Sheet D Imperial Working Drawing Template

Transcription

Sheet D Imperial Working Drawing Template
Door Schedule - Ground Floor
U/S of existing steel pan deck
INFRASTRUCTURE SERVICES & COMMUNITY SUSTAINABILITY /
SERVICES D'INFRASTRUCTURE ET VIABILITÉ DES COLLECTIVITÉS
INFRASTRUCTURE SERVICES BRANCH /
DIRECTION D'INFRASTRUCTURE
DESIGN AND CONSTRUCTION DIVISION /
DIVISION DE LA CONCEPTION ET DE LA CONSTRUCTION
Door
Frame
Quantity Door Number Door Type
Hardware Set No. Notes
Width/Height/Thickness Material Finish Material Finish
1
101A
A
+914mm x +2134mm x
45mm x2
Aluminum door
w/ glass insert
1
101B
R
+914mm x +2134mm x
45mm x2
Aluminum door
w/ glass insert
Suspended acoustical tile ceiling.
N/A
Aluminum
frame
N/A
Aluminum
frame
N/A
N/A
Refer to architectural drawings for details
pertaining to the exterior glass doors.
H1
DEPUTY CITY MANAGER / DIRECTEUR DES SERVICES MUNICIPAUX
DIRECTOR / DIRECTEUR
MANAGER / GESTIONNAIRE
Reinstate glass door w/ aluminum
frame assembly. Reinstate card
reader and electric strike.
H1
FOR / POUR
INFRASTRUCTURE SERVICES & COMMUNITY SUSTAINABILITY
INFRASTRUCTURE SERVICES
DESIGN & CONSTRUCTION - BUILDINGS
Door Schedule - 2nd Floor
Acoustical Building Felt Liner.
Quantity Door Number Door Type
"L" trim (Typical).
202
B
+914mm x +2134mm x
45mm
Maple Wood to
match existing
N/A
204
E
+914mm x +2134mm x
45mm
Existing to
remain
P2
Building Standard Ceiling 'T' Clip.
1
65mm 25 gauge steel metal studs @
410mm o.c. c/w 15mm gypsum board
both sides. Tape, fill & sand smooth
ready for paint or other finish.
Door
Frame
Hardware Set No. Notes
Width/Height/Thickness Material Finish Material Finish
Maple veneer
Frame to match Clear
existing
Hollow Metal
P2
H2
N/A
211-2141 Thurston Drive
Ottawa ON K1G 6C9
1
LWG-ai.com
[email protected]
Install new 18mm drywall
bulkhead to cover new
structural beams. Refer to
architectural drawings for
details.
Baseboard as applicable.
Metal runner (Typical).
6mm drywall reveal
detail to match existing
New maple wood
veneer door to match
existing
Reinstate existing
glazing c/w framing
assembly
Acoustical caulk.
New maple wood frame
to match existing
Line of finished floor as applicable.
Replace framing top
caps were damages
and as required to
match existing
Line of existing concrete slab.
W1 - Interior Partition - Underside of
T-Bar Ceiling
1:2
6
5
New hardware as per
schedule
Reinstate existing
power door operator
3112
1
ID9
T 613-739-3699
F 613-739-3965
New 6mm glass insert
c/w CGC window film.
Refer to specification on
page ID10, elevation
1 / ID10.
Reinstate existing glass
doors c/w aluminum
frame
4
Issued for tender
28-08-2013
MB
3
Issued for Final client review
13-08-2013
MB
2
Issued for 90% client review
23-07-2013
MB
1
Issued for 60% client review
26-06-2013
MB
NUMBER/
NUMÉRO
MILESTONE / FAIT SAILLANT
DG
DATE:
(Y/M/D)
(A/M/J)
INITIALS
INITIALES
DG
MB
SCALE
U/S of existing concrete slab
1 DRAWING TITLE
A1.1 SCALE:
SHEET NUMBER
Reinstate existing
barrier-free push button
Acoustical caulk
4
ID9
1000
Non-adhesive, Non-staining Continuous
Compressible Gasket
Elevation - Door Type B
6mm reveal
to be painted
out to match
wall
Blocking as
required
13 4" solid
paint grade
door
1:20
Suspended acoustical tile ceiling.
Room
Interior
Corridor
Side
1828
Acoustical Building Felt Liner
Building Standard Ceiling 'T'
Clip
CE DESSIN CONSTITUE LA PROPRIÉTÉ
DE LA VILLE D'OTTAWA ET TOUT DROIT
D'AUTEUR EST RÉSERVÉ. LES
DIMENSIONS UTILISÉES LE SONT À DES
FINS D'ESTIMATION SEULEMENT. IL
INCOMBE À CHAQUE ENTREPRENEUR,
SOUS-CONTRACTANT OU CONSULTANT
DE VÉRIFIER TOUTES LES DIMENSIONS
ET LES CONDITIONS SUR LE CHANTIER.
VEUILLEZ INFORMER LE PROPRIÉTAIRE
DE TOUTE ERREUR OU OMISSION
AVANT D'ENTAMER LES TRAVAUX. NE
DRESSEZ PAS LES PLANS À L'ÉCHELLE.
1
Elevation - Door Type R
ARCHITECT / ARCHITECTE
CONSULTANT / EXPERT-CONSEIL
RID
Silicone bead
1
4" tempered
glass insert
1:20
5
ID9
65mm 25 gauge steel metal studs @ 410
o.c. c/w 15mm gypsum board both sides.
Tape, fill & sand smooth ready for paint or
other finish.
65mm sound attenuation batts suitable for
metal stud application
6mm reveal
to be painted
out to match
wall
Corridor
Side
Baseboard as applicable
Section - Door
1:5 Header
CONSULTANT / EXPERT-CONSEIL
13mmx13mm
solid stock
glazing stop
Line of
header
above
O
"L" trim (Typical)
3A
ID9
1
2"x 2" solid
stock glazing
stop
THIS DRAWING IS THE PROPERTY OF
THE CITY OF OTTAWA AND ALL
COPYRIGHT IS RESERVED.
DIMENSIONS ON DRAWING ARE FOR
ESTIMATING PURPOSES ONLY. IT IS
THE RESPONSIBLITY OF EACH
CONTRACTOR AND SUB-CONTRACTOR
OR CONSULTANT TO CHECK AND
VERIFY ALL DIMENSIONS AND
CONDITIONS ON SITE. NOTIFY OWNER
OF ANY ERRORS OR OMISSIONS PROIR
TO COMMENCING THE WORK. DO NOT
SCALE THE DRAWINGS.
A
2084
DETAIL NUMBER
Reinstate existing
hardware
CONSULTANT / EXPERT-CONSEIL
6mm reveal
to be painted
out to match
wall
Silicone
bead
Metal runner (Typical)
PROJECT / LOCATION / PROJET / ENDROIT
Reinstate push button in
previous location.
Acoustical caulk
Line of finished floor as applicable
6
ID9
1000
Line of existing concrete slab
2
ID9
Room
Interior
Refer to architectural
drawing on page XX for
details on the exterior
facade.
W2 - Interior Partition - c/w Plenum Barrier
1:2
6mm
tempered
glass insert
45mm solid
paint grade
door
Heavy duty
hinge
Section - Door Jamb
1:5
Services Building Renovation
Phase 2
1 River St. 2nd Floor
OTTAWA, ONTARIO
DRAWING / DESSIN
Partition Details, Door
Schedule, Door
Elevations & Door Details
FACILITY NO. / NO. DE INSTALLTIONS
3B
ID9
Elevation - Door Type A
TBC
PROJECT NO. / PROJET NO.
1:20
11080SPTI3
SHEET NO. / FEUILLE No.
ID09