Sheet D Imperial Working Drawing Template
Transcription
Sheet D Imperial Working Drawing Template
Note: Contractor to supply and install hollow metal post, concealed to new partial height partition at the floor ramp. Posts are to be fastened to the concrete slab at end and middle to ensure stability of partition. Shop drawings are to be issued for Designer approval Corner Bead (Typical) U/S of existing concrete slab Acoustical caulk 2 1/2" metal studs @ 16" o.c. c/w 1/2" gypsum board both sides. Tape, fill & sand smooth ready for paint or other finish. CORPORATE SERVICES REAL PROPERTY ASSET MANAGEMENT DESIGN & CONSTRUCTION Acoustical caulk Paint grade hollow metal frame. Painted P3. Paint grade hollow metal frame. Painted P3. 2 1/2" metal studs @ 16" o.c. c/w 1/2" gypsum board both sides. Tape, fill & sand smooth ready for paint or other finish. Metal runner Blocking as required KENT KIRKPATRICK GENERAL MANAGER / DIRECTEUR GENERAL S.A. FINNAMORE, O.A.A. DIRECTOR / DIRECTEUR, O.A.O. ROBERT VAILLANCOURT, O.A.A. MANAGER / GESTIONNAIRE, O.A.O. FOR / POUR 2 1/2" sound attenuation batts suitable for metal stud application Solid core - paint grade door. Painted P3. DEPARTMENT OF CORPORATE SERVICES / SERVICES GENERAUX REAL PROPERTY ASSET MANAGEMENT BRANCH / DIRECTION DE LA GESTION DES ACTIFS ET DES BIENS IMMOBILIERS DESIGN AND CONSTRUCTION DIVISION / DIVISION DE LA CONCEPTION ET DE LA CONSTRUCTION 2 1/2" sound attenuation batts suitable for metal stud application Baseboard as applicable 1 5/8" solid core paint grade door. Painted P3. Line of existing concrete ramp beyond. Metal runner (Typical) Belfast Road Acoustical caulk Line of finished floor as applicable St-Laurent Boulevard 1 Door Type 'A' ID05 Scale: 1/2" =1' - 0" 2 Section at Door Type 'A' ID05 Scale: 3" =1' - 0" Line of existing concrete slab 5 4 Baseboard as applicable Line of finished floor Heavy duty hinge 3 ISSUED FOR TENDER 2010/08/24 EP 2 99% CLIENT REVIEW 2010/08/10 EP 99% CLIENT REVIEW 2010/08/06 EP MILESTONE / FAIT SAILLANT (Y/M/D) DATE: (A/M/J) INITIALS INITIALES 1 Blocking as required 1 5/8" solid core paint grade door 6 Paint grade hollow metal frame 3 Section at Door Type 'A' ID05 Scale: 3" =1' - 0" H1: Passage Lever Set Heavy duty commercial grade hinges, 1 12" pair per door Floor surface mounted door stop suitable for Epoxy file Clear silicone door silencers Finish to match existing building standard H2 Lever Lock Set Heavy duty commercial grade hinges, 1 12" pair per door Floor surface mounted door stop suitable for Epoxy file Clear silicone door silencers Surface mounted door closer Finish to match existing building standard 1. Contractor to paint door and frames on contract side only. 2. Contractor to paint both sides of door and frames. NUMBER/ NUMÉRO 5 Partial Height Partition - W1 ID05 Scale: 6" =1' - 0" 6 Interior Tenant Partition - W2 ID05 Scale: 6" =1' - 0" EP EP MD As Noted DETAIL NUMBER 1 DRAWING TITLE A1.1 SCALE: SHEET NUMBER U/S of existing concrete slab Acoustical caulk Existing base building core partition. U/S of existing concrete slab Acoustical caulk THIS DRAWING IS THE PROPERTY OF THE CITY OF OTTAWA AND ALL COPYRIGHT IS RESERVED. DIMENSIONS ON DRAWING ARE FOR ESTIMATING PURPOSES ONLY. IT IS THE RESPONSIBLITY OF EACH CONTRACTOR AND SUB-CONTRACTOR OR CONSULTANT TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE. NOTIFY OWNER OF ANY ERRORS OR OMISSIONS PROIR TO COMMENCING THE WORK. DO NOT SCALE THE DRAWINGS. CE DESSIN CONSTITUE LA PROPRIÉTÉ DE LA VILLE D'OTTAWA ET TOUT DROIT D'AUTEUR EST RÉSERVÉ. LES DIMENSIONS UTILISÉES LE SONT À DES FINS D'ESTIMATION SEULEMENT. IL INCOMBE À CHAQUE ENTREPRENEUR, SOUS-CONTRACTANT OU CONSULTANT DE VÉRIFIER TOUTES LES DIMENSIONS ET LES CONDITIONS SUR LE CHANTIER. VEUILLEZ INFORMER LE PROPRIÉTAIRE DE TOUTE ERREUR OU OMISSION AVANT D'ENTAMER LES TRAVAUX. NE DRESSEZ PAS LES PLANS À L'ÉCHELLE. Existing base building core partition. ARCHITECT / ARCHITECTE CONSULTANT / EXPERT-CONSEIL O A RID 1 1/2" metal studs @ 16" o.c. c/w 1/2" gypsum board on one sides. Tape, fill & sand smooth ready for paint or other finish. CONSULTANT / EXPERT-CONSEIL Existing metal stud application to remain. Typical. Contractor to supply and installed 1 2" GWB to existing metal stud application. Finished to receive paint. Typical. Existing concrete block and wall and concrete beam to remain. CONSULTANT / EXPERT-CONSEIL 1 layer of 1/2" gypsum board to u/s of slab New fluorescent light fixture. Refer to Reflected Ceiling Plan ID03. Contractor to supply and installed 12" plywood finished with L2. Typical. Align PROJECT / LOCATION / PROJET / ENDROIT Baseboard as applicable Baseboard as applicable OC TRANSPO - ANNEX Acoustical caulk Acoustical caulk SECOND FLOOR - SOUTH GARAGE Line of finished floor as applicable OTTAWA, ONTARIO Line of finished floor as applicable DRAWING / DESSIN Line of existing concrete slab 4 Section at Bulkhead ID05 Scale: 6" =1' - 0" 7 Interior Tenant Partition - W3 ID05 Scale: 6" =1' - 0" DOOR SCHEDULE AND ELEVATIONS, DOOR SECTIONS PARTITION SECTIONS AND CEILING SECTION 8 Interior Tenant Partition - W4 ID05 Scale: 6" =1' - 0" FACILITY NO. / NO. DE INSTALLTIONS 04256-0206 PROJECT NO. / PROJET NO. 10048 SHEET NO. / FEUILLE No. ID05