Site Specific
Transcription
Site Specific
NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 1 of 6 Nuclear Generation Limited Company Specification Generic Emergency Handbook (Nuclear Generation) Section 16 Emergency Equipment Originated by: John Babb Emergency Planning Group Date: January 2013 Reviewed by: EP Peer Group Date: January 2013 Approved by: John Skegg Head of Emergency Planning Group Date: January 2013 Revision Amendment Impact level Date 003 Document converted to current EDF NG template Changes include company name and organisational updates Minor January 2013 © 2013 Published in the United Kingdom by EDF Energy Nuclear Generation Ltd. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder, EDF Energy Nuclear Generation Ltd, application for which should be addressed to the publisher. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature. Requests for copies of this document should be referred to Barnwood Document Centre, Location 12, EDF Energy Nuclear Generation Ltd, Barnett Way, Barnwood, Gloucester GL4 3RS (Tel: 01452-652791). The electronic copy is the current issue and printing renders this document uncontrolled. Controlled copy-holders will continue to receive updates as usual. LIMITATION OF LIABILITY – Whilst EDF Energy Nuclear Generation Ltd believes that the information given in this document is correct at the date of publication it does not guarantee that this is so, nor that the information is suitable for any particular purpose. Users must therefore satisfy themselves as to the suitability of the information for the purpose for which they require it and must make all checks they deem necessary to verify the accuracy thereof. EDF Energy Nuclear Generation Ltd shall not be liable for any loss or damage (except for death or personal injury caused by negligence) arising from any use to which the information is put. NOT PROTECTIVELY MARKED Parent Document Ref: BEG/ICP/QUA/DM/003 Template Ref: BEG/FORM/QUA/002 Rev 022 NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 2 of 6 Contents 16.1 Emergency Control Centre And Alternative Emergency Control Centre.................. 3 16.2 Central Control Room / Main Control Room............. Error! Bookmark not defined. 16.3 Muster Points ......................................................................................................... 3 16.4 On-Site Survey Vehicle........................................................................................... 4 16.5 Equipment List: Off-Site Survey Vehicle ................................................................. 5 16.6 Access Control Point .............................................................................................. 6 16.7 Incident Response Team........................................................................................ 6 16.8 Standby Emergency Response Team .................................................................... 6 16.9 First Aid And Medical Decontamination Centres ..................................................... 6 16.10 Gatehouse.............................................................................................................. 6 16.11 Breathing Apparatus............................................................................................... 6 16.12 FLASK/NAIR .......................................................................................................... 6 16.13 Miscellaneous......................................................................................................... 6 edfenergy.com NOT PROTECTIVELY MARKED NOT PROTECTIVELY MARKED 16.1 BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 3 of 6 Emergency Control Centre And Alternative Emergency Control Centre (Site Specific) 16.2 Central Control Room / Main Control Room (Site Specific) 16.3 Muster Points (Site Specific) edfenergy.com NOT PROTECTIVELY MARKED NOT PROTECTIVELY MARKED 16.4 BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 4 of 6 On-Site Survey Vehicle Dedicated electric enclosed vehicle or near equivalent UHF radio Air sampler (R&M EASL 50 12v) Air sample volume meter (see Off-Site Survey list for details) Timer NE 710 BP4 castle (set of 10% 4 using BNL C1-36 Maypack source) Mini Instruments 6-90 scaler (with modification to give 899.99 fsd) 100 : 1 attenuator Castle Maypack jig Castle GFA air sample counting tray Maypack air sample adaptor Normal GFA air sample head Dose rate meter type RO2 Dose rate meter type RM5/BP4 Dose meter type ...... 20 Maypacks in sealed containers BNL C1-36 check-source Maypack CO2 detector Respirators with charcoal filters Waterproof nylon coveralls with hoods PVC overshoes Rubber gloves Disposable gloves Safety helmets Pens 50 x forms EP/10.2/2 25 x preliminary sample forms EP/10.2/1 On-site Survey sample point map Torch and spare batteries 10 Potassium Iodate tablets and water Assorted polythene bags Installed BA bottle trolley system 2 x escape BA sets edfenergy.com NOT PROTECTIVELY MARKED NOT PROTECTIVELY MARKED 16.5 BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 5 of 6 Equipment List: Off-Site Survey Vehicle Suitable vehicle with amber beacon and internal fluorescent lights Air Sampler (R & M EASL 50, 12v) Air Sample Volume meter (Parkinson Cowen Gasmeter U6 synthetic diaphragm without CLWs m scale) (delete “m3”) and decimal point from scale to give litres) NE 710 BP4 Castle (set to 10% Eff using BNL Cl-36 Maypack) with PB4/4 probe Mini Instruments Type 6 – 9 (modified 6-90) scaler (set for operation with NE Technology probe BP4/4). 100 : 1 Attenuator Castle Maypack Jig Maypack air sample adaptor NE PDR1 dose rate meter NE PDR2 dose rate meter DRCD 20 Maypacks (Centrally assembled) BNL C1 – 36 Check-source Maypack to give 1,000 cps (all sites and vehicles to have BNL sources giving the same count rate). 2 x Waterproof Nylon coveralls (06/06/09 – series) 10 prs PVC overshoes 100 prs Disposable gloves Large self-seal polythene bags 6 x pens 50 Forms 1 : 2500 Map showing Off-site Sampling Points/Sample Point Schedule and descriptions 1 Box Potassium Iodate tablets 1 Bottle Water 1 10 min Timer 1 Radio 1 Fire Extinguisher 1 First Aid Kit When supporting other sites the following additional equipment will be carried 1. Reception Centre kit as listed in EP/10/9/2 2. District Survey kit as listed in EP/8.2.6 edfenergy.com NOT PROTECTIVELY MARKED NOT PROTECTIVELY MARKED 16.6 BEG/SPEC/OPSV/EPG/002/016 Revision 003 Page 6 of 6 Access Control Point (Site Specific) 16.7 Incident Response Team (Site Specific) 16.8 Standby Emergency Response Team (Site Specific) 16.9 First Aid And Medical Decontamination Centres (Site Specific) 16.10 Gatehouse (Site Specific) 16.11 Breathing Apparatus (Site Specific) 16.12 FLASK/NAIR (Site Specific) 16.13 Miscellaneous (Site Specific) edfenergy.com NOT PROTECTIVELY MARKED