code Place Country/Region Fixed boat protection barrier Year of installation 2006 Customer Engineering Contractor Subcontractor Geobrugg Security Engineering Harbor Offshore Barriers Description Objet protégé Systems Etats-Unis Fixed security barriers for an off-shore platform. Problem: An important oil loading platform in the Persian Gulf had already suffered several attacks from speedboats. The comprehensive security concept of the US Navy required a final security ring to fend off possible attacks. Special requirements: The protection system had to span widths of up to 60 m, combat large tidal differences and be resistant to wind, currents and corrosion forces (seawater). Geobrugg’s answer: High-tensile SATURN nets are fixed to the platform, without resorting to a wear-intensive floating construction. The use of stainless steel increases the service life and a simulation test proves the resistance capability against penetration attempts. SATURN Ring Net Pour toute question, contactez votre spécialiste Geobrugg le plus proche : Marcel Dünner Business Area Manager Safety Solutions Phone +41 71 466 84 70 Mobile +41 79 378 66 06 [email protected] Geobrugg AG Aachstrasse 11 | 8590 Romanshorn | Suisse [email protected] | www.geobrugg.com A company of the BRUGG Group | Certified to ISO 9001 Protection contre les impacts | Fixed boat protection barrier, US 2/2