Demurrage

Transcription

Demurrage
TARIFF OF DEMURRAGE AND DETENTION
DEFINITIONS:
“Demurrage”: the charge, related to the use of the equipment only, the merchant pays for carrier's
equipment kept beyond the free time allowed by the carrier for taking delivery of goods in the port,
terminal or depot.
“Detention”: the charge the merchant pays for detaining carrier's equipment outside the port, terminal
or depot, beyond the free time.
“Free time”: the period of time allowed to the merchant free of charge, covering both demurrage
period and detention period, beyond which additional charges such as, but not limited to demurrage
and detention charges, will be due to the Carrier.
Demurrage and Detention do not include storage costs and reefer services which are charged
separately.
“Storage Costs”: those costs related but not limited to quay rent, charged to both carrier's equipment
and shipper's equipment for containers staying on ground.
“Reefer Services”: these services such as Power supply and Monitoring.
If not otherwise specified in the tariff grid, a merged (or combined) demurrage & detention rate is
applied.
“Carrier” means the Party on whose behalf the Bill of Lading is issued.
“Merchant” includes the Shipper, Holder, Consignee, Receiver of the Goods, any Person owning or
entitled to the possession of the Goods or of this Bill of Lading and anyone acting on behalf of any
such Person.
DIAGRAMS FOR SAKE OF ILLUSTRATION ONLY:
IMPORT
date of return of empty equipment in the terminal or
a depot
container date of
discharge
date of exit from the terminal
In port
outside the port
free time
1
combined demurrage & detention :
use of the ctnr by the merchant
2
service rendered for refrigerated
cargo
3
costs occured by the full ctnr within
the terminal such as quay rent,
storage costs, etc…
excess time
combined
demurrage/detention
paid by merchant
no cost for the merchant
free time
no cost for the
merchant
excess time
paid by merchant
free time
excess time
no cost for the
merchant
paid by merchant
usually called the demurage period
usually called the detention period
This diagram illustrates the case of a given D&D free time ending outside the port
first charge date is country specific
EXPORT
date of pick up of the empty
equipment from the terminal/depot
in port or in
depot
outside the port
free time
1,1
combined demurrage & detention :
use of the ctnr by the merchant
1,2
OR detention followed by
demurrage: use of the ctnr by the
merchant
2
service rendered for refrigerated
cargo
costs occured by the full ctnr within
3
the terminal such as quay rent,
storage costs, etc…
no cost for the merchant
no cost for the
merchant
date of loading
date of entrance in the terminal of
the full container
no cost for the
merchant
in port
free time
excess time
combined demurrage/detention paid by merchant
combined demurrage/detention paid by
merchant
(*)
no cost for the merchant
paid by merchant
free time
excess time
no cost for the merchant
paid by merchant
free time
excess time
no cost for the merchant
paid by merchant
This diagram illustrates the case of a given combined D&D free time ending outside the port
TARIFF GRID SIGNIFICATION:
In the Grid, standard conditions are written in bold font; exceptions in normal font.
COUNTRY
CODE:
IMPORT /
EXPORT:
PLACES:
SIZE:
ALL means all countries not otherwise specified; UN code for countries;
IMPORT means inbound to the concerned port/inland depot; EXPORT means outbound;
ALL means: all locations except those places namely listed in this grid; terminal or depot;
several places can be listed in the same cell; pre or post carriage mode can be mentioned
when required for differentiating the conditions;
ALL means: all sizes; 40' includes 45' if not otherwise specified
TYPE:
DRY means: all types of dry equipment GP and SP (reefer equipment excluded) if not
otherwise specified; GP means general purpose equipment and includes High Cubes (HC) if
not otherwise specified; SP means special dry equipment such as but not limited to flat rack,
platform, open top, etc…; pere default tanks are included into SP; RF = all types of reefer
equipment, excluding insulated containers; NOR means “Non Operating Reefer”; this tariff
is container related.
FREE TIME:
figure in days
DAYS TYPE:
AFTER FREE
TIME DAY N°:
CHARGE:
CALENDAR (C) or WORKING (W) days
CURRENCY:
deMurrage,
merGed,
deTention
main currencies used are EURO, GBP or USD; other currencies as required;
day number since discharge
amount per day; each day or part thereof is due in full
M = demurrage charge only; T = detention charge only; G = merged demurrage & detention
charge
(*) EXPORT: if not otherwise specified, after entrance in the terminal, the container is deemed to be loaded on the next
available sailing; in case the merchant retains the export order, the line may charge the merchant of demurrage for the period
beyond 14 calendar days for DRY containers (if not otherwise specified in the grid) and 5 calendar days for RF containers (if
not otherwise specified in the grid) after entrance in the terminal, at the rates indicated in the tariff.
RATES AND FREE TIME AS PER ANNEXES HEREAFTER (INCLUDING A SEPARATE
ENTRY FOR THE REEFER SERVICES IF ANY) VALID FOR ALL TRADES AS FROM
THE INDICATED “EFFECTIVE DATE” OF DISCHARGE (IMPORT) OR DATE OF PICK
UP OF EMPTY CONTAINER (EXPORT). FOR US TRADES THE EFECTIVE DATE WILL
REMAIN THE DATE AS PER FMC RULES AT TIME OF FILING
Attached tariff for country = FRANCE
TARIFF APPLICABLE TO D&D
COUNTRY
CODE
COUNTRY NAME
IMPORT /
EXPORT
PLACES SIZE
TYPE
FREE DAYS
TIME TYPE
AFTER FREE TIME
DAY N°
CHARGE CURRENCY
DAYS
TYPE
deMurrage,
merGed,
deTention
Effective
Date
FR
FRANCE
IMPORT
ALL
20
GP
7
C
FROM 8th TO 12th
35
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
GP
7
C
FROM 13th TO 20th
50
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
GP
7
C
FROM 21st ONWARDS
60
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
GP
7
C
FROM 8th TO 12th
55
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
GP
7
C
FROM 13th TO 20th
90
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
GP
7
C
FROM 21st ONWARDS
120
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
RF
5
C
FROM 6th TO 7th
95
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
RF
5
C
FROM 8TH ONWARDS
130
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
RF
5
C
FROM 6th TO 7th
95
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
RF
5
C
FROM 8TH ONWARDS
130
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
SP
7
C
FROM 8th TO 12th
45
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
SP
7
C
FROM 13th ONWARDS
90
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
SP
7
C
FROM 8th TO 12th
90
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
SP
7
C
FROM 13th ONWARDS
180
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
NOR
7
C
FROM 8th TO 12th
35
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
NOR
7
C
FROM 13th TO 20th
50
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
NOR
7
C
FROM 21st ONWARDS
60
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
NOR
7
C
FROM 8th TO 12th
55
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
NOR
7
C
FROM 13th TO 20th
90
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
NOR
7
C
FROM 21st ONWARDS
120
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
GP-HAZ
7
C
FROM 8th TO 12th
60
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
20
GP-HAZ
7
C
FROM 13th ONWARDS
80
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
GP-HAZ
7
C
FROM 8th TO 12th
100
EUR
C
G
01/01/2017
FR
FRANCE
IMPORT
ALL
40
GP-HAZ
7
C
FROM 13th ONWARDS
140
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
GP
12
C
FROM 13th TO 17th
35
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
GP
12
C
FROM 18th ONWARDS
50
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
GP
12
C
FROM 13th TO 17th
50
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
GP
12
C
FROM 18th ONWARDS
90
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
RF
7
C
FROM 8th TO 14th
95
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
RF
7
C
FROM 15th ONWARDS
130
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
RF
7
C
FROM 8th TO 14th
95
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
RF
7
C
FROM 15th ONWARDS
130
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
SP
12
C
FROM 13th TO 17th
50
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
SP
12
C
FROM 18th ONWARDS
100
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
SP
12
C
FROM 13th TO 17th
100
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
SP
12
C
FROM 18th ONWARDS
200
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
NOR
12
C
FROM 13th TO 17th
35
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
NOR
12
C
FROM 18th ONWARDS
50
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
NOR
12
C
FROM 13th TO 17th
50
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
NOR
12
C
FROM 18th ONWARDS
90
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
GP-HAZ
9
C
FROM 10th TO 15th
38
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
20
GP-HAZ
9
C
FROM 16th ONWARDS
53
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
GP-HAZ
9
C
FROM 10th TO 15th
60
EUR
C
G
01/01/2017
FR
FRANCE
EXPORT
ALL
40
GP-HAZ
9
C
FROM 16th ONWARDS
98
EUR
C
G
01/01/2017
* In case of booking cancellation, no free time applicable

Documents pareils