minutes of meeting - Highway 427 | Albion Road to Highway 7
Transcription
minutes of meeting - Highway 427 | Albion Road to Highway 7
PUBLIC INFORMATION CENTRE NOTICES Notice of Study Commencement and Public Information Centre #1 Highway 427 Class Environmental Assessment Study From Albion Road to Highway 7 City of Toronto, City of Vaughan THE STUDY The Ontario Ministry of Transportation (MTO) has retained McCormick Rankin Corporation to initiate two environmental assessment processes to address the planning gap on Highway 427 between Albion Road and Highway 7 by determining a long-term strategy to address the needs in the transportation corridor. The study limits extend 2.5 km from south of Albion Road to Highway 7. THE PROCESS The first study will address the interim and ultimate needs of Highway 427. The highway improvements will follow the approved environmental planning process for Group 'B' projects under the Class Environmental Assessment for Provincial Transportation Facilities (2000). The second study will address the planning and corridor protection for a proposed transitway on the west side of Highway 427 from Highway 407 to Highway 7 and is currently following the approved environmental planning process for Group 'A' projects under the Class Environmental Assessment for Provincial Transportation Facilities (2000). Opportunities for public input will be provided throughout each study. Upon completion of each study, a Transportation Environmental Study Report (TESR) will be completed and made available for a 30-day public review period. The TESR public review period will be announced in local newspapers. PUBLIC CONSULTATION A Public Information Centre (PIC) has been arranged to allow the public and interest groups an opportunity to review and comment on the project details with members of the Project Team. Brief presentations will be held at 5:30 p.m. and again at 7:30 p.m. to introduce the Project Team and provide a study overview. Date:Tuesday, June 21, 2011 Place:Embassy Grand Convention Centre, Hall 5 8800 The Gore Road Brampton, Ontario Time: 4 p.m. to 8 p.m. Brief presentation at 5:30 p.m. and 7:30 p.m. The first PIC will be a drop-in style open house session to allow members of the public and residents an opportunity to review the study process, existing conditions, need and justification, generation of preliminary alternatives, and the next steps in the study. Members of the public, residents, and local business representatives are encouraged to attend. A second PIC will be held in early 2012. COMMENTS Comments and information regarding both studies will be collected to assist the Project Team. This material will be maintained on file for use during both studies and may be included in study documentation. Comment forms and study information are available on the study website: www.427albiontohwy7ea.ca. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act and the Access to Information Act. With the exception of personal information, all comments will become part of the public record. For further information, or to be added to the study mailing list, please visit the study website or contact: Mr. Nanda Kandiah, P.Eng.Mr. Jim Dowell, P.Eng. Project ManagerConsultant Project Manager Ontario Ministry of TransportationMcCormick Rankin Corporation 1201 Wilson Avenue, Building D, 4th Floor 2655 North Sheridan Way Downsview, ON M3M 1J8Mississauga, ON L5K 2P8 tel: (416) 235-5397 tel: (905) 823-8500 fax: (416) 235-3576 fax: (905) 823-8503 e-mail: [email protected] e-mail: [email protected] Des renseignements sont disponibles en français en composant (905) 823-8500 poste 1471 (Yannick Garnier). Avis de début d’étude et première séance d’information publique Évaluation environnementale de portée générale de l’autoroute 427 De la route Albion jusqu’à la route 7 Ville de Toronto et Ville de Vaughan L’ÉTUDE Le ministère des Transports de l’Ontario a retenu les services de la société McCormick Rankin Corporation afin d’entreprendre deux processus d’évaluation environnementale visant à remédier aux lacunes en matière de planification constatées sur l’autoroute 427, entre la route Albion et la route 7, en définissant une stratégie à long terme pour répondre aux besoins afférents au couloir de transport. La zone d’étude s’étend à partir de 2,5 km au sud de la route Albion jusqu’à la route 7. LE PROCESSUS La première étude portera sur les besoins provisoires et absolus relatifs à l’autoroute 427. Les améliorations apportées à l’autoroute suivront le processus de planification environnementale approuvé applicable aux projets de « groupe B » en vertu des Normes d'évaluation environnementale de portée générale pour les installations provinciales de transport (2000) du MTO. La seconde étude portera sur la planification et la protection d’un corridor pour Transitway qui sera située du côté ouest de l’autoroute 427, entre l’autoroute 407 et la route 7. L’étude suit actuellement le processus de planification environnementale approuvé applicable aux projets de « groupe A » en vertu des Normes d'évaluation environnementale de portée générale pour les installations provinciales de transport (2000) du MTO. Les membres du public auront l’occasion de formuler des observations tout au long de chaque étude. Une fois chaque étude achevée, on rédigera un rapport d'étude environnementale pour les transports. Le public pourra consulter ce rapport pendant 30 jours. Un avis annonçant la période de consultation publique sera publié dans les journaux locaux. CONSULTATION PUBLIQUE Une séance d’information (SIP) publique aura lieu afin de permettre au public et aux groupes d'intérêt d’examiner les divers éléments du projet et de faire part de leurs commentaires aux membres de l’équipe de projet. De courtes présentations seront données à 17 h 30, puis à 19 h 30, dans le but de dresser un survol de l’étude et de présenter les membres de l’équipe de projet. Date : Le mardi 21 juin 2011 Lieu :Embassy Grand Convention Centre, Hall 5 8800 The Gore Road Brampton (Ontario) Heure : 16 h à 20 h Courtes présentations à 17 h 30, puis à 19 h 30 La première séance d’information publique (SIP) se déroulera sous forme de portes ouvertes libres et permettra au public et aux résidants d’examiner le processus d’étude, les conditions actuelles, la nécessité et le bienfondé du projet, les solutions de rechange préliminaires et les prochaines étapes de l'étude. Les membres du public, les résidants et les représentants de commerces locaux sont invités à participer. Une seconde séance d’information publique se tiendra au début de 2012. COMMENTAIRES On recueillera les commentaires et les renseignements relatifs aux deux études afin d’orienter l’équipe de projet dans son travail. Ces renseignements seront consignés aux dossiers aux fins de consultation lors des deux études et pourraient faire partie de la documentation des études. Les personnes intéressées peuvent obtenir des fiches de commentaires et des renseignements sur les études en consultant le site Web des études, à l’adresse suivante : www.427albiontohwy7ea.ca. Les renseignements recueillis seront utilisés conformément à la Loi sur l'accès à l'information et la protection de la vie privée et la Loi sur l'accès à l’information. Tous les commentaires, à l’exception des renseignements personnels, seront versés au domaine public. Pour obtenir de plus amples renseignements ou pour faire partie de la liste de diffusion des études, veuillez consulter le site Web des études ou communiquer avec les personnes suivantes : M. Nanda Kandiah, ing.M. Jim Dowell, ing. Chef de projetChargé de projet de firme de conseils Ministère des Transports de l’OntarioMcCormick Rankin Corporation Édifice D, 4e étage 2655 North Sheridan Way 1201, avenue WilsonMississauga (Ontario) L5K 2P8 Downsview (Ontario) M3M 1J8Téléphone : 905 823-8500 Téléphone : 416 235-5397Téléc. : 905 823-8503 Téléc. : 416 235-3576Courriel : [email protected] Courriel : [email protected] Des renseignements sont disponibles en français en composant le 905 823-8500, poste 1471 (Yannick Garnier). Notice of Public Information Centre #2 Highway 427 Class Environmental Assessment Study From Albion Road to Highway 7 City of Toronto, City of Vaughan THE STUDY The Ontario Ministry of Transportation (MTO) has retained McCormick Rankin, a member of MMM Group, to carry out two environmental assessment processes to determine a long-term strategy which will address the needs of Highway 427 between Albion Road and Highway 7. The study limits extend 2.5 km from south of Albion Road to Highway 7. THE PROCESS The first study was initiated to address the interim and ultimate needs of Highway 427 and is following the approved environmental planning process for Group ‘B’ projects under the Class Environmental Assessment for Provincial Transportation Facilities (2000). The second study was initiated to address the planning and corridor protection for a proposed transitway on the west side of Highway 427 from Highway 407 to Highway 7 and is currently following the approved environmental planning process for Group ‘A’ projects under the Class Environmental Assessment for Provincial Transportation Facilities (2000). Opportunities for public input will be provided throughout each study. Upon completion of the study, a Transportation Environmental Study Report (TESR) will be completed and made available for a 30-day public review period. The TESR public review period will be announced in this newspaper. The notices will explain the review process and identify the locations where the TESR is available for review. PUBLIC CONSULTATION The first Public Information Centre (PIC) was held on June 21, 2011. The purpose of the first PIC was to provide the public the opportunity to review and comment on the alternatives under consideration and the proposed evaluation criteria. A second and final PIC has been arranged to allow the public and interest groups an opportunity to review and comment on the results of the assessment and evaluation process, and to present the Preferred Alternative for the highway and the transitway. Date:Thursday, February 28, 2013 Place:Embassy Grand Convention Centre, Hall 5 8800 The Gore Road Brampton, Ontario Time: 4:00 p.m. to 7:00 p.m. The PIC will be a drop-in style open house session to allow affected landowners, members of the public and other stakeholders the opportunity to review and comment on display material and discuss the study with members of the Project Team. We encourage you to attend this PIC to provide us with your views and comments. COMMENTS Comments and information regarding both studies will be collected to assist the Project Team. This material will be maintained on file for use during both studies and may be included in study documentation. Comment forms and study information are available on the study website: www.427albiontohwy7ea.ca. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act and the Access to Information Act. With the exception of personal information, all comments will become part of the public record. For further information or to be added to the study mailing list, please visit the study website or contact: Mr. Nanda Kandiah, P.Eng.Mr. Jim Dowell, P.Eng. Project Manager Consultant Project Manager Ontario Ministry of Transportation McCormick Rankin 1201 Wilson Avenue A member of MMM Group Building D, 4th Floor 2655 North Sheridan Way Downsview, ON M3M 1J8 Mississauga, ON L5K 2P8 tel: 416-235-5397 tel: 905-823-8500 fax: 416-235-3576 fax: 905-823-8503 e-mail: [email protected] e-mail: [email protected] Des renseignements sont disponibles en français en composant (905) 823-8500 poste 1471 (Yannick Garnier). Ministry of Transportation Public Information Centre PN-4127-MCRA Brampton Guardian, Etobicoke Guardian, Vaughan Citizen 5C (5.145) x 140ag Avis de deuxième séance d'information publique Étude d'évaluation environnementale de portée générale pour l'autoroute 427 Entre Albion Road et la route 7 Villes de Toronto et Vaughan L'ÉTUDE Le ministère des Transports a chargé McCormick Rankin, membre du Groupe MMM, d'effectuer deux processus d'évaluation environnementale afin d'élaborer une stratégie à long terme qui répondra aux besoins de l'autoroute 427, entre Albion Road et la route 7. L'étude porte sur une distance de 2,5 km, du sud d'Albion Road à la route 7. LE PROCESSUS La première étude a été lancée pour répondre aux besoins à court et long termes de l'autoroute 427 et se déroule suivant le processus approuvé de planification environnementale pour les projets du groupe « B », conformément à l'Évaluation environnementale de portée générale pour les installations provinciales de transport (2000). La deuxième étude a été lancée pour la planification et la protection d'un corridor réservé aux transports en commun qu'il est proposé d'aménager sur le côté ouest de l'autoroute 427, entre l'autoroute 407 et la route 7. Cette étude se déroule suivant le processus approuvé de planification environnementale pour les projets du groupe « A », conformément à l'Évaluation environnementale de portée générale pour les installations provinciales de transport (2000). Le public sera consulté dans le cadre de chacune de ces deux études. Une fois l'étude achevée, un rapport d’étude environnementale pour les transports (RÉET) sera préparé et mis à la disposition du public pour examen pendant 30 jours. La période d'examen public sur le RÉET sera annoncée dans ce journal. Les avis expliqueront le processus d'examen et indiqueront les endroits où le RÉET peut être examiné. CONSULTATION PUBLIQUE La première séance d'information publique a eu lieu le 21 juin 2011. Cette première séance d'information visait à offrir au public la possibilité d'examiner et de commenter les diverses solutions envisagées et les critères d'évaluation proposés. Une deuxième et dernière séance d'information est organisée pour donner au public et aux groupes d'intérêt la possibilité d'examiner et de commenter les résultats du processus et de l'évaluation, et pour présenter la solution préférée pour l'autoroute et le corridor de transport en commun. Date : Jeudi 28 février 2013 Lieu :Embassy Grand Convention Centre, Hall 5 8800 The Gore Road Brampton (Ontario) Heure : de 16 h à 19 h Cette séance se déroulera sous la forme d’un centre d'information informel pour permettre aux propriétaires fonciers concernés, au public et aux autres personnes intéressées d'examiner et de commenter les renseignements qui seront présentés et de discuter de l'étude avec les membres de l'équipe du projet. Nous vous encourageons à assister à cette séance d'information et à nous communiquer vos avis et commentaires COMMENTAIRES Les commentaires et renseignements concernant ces deux études seront recueillis afin d'aider l'équipe chargée du projet. Ces renseignements seront conservés au dossier pour les besoins des deux études et pourront être inclus dans la documentation du projet. Des formulaires de commentaires et des renseignements sur ces études sont disponibles sur le site Web correspondant : www.427albiontohwy7ea.ca (en anglais seulement). L'information recueillie sera utilisée conformément à la Loi sur l’accès à l’information et la protection de la vie privée (Ontario) et à la Loi sur l'accès à l'information (Canada). À l'exception des renseignements personnels, tous les commentaires seront versés au dossier public. Pour obtenir des renseignements additionnels ou vous faire inscrire sur la liste de diffusion de l'étude, veuillez visiter le site Web de l'étude ou contacter : M. Nanda Kandiah, ing.M. Jim Dowell, ing. Chef de projet Chef de projet (expert-conseil) Ministère des Transports de l'Ontario McCormick Rankin, A member of MMM Group 1201, avenue Wilson, bâtiment D, 4e étage 2655 North Sheridan Way Downsview (Ontario) M3M 1J8 Mississauga (Ontario) L5K 2P8 Téléphone : 416 235-5397 Téléphone : 905 823-8500 Télécopieur : 416 235-3576 Télécopieur : 905 823-8503 Courriel : [email protected] Courriel : [email protected] Des renseignements sont disponibles en français en composant le 905 823-8500 poste 1471 (Yannick Garnier). Ministry of Transportation Public Information Centre PN-4127-MCRA_FRE L'Express de Toronto 3C (6.25) x 140ag