52A10NW0008 2.15791 TARTAN LAKE
2. 15? 9 l
REPORT OF WORK
1994
During the summer of 1994 a continuation of stripping
and washing away of overburden was carried out. Nore amethyst
veins were uncovered and sampled. Colour varied from clear
quartz to purple crystals, however, there was iron oxide on
the surface of many pieces making them difficult to clean.
Drilling and blasting of the showing revealled the
prescence of disseminated pyrite approximately 2* - 3* wide
bordering the amethyst occurrence. Assays revealed no gold
present.
Blasting to a depth of 5* - 6* indicated the amethyst
veins to be cleaner and crystals of better quality. Some
samples were taken to the Department of Mines in Thunder Bay
and interest was encouraging, so continued work is planned
for 1995.
Authour of report
W.(Bill) Richardson
Prospector
010
1994
STATEMENT OF COST
Water pump
Briggs and Stratton
Rental Fee
Hose:
5 Hp.
S39.007day
SlO.OO/day for each 25 m.
Total cost per day
Total 19 days
Gas and oil
Manual labour @ SISO.OO/day
Transportation:
(46 days)
S100.00
51900.00
S380.00
S6900.00
3/4 ton truck
80 KB return @ S0.307km
46 trips
51104.00
Total
S10284.00
•- y
59'
CA/R/A^
58'
5i
v* j-
-
^rwjdiV-is
\~? f
jo
"*I*3S
t/avb'
T
\
r
f^
l *
U j
S: ..l*, r
0
;
1
. i::,:,;:,A :::Jv.v,
-ji Or (r- —— •::::..::::::rl :.-|::.Vi;
..... ........J ;. ,.j
^
^Ti.i;:\?..:.^
•fcr
•v"
:lh; :-H v : :
j^Jfe flp.-Jp^\L.vJl
D.T
V- .l:i.Ol.J.!:i:
f- - --^. --li
o
o
l
Y
-
.....
-*-!-:i
l
j :
:
'::: - :r
J:r :
r -- ..:—r:.!:.; .. :.; ::::;:-..l ::
i':: 1 "!':'
I^F-
[L^-J-U;,;
r ".i.
0
o \ . .
,.fV:
-
tH:
.. .
\ .
•**o5-fc
^'Jj ^k ^
k-
li
t,
3 l vvt OWOj/Si'
'"S
Jl:
\
RECEIVED
REPORT OF WORK BY
D. ARSENAU^T
MAR l 7 1995
MINING LANDS BRANCH
Work on claim
*
1183530
In the fall of 1993 aa amethyst showing was discovered
on what is now claim * 1183530. During the summer of 1994
manual stripping and washing was carried out. The amethyst
occurrence was on the face of a granite ledge approximately
4'-5* high and 20' in length. The crystals ranged in size
from 1/4" to 1.4" across and varied in colour from white to
deep purple. The deep coloured crystals were beyond reach
at the bottom of the ledge. Removal of overburden at the
bottom of the ledge will have to be done to extr.ict any
amethyst. Overburden on top of the ledge was removed to
locate any parallel veins. Mowever the heavy layer of sand
and the presence of numerous tree stumps made it difficult to
do this by manual labour. It was decided to wait until the
summer of 1995 and bring in mechanical equipment to further
explore this showing. The amethyst vein was traced to the
northeast along a ravine for approximately 200 metres.
Crystals ranged from 1/4" to 3/4" and were deep purple in
colour. These showings were also on the face of ledges. These
ledges will require extensive removal of overburden to
determine the width of the vein or veins. The loose boulders
that are believed to have fallen off the face of these ledges
contain massive amethyst crystals. Work in 1995 will
hopefully determine the .narket quality of the this showing.
Drilling and blasting was done on the showing and will
be documented on an application for submission for assessment
work credit for W. Richardson at a later date.
v
^
*.
*5
iJ
Nx
^
^
Uj
?
s.1
'K
•\"
t "'"
*)
Report of Work Conducted
After Recording Claim f
Ministry at
Northern Dovoloprnont
and Mines
Ontario
MlnJnQ Act
Parmal Information cotected on this form is obtained under the authority of the M
lA — — **-i nil n H *im* JH ItA Jtf^*f^^*t b* MtA DMM^NM^M! ftA^MAJ^^V
••kJ^M
ftdk*
n common snowo oe oireciea n nw riuniKWi Manager. KUff^bM*
Miimig lLOTOS,
MWI
Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.
Instructions: - Ptease type or print and submit in duplicate.
- Refer to the Mining Act and Regulations for req^
Recorder.
- A separate copy of this form must be completed for each Work Group.
- Technical reports and maps must accompany this form in duplicate.
- A sketch, showing the claims the work is assigned to, must accompany this form.
ded HoUer(s)
G,
O.
CtartNo.
AtCHAR^
r_^^_^___
fi. HIT 13
MMnp DlvWofi
Tetophone No.
p***?
MorQPtanNo.
raNpMrM
g/iy
900
From:
To:
J ,9T
Work Performed (Check One Work Group Only)
WorkGroup
Type
Geotechnical Survey
Physical Work.
Including DriOing
W/Xti/Y
Rehabilitation
OD MN Authonzsd
Work
Assays
Assignment from
Reserve
Total Assessment Work Claimed on the Attached Statement of Costs
Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)
Address
Name
[attach a schedule M necessary)
Dei lineation of Donoflclal Interest * See Note No. 1 on reverse side
Recorded Holder or Agent (Signature)
Dole
l certify that at the Mm* the work was performed, the claims covered in this work
report were recorded in Ae current holder's name or held under a beneficial Interest
by ttw current rooonM
Certification of Work Report
l certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after
its completion and annexed report is true.
Name and Address of Parson Ceftifyhig
per
6. /?l
Tetopont) No.
Date
Certified By (Signature)
977
For Office Use Only
Total Value Gr. Recorded
x
Dflto Recofdod
Mining Recorder
on -j iu
\
"w
,/^-C. \JLJ6Ju^-o^ m
jo, zzy
OZ41 (DM1)
Doomod Approval Date
/V**. Cr/fS
Date Notice for Amendments Sam
Date Approved
o
mn i c
" RWMwd Stamp' " J
j
ISIAI-J dlilNIW
V8 y^GNOHi
QBM'DT'J
"
i
OJ
^
*-
O
rsi
0
M
oo
VslTotua*l
Work
Don*
thiaism Don*
Clon
Work As es ment
Valofu*
00
-4-
4
\^1
-
|.,
ijflf
fi
-
P
O
-o
V
DO
-c:
OQ
Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from
which claims you wish to priorize the deletion of credits. Please mark (**) one of the following:
1.
D Credits are to be cut back starting with the claim listed last, working backwards.
2.
3.
D Credits are to be cut back equally over all claims contained in this report of work.
D Credits are to be cut back as priorized on the attached appendix.
In the event that you have not specified your choice of priority, option one will be implemented.
Note 1: Examples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect
to the mining claims.
Note 2: If work has been performed on patented or leased land, please complete the following:
l certify that the recorded holder had a beneficial interest in the patented
or leased land at the time the work was performed.
Signature
Date
Ministry ol
Ontario
Northern Development
and Mines
Statement of Costs
for Assessment Credit
Ministere du
Developpement du Nord
et des mines
ftat des coots aux fins
du credit devaluation
Transaction NoJN* de transaction
Mining Act/Loi sur les mines
Personal information collected on this form is obtained under the authority
of the Mining Act. This information wH be used to maintain a record and
ongoing status of the mining daim(s). Questions about this collection should
be directed to the Provincial Manager. Minings Lands. Ministry of Northern
Development and Mines. 4th Floor. 159 Cedar Street. Sudbury. Ontario
P3E 6A5. telephone (70S) 670-7264.
Les ranseignements personnels contends dans la present* formula sent
recueilis en vertu de la Lot sur les mines ei serviront ft tenir a jour un regjstre
des concessions minieres. Adresser toute question sur la collece de ces
renseignements au chef provincial des terrains miniers. ministere du
Devetoppement du Nord el des Mhws. 159. rue Cedar. 40 etage. Sudbury
(Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/Coats directs
2. Indirect Costs/Couts indirects
Type
Amount
Montan!
Description
Labour / fo/Ja^
Main-d'oeuvre 3^4^
Field Supervision
Supervision sur le terrain
Wages
Contractor's
Totals
Total global
y 3o v- WDO-
* * Note: When claiming RehabOnation work Indirect costs are not
allowable as assessment work.
Pour le remboursement des travaux de rehabilitation, les
coOts indirects ne sont pas adrnissMes en tant que travaux
d'evaluation.
Type
Type
Transportation
Transport
3cff /-**i
&C- k *~
Fees
Drafts de
['entrepreneur
et de I'expert-
Amount
Montant
Description
Type
/^P 3fk* V '-***
Totals
Total global
;
76?.?. ~~7m-Z
3 J /f?*
Typ* fJLt./eict^
SuppHea Used
Foumfturea
(5*5 t o, c
ufltooes -rf
300^-
3*0.1*
W^
Equipment
Rental
Location de
nwwftol
Type ^ f tfa^ )
UWTFZ fun P
/foo^. 'j f00. l
Food and
Lodging
Noufriture et
hebergement
Mobilization and
Demobilization
MoMllsaaon et
demoblHsation
Sub Total of Indirect Costs
Total partJel des couts indirects
i
-
Total Direct Coste
Total des couts directs
fooo-t
The recorded holder win be required to verify expendrtures claimed in
this statement of costs within 30 days of a request for verification. If
verification is not made, the Minister may reject for assessment work
all or part of the assessment work submitted.
76,8-2
Amount Allowable (not greater than 20H of Direct Costs)
Hontant admhislbie (n'excedant pas 20 M des coots directs)
Total Value of Asaessment Credit
[Total of Direct and AMowable
tadrad cMtet
Vateur Male du credrt
o evswsllon
fTaM dH caen dtaeto
73L3-
der. ideas dans
Note: Letrtutoireenregistre sera tenu de verifier IBS dap
le present etat des couts dans les 30 jours survant une demande a cet
effet. Si la verification n'est pas effectuea. to rninistre paul rejeter tout
ou une partie des travaux d'evaluation presentes.
RRng Discounts
Remises pour depot
1. Work filed within two years of completion is claimed at 10046 of
the above Total Value of Assessment Credit.
1. Les travaux deposes dans les deux ans suivant tour achevement sont
rembourses ft 100 9b de la vateur Mate susmentionnee du cri* d'evaluation.
2. Work filed three, four or five years after completion is claimed at
5G"Vb ot the above Total Value of Assessment Credit. See
calculations below:
2. Les travaux deposes trois. quatre ou cinq ans apres leur achevercent
sont rembourses a 50 "H* de la vateur totals du credit d'evaluation
susmenfonne. Voir les calculs ti-dessous.
Total Value ot Assessment Credit
Total Assessment Claimed
Vateur totale du credit d'evaluation
Evaluation totale demandee
x 0.50
x 0.50
Certification Verifying Statement of Costs
Attestation de I'etat des couts
hereby certify:
that the amounts shown are as accurate as possible and these costs
were incurred white conducting assessment work on the lands shown
on the accompanying Report of Work form.
J'atteste par la presente :
que les montants indiques sont to plus exact possible et que ces
depenses ont ete engagees pour effectuer les travaux d'evaluation
sur les terrains indiques dans la formute de rapport de travail ct-joint.
l am authorized
Et qu'a litre de __________________ je suis autorise
that as
(Recorded HoUer. Agent. Position in Company)
to make this certification
(titutaire emeflislrt. representant, post* occup* dans la cornpagnie)
a faire cotte attestation.
Nota : Dans cene formule. lorsqu'il designe des personnes. le masculin est utilise au sens neutre.
Ontario
Ministry of
Northern Development
and Mines
Ministeredu
Devetoppement du Nord
et des Mines
Geoscience Approvals Office
933 Ramsey Lake Road
6th Floor
Sudbury, Ontario
P3E 6B5
Our File: 2.15791
Transaction #: W9440.00324
March 23, 1995
Telephone:
(705) 670-5853
Fax:
(705) 670-5863
Mining Recorder
Ministry of Northern Development t Mines
435 James Street South
Suite B003
Thunder Bay, Ontario
P7E 6E3
Dear Sir/Madam:
Subject: APPROVAL Or ASSESSMENT WORK CREDITS OH MIHIHG CLAIMS
TB.1183530 BT AL IB TARTAN LAKE AREA
The deficiencies in the original submission have for the most part
been rectified.
Assessment work credits have been approved as outlined on the report
of work form for the submission. The credits have been approved
under Section 10, Physical Work, Mining Act Regulations.
It is noted that the
provided as required
Please keep a record
future Physical Work
hours and dates of the field work were not
by subsection 10(2) (a) of the Regulations.
of this type of information and include it in
submissions.
The approval date is March 20, 1995. Please indicate this approval
on the claim record sheets.
...12
-2March 23, 1995
Mining Recorder - Thunder Bay
If you have any questions regarding this correspondence, please
contact Bruce Gates at (70S) 670-5856.
Yours sincerely.
Ron C. Gashinski
Senior Manager, Mining Lands Section
Mining and Land Management Branch
Mines and Minerals Division
BIG/jl
Enclosure:
cc:
Resident Geologist
Thunder Bay, Ontario
L/Asse
sessment Files Library
Sudbury, Ontario
N
*1^**^
NOTICE:
The Information that appears on this map hat been compiled
from various sources, and accuracy Is not guaranteed. Those
wishing to stake mlnma claims should consult with the Mining
Recorder, Ministry of Northern Development and Mines, for
additional Information on the status of the lands shown hereon.
DORIONSTWP
LEGEND
PATENTED
LAND
CROWN LAND SALE
LEASES
LOCATED LAND
LICENSE OF OCCUPATION
MINING RIGHTS ONLY
SURFACE RIGHTS ONLY
ROADS
IMPROVED ROADS
KING'S
HIGHWAYS
RAILWAYS
POWER LINES
MARSH OR MUSKEG
- MINES
CANCELLED
C.
LAND USE PEWITS FOR COMMERCIAL TOURISM. OUTPOST CAMPS
REFERENCES
AREAS WITHDRAWN FROM DISPOSITION
M.R.O. - MINING RIGHTS ONLY
S.R.O. -SURFACE RIGHTS ONLY
MCTlAVISH TWP
FOR
STATU/3 REFER TO TWP PLAN
M.+ S. - MINING AND SURFACE RIGHTS
DMcnption
Order No.
Dit*
Dhpoiltlon
F H*
G-675
\ II83S36 l \ 1183595
1198737 i
L—- J
— ———— ~~
_
i_JS,..___—1-^fre
\TTB
L/^—V
SCALE: 1 INCH = 40 CHAINS
O
1OOO
4OOO
2OOO
8000
' 2000
1000
O
200
METRES
6OOO
11 KM)
(2 K M)
nasr7 i"94847 i
TARTAN LAKE
M. N. R. ADMINISTRATIVE DISTRICT
THUNDER
BAY
MINING DIVISION
/Vi 166702)———l
THUNDER
l— JCLr^^--
BAY
LAND TITLES/ REGISTRY DIVISION
THUNDER
BAY
Ministry of
Natural
Resources
Date
MACGREGOR
52A1ONWOOOB 2 167o7 TARTAfTuAKE
200
JULY,
1991
In Service July 23/93.
Ministry of
Northern Development
and Mines
G-2706

Documents pareils

SUMMARY RPT ON DDH H1-95 HOUSTON LAKE PROPERTY

SUMMARY RPT ON DDH H1-95 HOUSTON LAKE PROPERTY Total Assessment Work Claimed on the Attached Statement of Costs Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded holder cannot ...

Plus en détail