broadway installation.cdr
Transcription
broadway installation.cdr
INSTALLATION PROCEDURE / PROCÉDURE D’INSTALLATION BROADWAY 1 6 2 7 3 8 4 9 KIT CONTENTS / CONTENU DE QUINCAILLERIE 10 5 1 - SUPPORT / SUPPORT (2pcs) 2 - NUT / ÉCROU (12pcs) 3 - SPIRAL / SPIRALE (4pcs) 4 - FEET SCREW / TIGE FILETEE (4pcs) 5 - FEET / PATTE (4pcs) 6 - FLOOR SCREW / VIS DU PLANCHER (10pcs) 7 - PIN/ DOUPILLE (10pcs) 8 - SMALL SCREW / PETIT VIS (16pcs) 9 - CLIP /AGRAFE (4PCS) 10 - FASTENER FOR SKIRT/ ATTACHE POUR LA JUPE (2pcs) Illustration 1. 2 1 3 STEP 1 / ÉTAPE 1 4 Install legs to the 2 supports of the bath (Illustration 1). Fixez les pattes aux 2 supports du bain tel qu ’indiqué (Illustration 1). 5 1 BROADWAY STEP 2 / ÉTAPE 2 8 27.6”(700mm) 23.6”(600mm) Fix legs to the bottom of the bath with small screws at a distance 27.6” in the front and 23.6”in the bac (photo A). Fixe des pattes du bain avec les petites visses a une distance 27.6” dans l’avant et 23.6”dans l’arrière (photo A). STEP 3 / ÉTAPE 3 PHOTO B 9 Skirt Jupe 8 Align the cover of the bathtub with the wooden blocks end fix clips(9) with small screws(8).(Photo B). Alingner le bain avec la jupe en suivant les blocs de . bois et fixez des agrafes avec les petites visses (8) (Photo B) Wood block Bloc du bois 2 BROADWAY STEP 4/ ÉTAPE 4 6 10 6 7 7 Fix to floor 4 legs Fix to floor 2 sides Fixez au plancher 4 pattes Fixez au plancher de 2 cotés 3