sida Country Report 2005
Transcription
sida Country Report 2005
august 2006 • Embassy of Sweden, Mali Sida Country Report 2005 Mali Contents List of Acronyms and Abbreviations..........................................................3 1. Summary...............................................................................................5 2. Political, Economic and Poverty Development in 2005.....................6 2.1 Evolution of the Regional Context and the . Humanitarian Situation................................................................6 2.2 Political Evolution and Events in Mali during 2005......................7 2.3 Democratic Governance and Human Rights................................8 2.4 Macro-Economic Development and Economic Reforms..............9 2.5 The HIV/AIDS situation in Mali................................................12 2.6 The Development Cooperation Context......................................13 3. Swedish-Norwegian Development Cooperation with Mali – Overall assessment of the Country Programme............................14 3.1 Implementation of the Country Plan...........................................14 3.2 Prioritised Dialogue Issues in 2005..............................................15 4. Specific Country Programme Overview of the Swedish Norwegian Development Cooperation..................................................................16 4.1 Budget Support and Public Financial Management....................16 4.2 Democratic Governance and Human Rights..............................17 4.3 Education......................................................................................17 4.4 Health ..........................................................................................18 4.5 Sustainable management of natural resources.............................18 4.6 HIV/AIDS...................................................................................20 5. Office and Administrative Issues........................................................21 Annex 1:Country Report..........................................................................23 Annex 2:Country Plan and Matrix ...........................................................24 Annex 3:Indicators for Monitoring of the PRS........................................26 Other Relevant Reference Documents....................................................28 Published by Sida 2006 Department for Africa Author: Embassy of Sweden, Mali Printed by Edita Communication AB, 2006 Art. no.: SIDA30301en This publication can be downloaded/ordered from www.sida.se/publications List of Acronyms and Abbreviations ABC ADEMA AFD AfDB AMADER Abstain, Be Faithful, use Condoms Alliance pour la Démocratie au Mali L’Agence Française de Développement African Development Bank Agence Malienne pour le Développement de l’Energie Domestique et de l’Electrification Rurale BSI Budget Spécial d’Investissement CEDAW Convention of the Elimination of all forms of Discrimination Against Women CMDT La Compagnie Malienne de Développement Textile CPI Corruption Perception Index DNH La Direction de l’Hydraulique (Water Directorate) EDSM Enquête sur la Démographie et la Santé au Mali ELIM Enquête Légère Intégrée auprès de Ménages EMEP Enquête Malienne d’Evaluation de la Pauvreté FCFA Franc de la Communauté Financière d’Afrique FGM Female Genital Mutilation GBS General Budget Support GDP Gross Domestic Product GEDEFET Gestion Décentralisée de la Forêt et des Energies . Traditionnelles GF Global Fund GSPC Groupe Salafiste Pour le Combat, le Salut et la Prédication HCNLS Le Haut Conseil National de Lutte contre le SIDA . (National Council to fight HIV/AIDS) HDI Human Development Index IMF International Monetary Fund IUCN International Union for Conservation of Nature IWRM Integrated Water Resource Management JFA Joint Financing Arrangement LDG Local Democratic Governance MDG Millennium Development Goal MDRI MMEE NGO NRM PAF PDI PDSS PFM PISE PRODEC PRODESS PRS RPM SBS SE/HCNLS SWAp TI UN UNICEF WAEMU WB WFP Multilateral Debt Relief Initiative Le Ministère des Mines, de l’Energie et de L’Eau Non-Governmental Organisation Natural Resource Management Performance Assessment Framework Programme de Développement Institutionnel Plan Décennal de Développement Sanitaire et Social Public Finance Management Programme d’Investissement Sectoriel de l’Education Programme Décennal de Développement de l’Education Programme de Développement Socio Sanitaire Poverty Reduction Strategy Rassemblement Pour le Mali Sector Budget Support Le Secrétariat Exécutif du Haut Conseil National de Lutte contre le Sida Sector Wide Approach programme Transparency International United Nations The United Nations Children’s Fund West Africa Monetary Union World Bank World Food Programme 1.Summary During 2005, Mali continued to display political stability, timid institutional development, improved rainfalls and generally more optimistic economic perspectives than in 2004. However, poverty remains widespread. Neither improved average growth nor the implementation of Mali’s first Poverty Reduction Strategy (2002–2006) appear to have had any notable impact on poverty levels so far. Mali also remains highly dependent on external factors, including unpredictable climatic conditions but also the political and economic context in the sub-region. The context for development cooperation, however, evolved positively in 2005. Political and economic reforms were slow and the political will to act on certain culturally sensitive issues, such as women’s human rights, can be seriously questioned, but the government appears open to a dialogue with the donors and civil society. Various mechanisms for joint monitoring and policy dialogue around the implementation of Mali’s Poverty Reduction Strategy (PRS) were put in place or strengthened during 2005. For lack of data and in light of the relatively short implementation period for Mali’s PRS, it is too early to assess impact on poverty levels. Mali however, remains very poor and was ranked as number 174 out of 177 countries according to the UN’s Human Development Index in 2005. Swedish-Norwegian development cooperation with Mali in 2005 was largely implemented according to plan (see annex 1 and 2). A total of SEK 212 million was made available to Mali, out of which Norway contributed approximately SEK 50 million. The main emphasis was on the social sectors where SEK 115 million was made available for Mali’s reform and investment programs in Health and Education. This was closely followed by General Budget Support, where SEK 70 million was made available to Mali to implement its PRS and to compensate for revenue losses caused by external shocks in 2004. In parallel to significant support for government programmes, Sweden and Norway also gave financial support to the UN system and to the civil society to pursue efforts in the areas of democratic governance and human rights. 2.Political, Economic and Poverty Development in 2005 2.1 Evolution of the Regional Context and the Humanitarian Situation The unresolved crisis in Ivory Coast continued to threaten both stability and economic progress in Mali, although measures taken by the Malian government to address its immediate effects were successfully implemented. Rumours about the failing health of the President of Guinea-Conakry continued to surface during 2005, with the ensuing risk for another military coup in the region. The evolution in neighbouring Mauritania, which saw a military coup in August 2005, was, however, optimistic and confirmed the initial commitment of the military junta to prepare for elections and return power to civilian rule. The North of Mali is a zone over which the government exerts limited control, which exposes the region to groups and activities on the margin of the law (smugglers, migrants, traffickers, combatants). Mali however, cooperates closely in the area of security with all its Northern neighbours (Mauritania, Algeria and Niger) and American troops are known to hold regular military training exercises with the Malian army in the North. In the second half of 2005, Mali repeatedly figured in the limelight of international media because of its many citizens involved in clandestine migration to Europe via the Spanish enclaves in Morocco, both as migrants and organisers. The Ivory Coast crisis is perceived as having contributed to increased migration towards Europe because of the generally reduced capacity in the sub-region to absorb traditional seasonal migration. Unemployment, porous borders and insufficient social and economic investments are major development challenges to be addressed in order to reduce the incentives for migration. In 2004, rainfalls were scarce and erratic. In addition, the Northern parts of Mali were heavily affected by a locust invasion. Thus, from June until October 2005, which corresponds to the bridge period between the Primarily the re-routing of export and import from the port of Abidjan to the ports of Tema (Ghana), Lomé (Togo) and Dakar (Senegal). Just before the military coup, in June 2005, a military post on the border between Mali and Mauritania was attacked and a few people killed. The attack was believed to have been carried out by the Algerian “Groupe Salafiste Pour le Combat, le Salut et la Prédication” (GSPC) but there have also been rumours about involvement of Algerian Intelligence Service. Not unlike the process which took place in Mali between March 1991 and May 1992. Much of the clandestine migration from the whole of Central and Western Africa goes via Northern Mali and Southern Algeria with the tacit or active support of individual members of Mali’s nomadic Northern population groups. depletion of food reserves from previous year’s harvest and the current year’s harvest, there were fears of widespread famine in Mali, similar to the situation in neighbouring Niger. But, with the exception of limited pockets of severe food shortage, the situation never became as dramatic in Mali. The Commission for Food Security, together with the WFP, UNICEF and key NGO partners, followed the situation closely and took remedial actions. This included food distribution, establishment of nutrition centres and cereal price regulation, which kept the situation under control. 2.2 Political Evolution and Events in Mali during 2005 Mali’s domestic political life displayed continued stability. However, in connection with a soccer game between Togo and Mali in April 2005, which Mali lost, riots broke out, followed by widespread damage of shops, restaurants, streetlights and vehicles. Beyond the deception with Mali’s national soccer team, these events were perceived as a strong expression of popular discontent with the economic and employment situation and thus, indirectly, with the government. Under the seemingly calm surface, there is a high degree of frustration, particularly among the youth, which needs to be taken seriously by politicians and authorities. In June 2005, there was a slight change in the composition of the government. The Minister for the Promotion of Women, Children and the Family and the Minister for Youth and Sport were replaced. The former was perceived to under-perform (but there were also political reasons, linked to the role of her party in the coalition government) whereas the latter was removed primarily because of Mali’s disastrous performance in the Soccer World Championship qualifications and mismanagement of FIFA funds received for that purpose. The positioning for the up-coming presidential and parliamentary elections in 2007 came to the fore in the latter part of 2005. Party coalitions were reformed or confirmed and high-level politicians toured the country to inaugurate investments and development projects. The most significant change in the political landscape was the announced end to “consensus politics”, which has been the trademark of Mali’s political life since the coming to power of the President Amadou Toumani Touré (ATT). When constituting the “Secretariat” of Mali’s parliament in October 2005, the RPM, which is the party of the present Chairman of the Parliament and former presidential candidate (2002) Ibrahim Boubacar Keita (IBK), was forced out by a coalition of eight other parties. The RPM subsequently declared itself “in opposition”. It is expected that IBK will run again for presidency in 200710. In December 2005, Mali hosted the Africa – France Summit It was considered to be a success in terms of organisation and logistics with 26 Mali thereby also lost its chances to qualify for both the World Championship and the Africa Cup of Nations. The Minister for Promotion of Women, Children and the Family, Mme BERTHE AISSATA BENGALY, was replaced by Mme M’BODJI SENE and the Minister for Youth and Sport, M. MOUSSA BALA DIAKITE, was replaced by M NATIE PLEA. This so-called “Bureau” consists of the Chairperson of the Parliament, the 1st up to 8th vice chairpersons, two treasurers and 8 parliamentary secretaries (19 persons in all). Le Rassemblement Pour le Mali (RPM). However, the two RPM ministers in the government did not withdraw from their seats, which undermines the credibility of RPM’s position. This concerns Mme Maiga Zeinab Mint Youba, Minister of Health, and M. Nancouma Keita, Minister of the Environment. 10 IBK was the Prime Minister under the former President Alpha Oumar Konaré (currently the Secretary General of the African Union) and at the time a member of the same political party, ADEMA. IBK’s current party, the RPM, was formed following ADEMA’s inability to appoint one joint presidential candidate in 2002, when Alpha Oumar Konaré stepped down after completing his two constitutional periods. Heads of State from Africa and France and a total of 52 African countries represented. The official theme of the summit was “the Youth” but other critical questions such as the increasingly visible migration towards Europe and a number of on-going crises on the continent were supposedly addressed at the margin of the official programme. 2.3 Democratic Governance and Human Rights11 Serious violations of the rights of women and children continue to be widespread in Mali but receive only limited attention by media, civil society and the authorities. Whereas there was a slight increase in media coverage of Female Genital Mutilation (FGM) during 2005, primarily in connection with international events such as February 6th and March 8th 12, little progress or political initiative can be noted in the area of women’s rights. Mali has ratified a number of international conventions on women’s rights, which have not yet been translated into national legislation13. Public resistance to any advance with regard to women’s rights remains high, reinforced by a strong interaction between tradition and religion, and the political will to face this resistance appears very limited. Corruption continues to be widespread at all levels of the public administration. In the last report (CPI 2005) by Transparency International (TI), Mali was ranked as number 88 out of 158 countries, with a score of 2.9 on a scale from 10 = highly clean, to 0 = highly corrupt. This is a decline from 2004, when Mali was ranked number 77 with a score of 3.2, and from number 78 with a score of 3.0 14 in 2003. Overall trends of corruption are difficult to assess. Public opinion generally perceives corruption to be on the increase and a number of corruption related stories received media coverage during 200515. Few, however, are subject to judicial action. In 2005, the new institution of the Vérificateur Général (“Auditor General”) became operational and identified a number of priority “files” for investigation16. With sufficient political and public support, this could potentially make a difference. The first annual report is due early 2006. Its reception by the government and the public will provide an indication of the effectiveness of this new institution. During 2005, a number of reforms aiming to strengthen democratic governance were launched. The 10-year programme to reform the public administration (PDI17), which was approved in 2003, was complemented with its first three-year plan of action for the period 2005–2008. It is now under implementation. A major aspect of the PDI is its objective to accelerate the processes of decentralisation and deconcentration. This 11 See also the “Report on Human Rights in Mali 2005” by the Swedish Ministry of Foreign Affairs (www.manskligarattigheter.gov.se). 12 February 6th is the International Day against FGM and March the 8 th is the International Day for Women. 13 The February 2006 report from the CEDAW Committee is very explicit in this regard, urging Mali to accelerate legal reforms, which will guarantee the same rights for women and men in all aspects of life. CEDAW stands for the Convention on the Elimination of all forms of Discrimination against Women. 14 It is worth noting that two thirds of all TI rankings are below the score of 4.0 and that most of Sida’s partner countries in Africa receive a score between 2 and 3, with very little difference between them. 15 Trafficking of Ivorian cotton, mismanagement of FIFA funds by the Malian Soccer Federation, bribes related to the receipt of grades and degrees in the education system and kickbacks on public works and procurement (including on agricultural input goods). 16 This includes the “Malian Housing Bank” (la Banque Malienne de l’Habitat), the Directorate for Public Procurement (la Direction de Passation des Marchés) and its procedures, VAT reimbursement cases, the Customs Directorate and the management of various customs and tax exemptions. 17 Programme de Développement Institutionnel (PDI) reform was launched already in 1993 and should be complete by 2007. However, very little has been implemented up till present. In parallel, and as a major component of the PDI, a five-year action plan for improved Public Finance Management (PFM) was approved in June 2005, after wide stakeholder consultations. Certain preparatory activities are under way as per the end of 2005 whereas actual implementation should start in 2006, funded via the state budget. 2.4 Macro-Economic Development and Economic Reforms As per IMF and Government estimates in June 2006, the GDP growth in 2005 was 6.1%. This is above the targets set under Mali’s current agreement with the IMF (5.4%) while below the targets in Mali’s Poverty Reduction Strategy (6.7% average annual growth). However, it is a significant improvement compared to 2004, when growth was only 2.2%. The improved growth stems primarily from increased world market prices and production of gold but also from increased cereal production. Despite more optimistic trends, the Malian economy still faces some critical challenges. Under IMF’s so-called “Article IV Consultations”, offering a medium term perspective on the Malian Economy, which took place in October 2005, the emphasis was on the following aspects: – a considerable increase in economic growth in order to generate sufficient national revenue and budget resources to reach the Millennium Development Goals (MDGs); – an improved capacity to absorb external shocks (including a revisit of the monetary regime); – a sustainable policy on pricing and taxation of petroleum products; – a reform of policies and strategies to ensure food security. In terms of macro-economic stability, Mali did well in 2005 and met most the WAEMU18 criteria, except for inflation which was unusually high (6.1% compared to a WAEMU target of max 3%). This was explained by a short period of extremely high food prices during the threat of a food crisis referred to above (actual food shortage was exacerbated by speculation). Despite a more favourable context and significant efforts by the government, the completion of the IMF April -05 review was considerably delayed. Disagreement on Mali’s taxation policy on petroleum products was quoted as the main reason. As oil prices increased to unprecedented levels, Mali chose to reduce taxes on the same, thus avoiding increased consumer prices, which could have negatively affected the economic performance in general while also leading to popular discontent. Mali’s domestic resource mobilisation is already below WAEMU’s criteria. Since oil prices will most likely remain high, the IMF considered this a structural risk, which needed to be addressed. Despite below expectation revenues19 and an unplanned increase in funding to the state owned cotton company20, budget execution in 2005 was globally deemed acceptable. The regular state budget was almost 18 West Africa Economic and Monetary Union (WAEMU) 19 Explained by lower than expected tax and customs revenues, non-payment of dividends from state-owned companies, delayed compensation for customs duties from the WAEMU and lower than expected general budget support from certain donors. 20 A “subsidy” of FCFA 13.8 billion, which was recorded in the budget 2005, was later transformed into an “advance” (i.e. a loan) of FCFA 20 billion for 2005 and another FCFA 8 billion for 2006. In light of CMDT’s shaky financial situation, it is highly unlikely these loans will ever be reimbursed to the government. entirely executed according to plan, whereas execution of the so-called “Special Investment Budget” (BSI21) – funded primarily on external resources – remains significantly below target, largely because of cumbersome donor procedures. These constraints will shortly be addressed through a joint framework for budget support, which has been under development in 2005. Once finalised, it should allow for increased alignment on Malian procedures and a conversion of program and project support (currently recorded on BSI) towards regular budget support. Economic reforms are slow despite continued commitment by the government. This concerns all sectors22 but the major concern of both the donor community and the government remains the integrated parastatal cotton company (CMDT23). In December 2005, the government eventually approved a detailed “road map” for the privatisation process, to be completed by the year 2008. The privatisation as such will most likely be a loss making affair for the government of Mali, given that the accumulated debts of the CMDT vis-à-vis the Malian state is estimated to amount to 75 billion CFA (approx. SEK 1.07 billion). In addition, several objectives need to be balanced in this process: – long-term productivity versus short-term protection of cotton farmers, existing production and government revenue; – attractiveness for private (potentially foreign) investors versus existing employment and protection of the environment; – and, not least, the temperature of public opinion in light of upcoming elections in 2007. The price mechanism which the CMDT, the government and the producers agreed upon in late 2004, has been applied in 2005 (with a very conservative price to farmers of FCFA 160 per kilo of cotton grain) but has not entirely succeeded in protecting the state budget from having to contribute to CMDT’s liquidity needs (as per footnote 20 above). Despite measures to reduce the costs of CMDT’s operations, it continues to make losses and to accumulated debt. For the 05/06 season, losses are estimated to 7.5 billion CFA, to be compared with 53 billion CFA in 04/05, before the application of the new price mechanism. Mali’s external debt increased in 2005, from 63.1% to 67.5% of GDP. However, towards the end of 2005, the IMF announced that it would cancel Mali’s entire debt within the framework of the Multilateral Debt Relief Initiative (MDRI). The World Bank (WB) and the African Development Bank (AfDB) are expected to follow shortly but this initiative will only have an effect on the 2006 budget. The fight against poverty and the implementation of Mali’s PRS Mali suffers from limited financial and institutional capacity to measure and analyse trends with regard to poverty. The database resulting from the extensive poverty mapping survey that took place in 2001 (EMEP24) has not yet been fully exploited and could still contribute to an improved 21 Budget Spécial d’Investissement (BSI) 22 Including but not limited to: restructuring and privatisation of state owned banks, adjustment of the civil servant pension fund, granting of ownership/user rights in “Office de Niger” and restructuring of the water and electricity company (EDM). 23 La Compagnie Malienne de Développement Textile 24 Enquête Malienne d’Evaluation de la Pauvreté (EMEP) 10 understanding of the extent and character of poverty in Mali. The latest population census was conducted in 1998. It is questionable how fair a picture this data provides of the present size and composition of the population. Birth and death registration in Mali is very erratic. In 2003, a so-called “light poverty survey” (ELIM25) was conducted. It actually indicated that many households perceived an improvement in their living conditions between 2001 and 2003, manifested for example by an increase in assets (land, cattle, radios, bicycles, etc.) During 2005, the WB conducted several studies on the state of poverty in the cotton growing areas in Southern Mali. The results strongly contradicted popular perceptions of the “South” as a comparatively rich area26. On the contrary, poverty appears more widespread in the South than in other areas, both in monetary terms (partly explained by high indebtedness of farmers and depressed cotton prices) and in social terms (e.g. malnutrition levels of children). Preparations are underway for at least two important surveys in 2006, which should contribute to an improved understanding of the evolution of poverty in Mali over the last five years, namely the fourth Health and Demography Survey (EDSM IV27) and another ELIM. Mali’s first joint28 review of the implementation and results of its Poverty Reduction Strategy (PRS) strategy was held in June 2006, covering the period from 2002–2005. Despite lack of data allowing for a real analysis of the poverty situation29 and weak mechanisms for monitoring the results of reform programmes linked to the PRS, the various stakeholders, including the donors, were generally positive to the review. It forms the basis for systematic, transparent and participatory follow-up of the PRS and is thus a mechanism for gradual and continuous improvement. A shortlist of 46 PRS results and impact indicators, drawn from Mali’s own PRS follow-up framework, is attached to this report (annex 3). These indicators point to continued investment in basic social infrastructure and thus improved access to e.g. health and education services. However, the quality and actual utilisation rate of these services leave much to desire. For example, whereas enrolment rates have improved, drop-out rates remain high and the gap between completion rates of girls and boys appears to increase. Impact indicators in the area of health can only be credibly assessed after the completion of EDSM IV in 2006. The major recommendations from the PRS review, subsequently adopted by the government, were the following: – give more priority to the productive sectors, including a re-allocation of budget resources; – improve statistics and poverty analysis; – improve domestic resource mobilisation by reforming fiscal policy; – accelerate the decentralisation process; 25 Enquête Légère Intégrée auprès de Ménages (ELIM) 26 The “South” has enjoyed quite high investments in economic and social infrastructure over many years because of the presence of the cotton company CMDT, which mandate also included social development in the cotton growing areas. 27 EDSM = Enquête sur la Démographie et la Santé au Mali. The latest health survey, EDSM III, was conducted in 2001. 28 Involving the government with its different sectoral ministries, the private sector, civil society, local government and the donor community. 29 Based on projections from existing data (Population Census 1998, EMEP 2001, GDP growth and inflation), the PRS Review Report suggests a decrease in poverty from 64% in 2001 to 59% in 2005; to be compared with the objective of 48% set by the PRS. 11 – align PRS and sectoral reviews on the budget cycle to allow for annual adjustments in the allocation of resources; – improve the PRS monitoring framework, including relevant indicators and targets; – harmonise PRS objectives and indicators with the MDGs30; – enlarge the participatory process around the PRS. Early October 2005, the government approved the ToRs for the development of Mali’s next PRS (2007–2011). The formulation, consultations and approval processes should be completed during 2006. The timetable is extremely tight, which is not quite compatible with the expressed ambition of conducting a highly participatory process, including stocktaking, data collection and analysis. However, given the upcoming elections in 2007, the present government seems determined to finalise the new PRS before the election campaign takes off. New priority areas, which need to be integrated in the next PRS, are (inter alia) growth and diversification strategies, HIV/AIDS prevention, a stronger human rights focus, improved food security31, the fight against corruption, a much improved and crosscutting gender and environmental analysis. 2.5 The HIV/AIDS situation in Mali The HIV/AIDS prevalence in Mali is low. The official figure is 1.7% (EDSM III in 2001) although statistics from limited samples of people coming for voluntary testing indicate a prevalence level of above 2% in the general population. The prevalence is significantly higher in particularly vulnerable groups, such as sex workers (31%) and truck drivers (3.1%). These facts, together with other risk factors such as high levels of migration, widespread gender based violence and unresolved conflicts in neighbouring countries, expose Mali to the risk of rapid spreading of HIV/AIDS. In order to manage the situation, Mali has created the National Council to Fight HIV/AIDS (HCNLS32). It is composed of representatives of the public and private sector and civil society. It is formally chaired by the President of the Republic, seeking to demonstrate top-level commitment. Between the bi-annual meetings of the HCNLS, an Executive Secretariat takes responsibility for coordinating national operations to prevent HIV/ AIDS, based on the internationally recognized principle of the “Three Ones”: One national framework, One coordination mechanism and One monitoring and evaluation mechanism. During 2005, the HIV/AIDS Secretariat concluded major funding agreements with the Global Fund (GF), the WB and the AfDB. Thus, funding appears no longer to be a constraint, but capacity is still severely constrained. Ironically, it appears that the projects put in place by the WB and the GF contribute to draining some of the scarce capacity required for coordination of the national response to the pandemic. Critical voices have been raised against the WB/GF approach, including by the Netherlands and Sweden. 30 Millennium Development Goals (MDGs) 31 Despite the government’s speedy handling of the temporary food crisis in July/August 2005, the fact remains that large portions of Mali’s population are exposed to structural food insecurity and permanent malnutrition, especially children under five. Policies and reform programs aiming at increased agricultural production are urgently called for but will not alone solve the problem. National polices in health, education and nutrition must simultaneously be developed and vigorously implemented. A sustainable reduction of children’s malnutrition rates will likewise be dependant on a significant change in the status of women, being the principal caretakers of the children. 32 Le Haut Conseil National de Lutte contre le SIDA 12 2.6 The Development Cooperation Context During 2005, Sweden put strong emphasis on the implementation of the “Aid Effectiveness Agenda”, as reflected in the Paris Declaration from February 2005. Mali is a signatory to the Declaration and has established a task team attached to the President’s Office, but no consolidated initiative vis-à-vis the donors or the line ministries has yet been taken. Despite weak leadership “at home”, Mali continues to be active in international fora for follow-up of the Paris Declaration. There are also encouraging “bottom-up” developments in several (sub-) sectors, including: – attempts to formulate a Joint Financing Arrangement ( JFA) for budget support; – increased alignment on national procedures in the Health and Education sectors via the development of a sectoral budget support modality; – attempts to formulate a sector programme in the area of “Access Drinking Water”; – the approval of a national PFM action plan which will be funded via the state budget. On the donor side, the interest in the Aid Effectiveness Agenda likewise appears limited and leadership is seriously lacking in many donor harmonisation processes. Among the bi-laterals, it is primarily the Netherlands, Canada, Switzerland and Sweden which try to move the aid effectiveness agenda forward. The multi-laterals remain quite timid. However, donor coordination has improved during 2005. The monthly donor meetings for Heads’ of Agencies have become more structured and a Troika33 has been put in place with the aim to strengthen leadership, ensure continuity over time and to pursue dialogue between the monthly meetings. 33 The troika is composed of the former, present and future chairperson of the “Heads’ of Mission and Agency Donor Group”. At the end of 2005, the troika was composed of UNICEF (former chair), Sweden (present chair) and EU-DEC (future chair). The rotation takes place on a 6 months basis. 13 3.Swedish-Norwegian Development Cooperation with Mali – Overall assessment of the Country Programme 3.1 Implementation of the Country Plan The Country Plan for 2005–2007 was the first consolidated attempt to translate the Country Strategy 2004–2006 into a coherent portfolio of development cooperation contributions. Given a very limited active portfolio by the end of 2004, and a doubling of allocated resources for 2005, the Country Plan 2005–07 was by definition very tentative in its nature. There have since been continuous adjustments in planned interventions and amounts, but the overall strategic orientations have been confirmed. Total disbursements in 2005 were SEK 212 million (including SEK 2.1 million channelled via Swedish NGOs under the so-called “NGO appropriation” and SEK 1.3 million under the appropriation for “humanitarian assistance”)34. Norway contributed a total of SEK 50 million which was proportionally distributed over the three sub-sectors Norway co-funds with Sweden, namely Education, Democratic Governance and Sustainable Natural Resources Management (see annex 1 and 2 for more details). General Budget Support (GBS), together with the SWAps in Health and Education, were planned to absorb about 90% of the country frame (SEK 165 million, out of available SEK 180 million) whereas final disbursements for these two sectors amounted to SEK 185 million35, or 90% of total disbursements (including significant over planning). Funding for the areas of “Democratic Governance & Human Rights” and “Sustainable Management of Natural Resources” – with a crosscutting emphasis on decentralisation and women’s rights – were planned to absorb about 10% each of available funding – while at the same time being the most dialogue intensive. However, project preparation in these two areas was slower than expected which is why only SEK 19 million, or 9% of total disbursements, were made under these two thematic areas. The lengthy project preparation processes during 2005 have been a good learning experience for Sida, which had somewhat under-estimated the time and human resources required to build up partnerships in a new country of cooperation. This is particularly true for support to government agencies with whom there is no prior relationship and for which Sida 34 This should be compared to an allocated amount under the so-called “country frame” of SEK 180 million. Final disbursements on the “country frame” were thus about 16% higher than planned. 35 Towards the end of the year, it was suggested to re-allocate an additional amount of SEK 20 million in general budget support to help Mali bear the consequences of external shocks in 2004. 14 requires an assessment of procurement systems and financial management capacity. In the context of the on-going decentralisation process in Mali, the political and institutional landscape is not always complete nor clear, which has also contributed to extend the assessment phase. Sida’s own internal organisation, with a division of roles and responsibilities between the Section for Development Cooperation (SDC) in Mali, technical departments at Sida-HQs and several regional advisers has, together with unavoidable staff turnover, also contributed to delaying the process. During 2006, these weaknesses will be addressed and major preparation activities will be completed, which will – hopefully – result in a wellstructured and focussed cooperation program with Mali that can serve as a basis for on-going policy dialogue in close coordination and complementarity with other donors in the country. 3.2 Prioritised Dialogue Issues in 2005 Mali and Sweden-Norway held their first “Annual Consultations” in May 2005, jointly chaired by Mali’s Director for Development Cooperation36 and Sida’s Director for the Africa Department37. The consultations took place over two days and were characterised by open dialogue, albeit with certain diplomatic constraints regarding the final formulation of the Agreed Minutes. Both parties declared satisfaction with the outcome of the meeting. Our Malian partners characterised Sweden-Norway as a “young and dynamic development cooperation partner”, which strategic priorities were confirmed as relevant for the development of Mali. Mali agreed to take note of shared priorities with regard to the promotion of Women’s Rights, the ABC-approach 38 to preventing HIV/AIDS and the continued fight against corruption. No major changes in orientation or allocation of funds were proposed. It was finally agreed that in the future, the annual multi-donor meetings to review the implementation and priorities under the PRS, would replace Sweden’s bi-lateral annual consultations. During 2005, the SDC also devoted significant time to its role as chairperson in the donor group from October 05 to March 06. During its mandate, Sweden has put strong emphasis on improved donor coordination, both at thematic/sectoral level and at the genera (“Head of Agencies”) level, shared priorities and joint dialogue with the government. 36 Ambassador Boubacar Sidiki Touré 37 Ms. Lotta Sylwander 38 Abstain, Be Faithful, use Condoms (ABC) 15 4.Specific Country Programme Overview of the Swedish Norwegian Development Cooperation 39 4.1 Budget Support and Public Financial Management39 In the spirit of the Paris Declaration and against the background of Mali’s slow but steady progress in terms of macro-economic stability, PRS monitoring and reform40, the SDC developed a proposal for a threeyear (2005–2007) agreement on General Budget Support (GBS). The GBS was meant to support the implementation of Mali’s PRS and help Mali absorb the effects of a number of simultaneous external shocks in 200441. It was presented to Sida’s Project Committee in October 2005. The reaction was overall favourable but the SDC was tasked to revise the amounts slightly, to reduce the agreement period to two years42 and to complement the analysis in the areas of institutional capacity and budget analysis. By mid-December 2005, Sweden entered into a two-year (2005–2006) agreement with Mali on GBS for a total amount of MSEK 150 out of which MSEK 70 was disbursed for the 2005 budget. The performance assessment framework (PAF) for Sweden’s budget support to Mali includes four main areas: – macro-economic performance (as per IMF assessments), – implementation of the PFM action plan, – improved PRS monitoring and a participatory national process leading to the formulation of the next PRS, – continued reform of the cotton sector and privatisation of CMDT. As the work on a Joint Financing Arrangement ( JFA) for budget support progresses, the Swedish PAF, at present closely coordinated with those of the Netherlands and France, will be entirely merged with the joint PAF, which is under development. 39 See also the draft Country plan 2006–2008 and actual disbursements in annex. 40 Not least, the decisions during 2005 to launch or strengthen a number of key reforms notably the PDI, the PFM action plan, the CMDT privatisation and continued decentralisation. 41 Including the Ivory Coast crisis, depressed cotton prices, depreciation of the dollar against the Euro (and thus against the FCFA), etc., all of which affected negatively both the income and expenditure side of Mali’s budget in 2004 and in 2005. 42 While awaiting Mali’s new PRS in 2007 as well as Sweden’s new country strategy in 2006. The JFA for GBS which has been under discussion in 2005 is expected to be finalised in 2006. 16 4.2 Democratic Governance and Human Rights The Country Plan 2005–2007 identified democratic governance at the local level as one of the most important challenges to continued democratisation and efficient public administration. During the first part of 2005, the SDC, together with Sida-DESA, therefore conducted several studies and workshops to explore how Sweden-Norway could support this theme, while also taking into account the need for efficient contribution management. The recommendations, which came out of this consultative process, were in favour of support to a partnership of four like-minded international NGOs43. These NGOs are already active in the area of Local Democratic Governance (LDG) with well-established local partnerships. Natural Resources Management (NRM) emerged as the preferred focal area for improved LDG, since NRM is the source of many local conflicts and an area in which the transfer of resources and responsibilities to municipalities has not yet made much progress. All four NGOs will continue to work within their existing programs but will gradually establish a joint platform for learning, action and advocacy. The second major contribution within the area of democratic Governance is a thematic support to UNICEF’s Child Protection Program in Mali. Sweden-Norway supports two (out of four) components, namely the “Child Protection” proper and the “Promotion of a Human Rights Culture”. Through this programme, the SDC will seek to join hands with UNICEF for intensified policy dialogue in key areas of Women’s Rights such as a revision of the Family Code, a Law against Female Genital Mutilation (FGM)44, institution building support to the Ministry for the Promotion of Women, Children and the Family and a strengthened gender analysis under Mali’s new PRS. 4.3 Education Sweden and Norway have made support to Mali’s 10-year national education strategy PRODEC45 (1999–2008) a top priority in their development cooperation with Mali. Sweden entered into a delegated partnership with the NL for support to the first phase of the Education Sector Investment Programme (PISE I: 2001–2004) in 2002. This agreement ended in December 2004. As the preparations for the second phase of the programme (PISE II, now planned for 2006–2008) were delayed, it was decided to extend the existing agreement with one year, until December 2005, and to allocate an additional amount of SEK 80 million for 2005. These funds were disbursed in two tranches during 2005. The second tranche was significantly delayed since one criterion for disbursement was the finalisation of PISE II. Sweden-Norway intends to continue to support PISE II (2006–2008) via sector budget support (SBS), which will be the preferred modality for the second phase. In February 2005, the Netherlands Embassy in Bamako was invited to Stockholm for the annual bi-lateral meeting under the delegated partnership and to discuss the experiences from three years of delegated cooperation between the two countries in the Education sector. Overall, the Netherlands and Sweden are very pleased with this arrangement and 43 The four NGOs are SNV from the Netherlands, Helvetas from Switzerland, Norwegian Church Aid from Norway and Diakonia from Sweden. 44 The Ministry of Women, Children and the Family, with support of the Italian NGO “No Peace without Justice”, is preparing a conference for February 2006, to re-launch the debate on a national law that explicitly forbids FGM. This could constitute a first good opportunity for Sweden and UNICEF to develop a higher joint profile in this area. 45 Programme Décennal de Développement de l’Éducation (PRODEC) 17 concluded that delegated cooperation helps diminish the transaction costs for the Malian government as well as for Sida. 4.4 Health46 Mali has a ten-year national strategy for development of the Health and Social sectors (PDDSS47 1998–2007) but its implementation has been significantly delayed. The first five-year plan of PDDSS implementation (PRODESS I, 1998–2002) was extended up until 2005 to allow for an improved preparation of PRODESS II (2005–2009). A change of Minister of Health in 2004 was seen as an important step towards improved management of the sector and is one of the reasons behind the Swedish decision to enter into the health sector in late 2004. During the first half of 2005, Sweden informed the Malian Government of the planned Swedish support to PRODESS II. The Netherlands’ (NL) Embassy in Bamako was contacted for the preparation of a delegated cooperation arrangement, with the NL as the lead/vocal donor. Such arrangements are already in place in Burkina Faso in the Health Sector and in Mali in the Education sector. Agreements on a one-year support (2005) to PRODESS II of SEK 35 million were finalised towards the end of 2005. Disbursements were made by mid-December, while allowing for the carrying over of funds to 2006. This short-term support to PRODESS II in 2005 should be seen as a bridge arrangement, awaiting the preparations of the sector budget support (SBS) modality for the period 2006–2009. 4.5 Sustainable management of natural resources As per the Swedish Country Strategy, the specific objective for support to this thematic area is “to contribute to improved income and security for poor people, particularly girls and women, through increased and sustainable productivity in the natural resources sectors.” The strategy goes on to identify two prioritised sub-sectors, namely integrated water resource management (IWRM) and forest management. Since there has been limited progress in the area of IWRM48 in Mali, the Country Plan 2005 identified “access to drinking water” as a relevant entry point for Sida to the broader question of IWRM. A significant difference can be noted between the two sub-sectors identified for Swedish support. Whereas there is notable progress in the area of “Access to Drinking Water”, both in terms of policy development and actual implementation, little has happened in the area of “Forest Management”. Both water and forest management are legally part of the mandate and responsibility of the municipalities since the decentralisation reform was enacted in 1993 (La Loi d’Orientation). Thereafter, the Government has been very slow in following up the law with the necessary decrees and guidelines for its implementation, especially in the area of natural resources management where stakes are perceived as high. It is also true that the municipalities initially had very limited capacity to take on these responsibilities. The “Water Directorate” (DNH49) of the Ministry of Mines, Energy and Water (MMEE50), has pursued a number of initiatives with regard to 46 This sector does not include Norwegian Funds. 47 Plan Décennal de Développement Sanitaire et Social (PDDSS) 48 Notably with regard to the development of an action plan for IWRM, the so-called PAGIRE (Plan d’Action pour la Gestion Intégrée des Ressources en Eau). 49 La Direction de l’Hydraulique 50 Le Ministère des Mines, de l’Énergie et de l’Eau (MMEE) 18 the development and approval of national policies on water management and monitoring during 200551. Donor coordination in the sector is improving and a study was launched to analyse the format and timetable for developing a Sector Wide Approach programme (SWAp). Together with selected municipalities, DNH has moved ahead and tested new models for the transfer of responsibilities for existing water pumps and other installations to local government52. However, based on arguments related to economies of scale and weak local capacity, there is still some resistance to a total transfer, which would include fund management and procurement for new installations or rehabilitation of existing installations. In the area of forest management, it is yet difficult to see any real political initiative to move towards implementing the decentralisation policy. There is a number of interesting field experiences to capitalise on, primarily among NGOs, but the government has not yet taken the lead in disseminating and scaling up these activities. This will be one of the objectives of the Swedish-Norwegian support to this area (see below). During 2005, the SDC, with support of Sida-HQs and the regional adviser in Senegal, pursued the analysis of existing preconditions for support to the NRM “sector”. Two requests for support have been submitted by the Malian Government. One request has come from AMADER53, Mali’s autonomous rural energy agency, for support to a project aiming at decentralised and sustainable forest management (GEDEFET54). Whereas the objective of the request is entirely in line with Swedish priorities for development with Mali, more analysis is required of the institutional and political framework before the project can be approved. The DNH has requested support from Sweden for a water installation rehabilitation project in the 3rd, 4th and 5th regions in Mali. The project is ongoing since about three years with French funding via AFD55, which expired in November 2005. Because of unforeseen increases in cost, quite a large number of identified pumps and boreholes were not rehabilitated as planned and there is continued strong demand from the municipalities vis-à-vis the Regional Water Directorate to complete the process. Sida is thus in the process of assessing the proposal, which is seen as a short-term support while awaiting the formulation and launch of a pool funded Drinking Water SWAp. Sida therefore considers potential support to region 3, 4 and 5 as a learning experience for both Sida and DNH, notably in the area of decentralisation. As per the end of 2005, Sida only had one active agreement in the area of natural resources, namely with the IUCN56 which runs a project called PAGEIT. This project, co-funded with the NL, supports decentralised and sustainable management of natural resources in the inner delta of the Niger River, the second largest inland delta in Africa. The current agreement covers the period 2004–2007 and the total Sida support amounts to SEK 5 million. The Swedish-Norwegian disbursement in 2005 was SEK 913,000. Since this is a relatively small contribution. Sida will therefore 51 A draft “National Water Policy” was subject to a stakeholder validation in May 2005; a “National Strategy for the Monitoring of Water Resources” was in its final stages of formulation and the “National Strategy on Access to Drinking Water” was in the process of being revised. 52 Currently, 241 out of 703 municipalities have received the delegation of power over water resources from the Water Directorate. 53 Agence Malienne pour le Développement de l’Énergie Domestique et de l’Electrification Rurale (AMADER) 54 Gestion Décentralisée de la Forêt et des Energies Traditionnelles (GEDEFET) 55 L’Agence Françaises de Développement (AFD) 56 International Union for Conservation of Nature (IUCN) 19 need to reflect on whether to expand or phase out this theme in its overall portfolio. While relevant in the context of Sweden’s Country Strategy, the specific objectives and implementation mechanisms of the project need to be revised to justify continued Sida support. These questions will be addressed during a mid-term review in 2006. In the medium term, Sida and the Netherlands Embassy have expressed an interest in developing closer cooperation in the area of NRM. A joint Swedish-Dutch mission to this effect visited Mali in October 2005. It explored the comparative advantages of Sweden and the NL respectively, in light of Mali’s priorities, and made recommendations as to the forms and timetable for closer cooperation. Sida and the NL Embassy in Bamako will follow-up in 2006. 4.6 HIV/AIDS In February 2005, the SDC received a joint mission from the HIV/AIDS secretariat at Sida-HQs and the HIV/AIDS team in Lusaka, Zambia. The mission made a rapid inventory of Malian policy and capacity in the area of HIV/AIDS prevention as well as of the activities of other donors and the role of civil society. The mission subsequently recommended the SDC to provide support for institutional strengthening of the National HIV/AIDS Secretariat57, especially in the area of deconcentration and decentralisation. Swedish-Norwegian support would primarily be in the form of funding for the establishment of regional offices of the national Secretariat but may also include short or medium term technical assistance from other Sida partner countries in Southern and Eastern Africa with a long track record in combating HIV/AIDS. This type of support would be coherent with the crosscutting emphasis on decentralisation elsewhere in the Swedish-Norwegian contribution portfolio and synergies with other programs could be expected. During the mission, it was agreed that the HIV/AIDS team in Lusaka should be responsible for the initial and final preparation of the support. However, due to limited capacity of both the SDC and the Malian HIV/AIDS Secretariat58, the negotiations and further revision of the initial request for support have not yet born fruit. During 2006, the SDC, with the support of the HIV/AIDS team in Lusaka, will continue the discussions with the Malian HIV/AIDS Secretariat while also exploring other areas of intervention. 57 Le Secrétariat Exécutif du Haut Conseil National de Lutte contre le Sida (SE/HCNLS) 58 This limited capacity is in turn is partly explained by the set-up of a major WB and Global Fund funded HIV/AIDS program which “hi-jacks” much of the Secretariat’s available resources. 20 5.Office and Administrative Issues At the end of 2005, the Section for Development Cooperation in Bamako had three sent-out staff: the Counsellor for Development Cooperation (from August 2004), the Economist/Programme Officer for Budget Support and PFM (from February 2004) and the Counsellor for Administration (from August 2005). A sent-out regional Programme Officer for Democracy and Human Rights was recruited during 2005 to start in January 2006. He will be based at the SDC in Bamako but will work 40% for the SDC Burkina and 10% on regional issues. A national Programme Officer for Natural Resources Management was also recruited in 2005 and will likewise start in January 2006. The SDC has also expanded its local administrative staff. A receptionist/book-keeper has been hired on a permanent basis (September 05) in addition to the principal administrative assistant. Since the latter is on long term sick leave, a replacement has been hired for 6 months (October 05 till March 06). During 2005, the SDC has frequently had to hire an extra driver at times when the numbers of visitors (colleagues/consultants) peaked. In light of the expanded staff from 2006, a second driver is considered necessary and will be recruited in 2006. Since staff will almost double in 2006, the SDC will need to expand its premises. No long-term solution has yet been found but in the meantime, the SDC has rented an apartment in the same building, which will temporarily serve as a meeting room, archive/library, lunchroom and office space for visitors. As more clarity is obtained on the implications of the planned completion of the integration between Sida and the Swedish Ministry of Foreign Affairs in the field, the SDC will look into longerterm solutions. During 2005, the SDC received a much-appreciated visit by Sida’s IT service team. The ITC technology at the SDC has functioned well during the first part of 2005 but appears vulnerable to an increase in the number of users. A renewed visit and a revision of the existing equipment are of utmost importance for 2006. At present, the SDC lack the technical possibilities to access Sida’s central system for contribution planning and financial follow-up (PLUS) and is thus not in a position to receive the foreseen so-called “partial delegation” of financial resources. The SDC also received a visit of Sida’s internal auditors in September 2005. The office administration, with an emphasis on the management and accounting of funds, was deemed “satisfactory” while a number of areas for improvement were pointed out and will be followed-up in 2006. 21 In this context, it should be noted that the SDC only received a sent-out staff position for administration in August 2005 whereas the audit covered the period from October 2003 to June 2005. 22 23 50 154 882 0 0 8 38 528 1 660 0 0 1 660 266 635 75 000 191 635 175 227 994 46 9 39 122 490 2 103 1 288 1 288 3 391 211 819 49 684 162 135 01 Health 02 Education 04 HR & Democratic governance 05 Conflict, peace & security 07 Infrastructure 08 Trade, business & fin. syst 09 Natural resources&environm. 11 Other 15561 Non-governmental organisations Total 15571 Humanitarian assistance 06 Humanitarian assistance 15571 Humanitarian assistance Total Outside country allocation Total Grand Total Out of which: Norvegian Contribution Out of which: Swedish Contribution 155004 Mali Inside country allocation Total 15561 NonOutside country governmental allocation organisations 35 500 100 000 30 745 0 11 400 80 000 5 330 2 000 264 975 264 975 35 001 80 000 18 021 0 1 348 70 000 3 438 619 208 428 208 428 01 Health 02 Education 04 HR & Democratic governance 08 Trade, business & fin. syst 09 Natural resources&environm. 10 Budget support poverty red. 11 Other / Admin. Costs 11 Other / No sector stated Total 155004 Mali Forecast 2006 Main Sector Allocation Frame Inside country allocation Allocation Account Data Outcome 2005 0 0 0 314 900 105 000 209 900 0 0 0 0 0 0 0 0 0 35 500 100 000 32 100 0 20 100 110 000 4 700 12 500 314 900 314 900 Forecast 2007 “LIS 109 sheet 2”, showing disbursements one year back and plans for the present and the following two years, sorted by sector and sub sector. Country Report Annex 1: 151 HR & Demo 01 Mali I P A A7200743 A7260315 A7260258 72603055 Diakonia Mali 2004-6 72603046 Bice Mali 2003-2006 72600416 Review Bice Contribution ID and title 724 726 726 726 3 2 726 726 1 A 200601- 72300217 Mali Health 200906 sector support 200510- …. Extension NL 200606 agreement PRODESS I 724 Cmttee June 2006. Swedish Initially implemented by Carter Centre; later to Auth.? be integrated into the PDI New agreement on UNICEF's "Child Protection Programme" in Mali; from 2008 onwards Bridge support to Diakonia until next phase of LDG program, see below. Local Democratic Governance - continuation and expansion (?) Review in 2006? (to help identify new sources of funds?) New agreement covering two out of four of UNICEF's entire "Child Protection Programme" 726/SK in Mali Local Democratic Governance (LDG), in 726/HB & partnership with four NGOs: SNV (lead), PB Helvetas, Diakonia, AEN 733 723 723 5 3 2 723 Netherlands. 200510- Access to drinking water 200706 in regions 3, 4 and 5 733 733 733 733 1 Country Programme Activity Schedule and Financial Planning for Mali 140 water P Supply and Sanitation Developpement and Implementation o a PAGIRE / IWRM I A "Wetlands program" in the Niger Delta 200510- 73000437 Fuelwood 200906 Mali (GEDEFET NOUVEAU / DNCN) P 733/KP 1 106 500 000 Silent partnership with Holland; Assessment of new phase (PRODESS II) during 05-06; Sida Project Cmttee June 2006. 25 000 000 25 167 544 Awaiting PROSEPA, Sida may fund a short term water project with focus on decentralisation to CTs and / or preparatory activities for PROSEPA. 5 499 999 40 000 000 5 228 000 Support for the dev of a strategy for integrated water resource mgnm (2007) its implementation (2008) (?). Support to the GoM to implement the Int. Wetland Convention; involving several partners (CTs, IUCN, Wetlands, etc.). In close coop / cofunded with NL. Focus on decentralised forest mngm. Assessment and decision during 2006. 521 500 000 35 000 000 Silent partnership with NL. One yr extension of their existing agreement for PRODESS I 300 000 000 80 000 000 71 290 323 46 950 003 12 502 999 299 999 8 351 321 3 186 000 Human rights work Percent of current year's total country allocation (incl. budget support) Percent of current years total planned contributions for Mali (incl.budget support and overplanning) A A7300724 200404- 73000489 IUCN Delta 4 Project called "PAGEIT", focusing on 200607 du Niger Environment decentralised mngm of natural resources in the (?) Niger delta area; co-funded 50/50 with the 110 and 120 (Social sectors / DESA) Total 120 Health DAA Total = approx. agreement amount Children in distress (?) HQ field Source of Description andPlanned Strategic Activities per weeks field weeks contribution 2006 726 726 726 726 Resp. Unit includes Norwegian funds Percent of current year's total country allocation (incl. budget support) Percent of current years total planned contributions for Mali (incl.budget support and overplanning) 200501- ….Extension of PISE I Extension of existing agreement with 50% 110 A 200606 increase of funding level. Education 724 200601- 72000579 Education Silent partnership with Holland; Assessment of 200906 PISE II new phase (PISE II) during 05 - 06; Sida Project …. UNICEF Mali 200812 (?) … temporary support to Diakonia in Mali ….. Local Democratic Governance (contin. 200601- …. Access to 200812 Information 200510- ….. Local Democratic 200806 Governance 200508- 72600516 UNICEF Mali 200807 2005-7 200403200706 200310200706 200508200602 Agreem. ID Agreem. Period 151 HR & Demo Total Main Sector Alloc Account Title Country Programme Activity Schedule and Financial Planning Matrix Updated by Camilla 2006-08-07 300 000 8 000 000 1 500 000 115 500 000 35 500 000 80 000 000 16 067 998 3 000 000 6 000 000 300 000 892 080 2 875 918 Country Plan 2005 167 544 0 268 056 912 540 64% 55% 115 001 414 35 001 414 80 000 000 10% 9% 18 020 998 13 450 000 803 000 0 892 080 2 875 918 Actual 2005 -100% -97% -39% 0% -1% 0% 12% 348% -87% -100% 0% 0% 5 000 000 5 000 000 1 400 000 135 500 000 55% 51% 35 500 000 100 000 000 12% 11% 29 205 498 5 000 000 14 500 000 5 600 000 300 000 892 080 2 913 418 Difference Forecast 2006 comp. to plan in 2005 10 000 000 500 000 8 000 000 1 600 000 135 500 000 49% 43% 35 500 000 100 000 000 12% 10% 32 100 000 2 000 000 5 000 000 19 000 000 6 100 000 Forecast 2007 10 000 000 5 000 000 5 000 000 10 000 000 135 500 000 45% 37% 35 500 000 100 000 000 11% 9% 32 000 000 25 000 000 7 000 000 Forecast 2008 The up-dated Country Plan and Matrix for 2006–2008, including planned and actual figures for 2005 (per Aug 6, 2006). Country Plan and Matrix Annex 2: Status 24 2006-08-15 5 000 000 5 000 000 10 000 000 35 500 000 11% 10% 35 500 000 10% 9% 32 000 000 25 000 000 7 000 000 Forecast 2009 25 Contribution ID and title 200701- PROSEPA: sector 201112 program on access to drinking water Agreem. ID Agreem. Period 733 Resp. Unit 2 733/KP A sector wide approach for the sub-sectors drinking water and sanitation; may over time integrate part or all aspects of a PAGIRE (?) HQ field Source of Description andPlanned Strategic Activities per weeks field weeks contribution 2006 990 P … "The Enhancement Fund" …. Improved poverty analysis and monitoring 200601- ….. HIV/AIDS 200906 prevention 200601200906 200601200712 200501- … "The Enhancement 200606 Fund" A 1 2 381 381 381 211 212 215 132 Baseline and monitoring poverty data required for Malis's new 5 yr period PRSP (07-11) Yet un-identified: either inst support to SE/HCNLS, or sth on "Youth and Reproductive Health" Studies, mapping, technical assistance, seminars or short term support in prioritised areas. Same as above. Funds delegated to SDC from 2006. From nov 2006 ? 2009 (3 years) 200701- …. Preliminary 200X…. Norwegian budget support via Sweden 211 211 2 1 211 Percent of current year's total country allocation (incl. budget support) Percent of current years total planned contributions for Mali (incl.budget support and overplanning) 510 General Budget Support Total 510 I Norwegian Gen. Budget 201106 9 Other Total 3 Percent of current year's total country allocation (incl. budget support) Percent of current years total planned contributions for Mali (incl.budget support and overplanning) 200501- .. Budget Support 2005 510 General A 200906 2006 (2 years) Budget 132 211 1 Support I 200801- .. Budget support 2007 - Unallocated / unspecified 200506- NPO in Democratic ….. Governance P 4 and 140 Environment, Water and Sanitation (NATUR) Total 3 Percent of current year's total country allocation (incl. budget support) Percent of current years total planned contributions for Mali (incl.budget support and overplanning) 910 Admin A A2100234 199901- 21000065 Counsellor / Costs 200508 PO Mali 212 38000000 PO Budget Support / Social Sectors 212 200601- … RPO Mali in HR / ….. Demo From January 2006 212 200510- …..NPO in Natural ….. Resosurce Mngm From January 2006 212 Main Sector Prel. Total Country plus General Budget Support Allocation Prel. Norwegian General Budget Support Allocation Prel. Total Country Allocation Prel. Country Allocation (Norway), SEK Prel. Country Allocation (Sida), SEK Percentage share of Norwegian Funds in above sectors (incl. Prel. budgetsupport) Grand Total for Sectors including Norwegian Funds (incl prel. budgetsupport) Percentage share of Norwegian Funds in above sectors Grand Total for Sectors including Norwegian Funds (excl. prel. budgetsupport) Overplanning in relation to total country allocation (incl. Budget support) Planned annual increase Grand Total Alloc Account Title Status 1 642 738 1 800 000 1 166 304 508 400 000 000 0 245 000 000 0 179 683 569 245 000 000 179 683 569 170 000 000 263 485 498 26% 8% 142 605 498 53% 222 605 498 34% 75 000 000 5% 33% 30% 80 000 000 49 683 569 130 000 000 198 917 998 208 427 615 81% 16% 99 987 781 50% 169 987 781 29% 39% 34% 0 80 000 000 70 000 000 40% 40% 0 70 000 000 70 000 000 180 000 000 50 000 000 50 000 000 150 000 000 275 000 000 30 000 000 245 000 000 75 000 000 170 000 000 314 900 000 20% 15% 164 700 000 46% 274 700 000 38% 40% 35% 110 000 000 30 000 000 80 000 000 0 5 000 000 4 057 063 2% 2% 17 200 000 6% 5% 6 550 000 27 618 642 0 5 000 000 2 500 000 0 350 000 350 000 2 000 000 7 380 000 3% 3% 2 000 000 0 30 000 350 000 1 000 000 2 000 000 2 000 000 7% 6% 5% 4% 2 000 000 20 100 000 11 400 000 Forecast 2007 10 000 000 -38% -75% -9% 0% -88% Difference Forecast 2006 comp. to plan in 2005 0 0 618 643 1 795 682 1 800 000 2 500 000 1 348 140 1% 1% Actual 2005 10 800 000 Country Plan 2005 10 000 000 7 000 000 618 642 145 895 543 45 000 000 DAA Total = approx. agreement amount 300 000 000 40 000 000 260 000 000 70 000 000 190 000 000 364 700 000 16% 22% 184 500 000 38% 324 500 000 34% 47% 38% 140 000 000 40 000 000 100 000 000 0 17 200 000 6% 5% 5 000 000 5 000 000 2 500 000 0 350 000 350 000 2 000 000 2 000 000 13% 11% 40 000 000 10 000 000 Forecast 2008 310 000 000 40 000 000 270 000 000 70 000 000 200 000 000 77% 70% 342 200 000 -6% 10% 62 000 000 113% 302 000 000 36% 240 000 000 40 000 000 200 000 000 4 700 000 2% 1% 350 000 350 000 2 000 000 2 000 000 10% 9% 30 000 000 10 000 000 Forecast 2009 Annex 3: Indicators for Monitoring of the PRS Mali’s short-list of 46 indicators for monitoring of the PRS. No Indicateurs par secteur/Années Objectif 2002 2003 2004 2005 6,1 CSLP 2006 UNE CROISSANCE ACCELEREE ET REDISTRIBUTIVE Croissance accélérée soutenue 1 Taux de croissance réelle du PIB 2 Taux d’investissement global 6,7% 4,3% 7,4% 2,2% 22,7% 18,8% 26,03% 19,48% -0,1% 0,1% 1,0% 0,1% <3% 5% -1,3% -3,1% -4,2% -9,4% -5,7% Stabilité financière 3 Solde budgétaire de base sur PIB nominal 4 Taux d’inflation annuel 5 Solde extérieur courant hors dons sur PIB nominal <=-8,5% 6 Taux de pression fiscale (norme ≥ 17) >=16,4% 7 Ratio Service de la dette sur recettes d’exportation 13,4% 15,2% 15,4% 15,3% 14,0% 10,0% Pauvreté 8 Incidence de la pauvreté monétaire 68,3% - - 9 Incidence de la pauvreté de conditions de vie (ou pauvreté de masse) 47,5% 63,8% - - 10 Pourcentage des dépenses budgétaires liées à la réduction de la 61,18% 57,78% 58,75% 40,0% 40,0% 40,0% - 43,07 pauvreté 11 Indice de Gini (inégalité des revenus et consommation) DEVELOPPEMENT INSTITUTIONNEL, AMELIORATION DE LA GOUVERNANCE ET DE LA PARTICIPATION Gouvernance et participation 12 Taux de participation aux élections nationales et locales 13 Pourcentage des ressources des programmes de développe- 30,90 ment utilisées par la société Civile 14 Nombre d’enfants enregistrés à la naissance 246.277 Développement institutionnel 15 Pourcentage des ressources financières effectivement transférées aux collectivités décentralisées 16 Pourcentage des ressources financières transférées des - 29,41% administrations centrales aux services déconcentrés Lutte contre la corruption 17 Perception du degré de corruption de l’Administration 13% 30% 32324 29837 Renforcement des capacités et de la crédibilité de la justice 18 Nombre de juges par habitant DEVELOPPEMENT HUMAIN DURABLE ET RENFORCEMENT DE L’ACCES AUX SERVICES SOCIAUX DE BASE Santé et démographie 19 Taux de mortalité des enfants de moins de 5 ans (pour 1000) 20 Taux de couverture vaccinale DTCP3 chez les enfants de moins de 1 an 26 229,1 229,1 229,1 74% 79% 85% 59,2% 21 22 Taux de mortalité maternelle 582 - - Taux d’accouchement assistés 40,45% 42,00% 46,00% % de population vivant dans un rayon de 5 Km d’un centre de 44,00% 46,00% 47,00% santé fonctionnel 23 Nombre moyen de consultations prénatales par femme 2,49 - 1,98 2,10 54,35% 59,00% 69,00% 38,3% - - 1,9% 1,9% 1,9% 10,7% 10,23% 11,09% 94,30% 98,11% 100,00% Taux brut de scolarisation au 1er cycle 64,34% 67,00% 70,50% Taux brut de scolarisation au 1er cycle des filles 53,70% 56,40% 59,90% 21,3% 24,0% Taux de couverture CPN 24 Pourcentage d’enfants de moins de 5 ans présentant une insuffisance pondérale 25 Taux de prévalence VIH/SIDA parmi les femmes enceintes âgées de 15 à 24 ans 26 Part du budget de la santé dans le budget de l’État 27 Taux d’exécution du budget ordinaire alloué à l’achat de médicaments et de vaccins Education 28 29 Taux d’alphabétisation des 15 ans et plus 30 Part du budget de l’Education dans le budget d’État 29,00% 29,60% 29,15% 31 Taux d’exécution du budget ordinaire alloué à l’achat de 99,56% 99,74% 99,54% 72,1 67 57 20,00% 19,80% 19,00% 81,6% 81,4% 83,04% 7,5% 9,1% 4,9% 7,1% 9,0% 2.583.816 3.380.885 2.977.937 5.157 7.048 8.498 111.918 85.173 111.284 2830,73 2473,11 4068,75 matériels didactiques 32 Ration élèves/maître au 1er cycle (public) 33 Pourcentage des redoublants au 1er cycle Eau potable 34 Pourcentage de villages bénéficiaires d’au moins 1 point d’eau potable Participation des femmes 35 Proportion de femmes bénéficiant de microcrédit Emploi 36 Taux de chômage DEVELOPPEMENT DES INFRASTRUCTURES DE BASE ET SECTEURS PRODUCTIFS Production agricole, alimentation et nutrition 37 Production céréalière totale (en milliers de tonnes) 38 Superficies (ha) aménagées en maîtrise totale de l’eau 39 Production de coton fibre (tonnes) Gestion des ressources naturelles 40 Superficies reboisées (ha) Transport/communication/énergie 41 Nombre de Km de routes en terre construites (entretenues) 5976 5550 5834 42 Nombre de Km de routes bitumées construites (entretenues) 3024 2950 3307 43 Taux d’exécution du BSI (financement intérieur) alloué à 100,42% 98,41% 100,00% 12,0% 13,0% 14,13% l’entretien routier 44 Nombre de villages branchés sur un réseau téléphonique 45 Taux d’électrification Industrie et Commerce 46 Taux de transformation interne du coton 0,8% 27 Other Relevant Reference Documents The Strategy for Swedish Development Cooperation with Mali 2004–2006 (approved in Sept 2004; subsequently extended to cover also 2007). The Country Plan for Development Cooperation with Mali 2005–2007 ( January 2005). The revised Country Plan for Development Cooperation with Mali 2006–2008 (August 2006). Sida Country Report 2004 (April 2005). Sida semi-annual report on development cooperation with Mali (Nov 05). The Swedish MFA’s Report on Human Rights in Mali . (www.manskligarattigheter.gov.se). The Memo on Sida’s suggested General Budget Support to Mali 2005 and 2006 (Dec 05). Agreed Minutes from the First Annual Swedish/Norwegian – Malian Consultations (May 2005). Report from the visit of Sida’s internal auditors to the SDC Mali (Sept 05). Reference Document and Final Report on Mali's first PRS Review ( June 06). 28 Halving poverty by 2015 is one of the greatest challenges of our time, requiring cooperation and sustainability. The partner countries are responsible for their own development. Sida provides resources and develops knowledge and expertise, making the world a richer place. SWEDISH INTERNATIONAL DEVELOPMENT COOPERATION AGENCY SE-105 25 Stockholm Sweden Phone: +46 (0)8 698 50 00 Fax: +46 (0)8 20 88 64 [email protected], www.sida.se