fixed boat protection barrier, us

Transcription

fixed boat protection barrier, us
Protection contre les impacts
FIXED BOAT PROTECTION
BARRIER, US
FIXED BOAT PROTECTION BARRIER
Protection contre les impacts
Project
Street
Zip code
Place
Country/Region
Fixed boat protection barrier
Year of installation
2006
Customer
Engineering
Contractor
Subcontractor
Geobrugg Security Engineering
Harbor Offshore Barriers
Description
Objet protégé
Systems
Etats-Unis
Fixed security barriers for an off-shore platform. Problem: An important oil loading platform in the Persian
Gulf had already suffered several attacks from speedboats. The comprehensive security concept of the US
Navy required a final security ring to fend off possible attacks. Special requirements: The protection
system had to span widths of up to 60 m, combat large tidal differences and be resistant to wind, currents
and corrosion forces (seawater). Geobrugg’s answer: High-tensile SATURN nets are fixed to the platform,
without resorting to a wear-intensive floating construction. The use of stainless steel increases the service
life and a simulation test proves the resistance capability against penetration attempts.
SATURN Ring Net
Pour toute question, contactez votre spécialiste Geobrugg le plus proche :
Marcel Dünner
Business Area Manager Safety Solutions
Phone +41 71 466 84 70
Mobile +41 79 378 66 06
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn | Suisse
[email protected] | www.geobrugg.com
A company of the BRUGG Group | Certified to ISO 9001
Protection contre les impacts | Fixed boat protection barrier, US
2/2

Documents pareils