AIP Canada (ICAO) Supplements

Transcription

AIP Canada (ICAO) Supplements
28 APR 16
AIP CANADA (ICAO) SUPPLEMENT 16/16
CONSTRUCTION WORK
QUÉBEC / JEAN-LESAGE INTERNATIONAL AIRPORT (CYQB)
SUMMER 2016
Five (5) major projects from April to November 2016
Major construction work will be done on the airport airside at CYQB resulting in important changes in the use
of the runways, their access and movement on the taxiways and ramps.
April 11 to October 16 2016 – Construction of aircraft parking at the junction of
Ramp 2 and 3

Gates 19, 20, and 21 will be closed for the duration of the construction period;

Periodic closures of taxiway Charlie;

Temporary construction fence reducing visibility when circulating between Ramp 2 and 3;

Mix of vehicle and aircraft circulation.
June 6 to 18 2016 – Repair of the Intersection of runways 06-24 and 11-29

Work 24 hours a day;

Day : 4,600’ of runway, threshold 06 relocated East of the intersection (05:00–00:34);

Night : 4,300’ of runway, threshold 06 relocated East of the intersection (00:35–04:59);

Taxiways Charlie, Bravo, Golf, Hotel and a portion of Delta will be closed;

Northern field closed to helicopter training;

Mandatory slots required for non-commercial flights;

No touch-and-go will be allowed during this period;

Runway 06: unavailable CAT I precision approach;

Please note that the repair work will have the following impacts on flight procedures at CYQB:
1.
ILS RWY 06 APCH: ILS & LOC MINIMA NOT AUTH
(CIRCLING MINIMA
AUTHORISED)
2.
RNAV(GNSS) RWY 06 APCH: CST DESCENT ANGLE
INFO NOT USUABLE, LNAV/VNAV & LNAV MINIMA
NOT AUTH
VOR/DME RWY 06 APCH: CST DESCENT ANGLE
INFO NOT USUABLE, VOR/DME MINIMA NOT AUTH
(CIRCLING MINIMA
AUTHORISED)
NDB RWY 06 APCH: CST DESCENT ANGLE INFO NOT
USUABLE, NDB MINIMA NOT AUTH
(CIRCLING MINIMA
AUTHORISED)
3.
4.
Note: Cette information est aussi disponible dans l’autre langue officielle.
(CIRCLING MINIMA
AUTHORISED)
Page 1 of 3
28 APR 16
June 6 to July 13 2016 – Repair work to runway 11-29

Runway 11-29 will be closed;

Taxiways Charlie and Bravo will be closed.
August 8 to September 18 2016 – Widening of Ramp 2

Periodic closures of Ramp 2, aircraft circulation redirected by Charlie/11-29/Bravo;

Periodic closures of taxiways Charlie and Bravo;

Periodic closures of gates 23, 24 and 25.
For further information, contact
Aéroport de Québec Inc.
505, rue Principale
Québec QC G2G 0J4
Attention: Marie Josée Blondeau, Manager
Planning and Operational Systems
Tel.:
Fax:
418-640-2600 ext. 2674
418-640-2656
James Ferrier
Manager, Aeronautical Information Management
Page 2 of 3
AIP CANADA (ICAO) SUPPLEMENT 16/16
28 APR 16
AIP CANADA (ICAO) SUPPLEMENT 16/16
Page 3 of 3