February 12, 2010 Advice Letter 2422

Transcription

February 12, 2010 Advice Letter 2422
ARNOLD SCHWARZENEGGER, Governor
STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
SAN FRANCISCO, CA 94102-3298
February 12, 2010
Advice Letter 2422-E
Akbar Jazayeri
Vice President, Regulatory Operations
Southern California Edison Company
P O Box 800
Rosemead, CA 91770
Subject: Modification of Schedule EDR-R, Economic Development
Rate-Retention
Dear Mr. Jazayeri:
Advice Letter 2422-E is effective January 8, 2010.
Sincerely,
Julie A. Fitch, Director
Energy Division
Akbar Jazayeri
Vice President of Regulatory Operations
January 8, 2010
ADVICE 2422-E
(U 338-E)
PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
ENERGY DIVISION
Modification of Schedule EDR-R, Economic Development
Rate-Retention
SUBJECT:
Modifications to Southern California Edison Company’s (SCE’s) Schedule EDR-R,
Economic Development Rate-Retention are listed on Attachment A and are attached
hereto.
PURPOSE
The purpose of this advice filing is to extend the sunset date of SCE’s Schedule EDR-R
to the date the California Public Utilities Commission (Commission) issues a final
decision in Application No. (A.) 09-10-012.
BACKGROUND
On October 13, 2009, SCE filed A.09-10-012 seeking authority to extend the sunset
date of its Schedule EDR-R. Ordering Paragraph 2 of Decision 05-09-018 required
SCE to sunset its Schedule EDR-R on December 31, 2009. On December 21, 2009, in
a letter to the Commission’s Executive Director SCE requested extension of Schedule
EDR-R’s sunset date until the Commission issues a final decision in A.09-10-012. On
December 23, 2009, the Commission’s Executive Director found SCE’s request
reasonable and granted SCE’s request. Therefore, in this advice filing SCE is providing
the necessary modifications to Schedule EDR-R to extend the sunset date of this
schedule.
No cost information is required for this advice filing.
This advice filing will not increase any rate or charge, cause the withdrawal of service,
or conflict with any other schedule or rule.
P.O. Box 800
2244 Walnut Grove Ave.
Rosemead, California 91770
(626) 302-3630
Fax (626) 302-4829
ADVICE 2422-E
(U 338-E)
-2-
January 8, 2010
TIER DESIGNATION
Pursuant to General Order (GO) 96-B, Energy Industry Rule 5.1, this advice letter is
submitted with a Tier 1 designation.
EFFECTIVE DATE
This advice filing will become effective on January 8, 2010, the same day as filed.
NOTICE
Anyone wishing to protest this advice filing may do so by letter via U.S. Mail, facsimile,
or electronically, any of which must be received no later than 20 days after the date of
this advice filing. Protests should be mailed to:
CPUC, Energy Division
Attention: Tariff Unit
505 Van Ness Avenue
San Francisco, California 94102
E-mail: [email protected] and [email protected]
Copies should also be mailed to the attention of the Director, Energy Division,
Room 4004 (same address above).
In addition, protests and all other correspondence regarding this advice letter should
also be sent by letter and transmitted via facsimile or electronically to the attention of:
Akbar Jazayeri
Vice President of Regulatory Operations
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, California 91770
Facsimile: (626) 302-4829
E-mail: [email protected]
ADVICE 2422-E
(U 338-E)
-3-
January 8, 2010
Bruce Foster
Senior Vice President, Regulatory Affairs
c/o Karyn Gansecki
Southern California Edison Company
601 Van Ness Avenue, Suite 2040
San Francisco, California 94102
Facsimile: (415) 929-5540
E-mail: [email protected]
There are no restrictions on who may file a protest, but the protest shall set forth
specifically the grounds upon which it is based and shall be submitted expeditiously.
In accordance with Section 4 of GO 96-B, SCE is serving copies of this advice filing to
the interested parties shown on the attached GO 96-B, A.04-04-008, and A.09-10-012
service lists. Address change requests to the GO 96-B service list should be directed
by electronic mail to [email protected] or at (626) 302-4039. For changes
to all other service lists, please contact the Commission’s Process Office at (415)
703-2021 or by electronic mail at [email protected].
Further, in accordance with Public Utilities Code Section 491, notice to the public is
hereby given by filing and keeping the advice filing at SCE’s corporate headquarters.
To view other SCE advice letters filed with the Commission, log on to SCE’s web site at
http://www.sce.com/AboutSCE/Regulatory/adviceletters.
For questions, please contact Darrah Morgan at (626) 302-2086 or by electronic mail at
[email protected].
Southern California Edison Company
Akbar Jazayeri
AJ:dm:jm
Enclosures
CALIFORNIA PUBLIC UTILITIES COMMISSION
ADVICE LETTER FILING SUMMARY
ENERGY UTILITY
MUST BE COMPLETED BY UTILITY (Attach additional pages as needed)
Company name/CPUC Utility No.: Southern California Edison Company (U 338-E)
Utility type:
Contact Person: James Yee
; ELC
… GAS
Phone #: (626) 302-2509
… PLC
… HEAT
… WATER
E-mail: [email protected]
E-mail Disposition Notice to: [email protected]
EXPLANATION OF UTILITY TYPE
ELC = Electric
PLC = Pipeline
GAS = Gas
HEAT = Heat
Advice Letter (AL) #:
Subject of AL:
(Date Filed/ Received Stamp by CPUC)
WATER = Water
2422-E
Tier Designation:
1
Modification of Schedule EDR-R, Economic Development Rate-Retention
Keywords (choose from CPUC listing):
AL filing type: … Monthly … Quarterly … Annual ; One-Time … Other
If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution #:
Does AL replace a withdrawn or rejected AL? If so, identify the prior AL:
Summarize differences between the AL and the prior withdrawn or rejected AL1:
Confidential treatment requested? … Yes ; No
If yes, specification of confidential information:
Confidential information will be made available to appropriate parties who execute a nondisclosure agreement.
Name and contact information to request nondisclosure agreement/access to confidential information:
Resolution Required? … Yes ; No
Requested effective date:
1/08/10
No. of tariff sheets:
-3-
Estimated system annual revenue effect: (%):
Estimated system average rate effect (%):
When rates are affected by AL, include attachment in AL showing average rate effects on customer classes
(residential, small commercial, large C/I, agricultural, lighting).
Tariff schedules affected:
Schedule EDR-R and Table of Contents
Service affected and changes proposed1:
Pending advice letters that revise the same tariff sheets:
1
Discuss in AL if more space is needed.
None
Protests and all other correspondence regarding this AL are due no later than 20 days after the date of
this filing, unless otherwise authorized by the Commission, and shall be sent to:
CPUC, Energy Division
Attention: Tariff Unit
505 Van Ness Ave.,
San Francisco, CA 94102
[email protected] and [email protected]
Akbar Jazayeri
Vice President of Regulatory Operations
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, California 91770
Facsimile: (626) 302-4829
E-mail: [email protected]
Bruce Foster
Senior Vice President, Regulatory Affairs
c/o Karyn Gansecki
Southern California Edison Company
601 Van Ness Avenue, Suite 2040
San Francisco, California 94102
Facsimile: (415) 673-1116
E-mail: [email protected]
Public Utilities Commission
2422-E
Cal. P.U.C.
Sheet No.
Title of Sheet
Attachment A
Cancelling Cal.
P.U.C. Sheet No.
Revised 46361-E
Schedule EDR-R
Original 39113-E
Revised 46362-E
Revised 46363-E
Table of Contents
Table of Contents
Revised 46332-E
Revised 46334-E
1
Southern California Edison
Rosemead, California
(U 338-E)
Cancelling
Revised
Original
Cal. PUC Sheet No.
Cal. PUC Sheet No.
Schedule EDR-R
ECONOMIC DEVELOPMENT RATE-RETENTION
46361-E
39113-E
Sheet 1
APPLICABILITY
Applicable to existing customers with demands of at least 200 kW. The customer must demonstrate to
the satisfaction of SCE that relocation of its entire operations or a qualified portion of their operations
which consists of load of at least 200 kW, to a site outside of California is a viable alternative or that
closure of the customer’s existing facilities is otherwise eminent. Additionally, the customer must sign
an affidavit attesting to the fact that “but for” this discount, either on its own or in combination with a
package of incentives made available to the customer from other sources, the customer would not have
retained load within the State of California. This Schedule is not applicable to state and local
government customers or residential customers. This Schedule will remain open to new participants
until the California Public Utilities Commission issues a final decision in Application 09-10-012. The total
accumulated contract demand on Schedules EDR-R, EDR-E, and EDR-A, at any point in time for active
agreements, shall not exceed 100 MW (megawatts).
(T)
(T)
Customers must be served under General Service rate Schedule.
Customers subject to the Environmental Pricing Credit agreement may not take service under this
Schedule.
Customers served under this Schedule are not eligible for service under Schedule EDR-A or Schedule
EDR-E.
TERRITORY
Within the entire territory served.
RATES
Unless provided herein, or in the Economic Development Rate-Retention Agreement, all charges and
provisions of the customer’s Otherwise Applicable Tariff (OAT) shall apply, except that the customer’s
total bill shall be subject to discount as follows:
Year 1
Year 2
Year 3
Year 4
Year 5
25%
20%
15%
10%
5%
(Continued)
(To be inserted by utility)
Advice
2422-E
Decision
1H11
Issued by
Akbar Jazayeri
Vice President
(To be inserted by Cal. PUC)
Date Filed Jan 8, 2010
Effective
Jan 8, 2010
Resolution
Southern California Edison
Rosemead, California
(U 338-E)
Cancelling
Revised
Revised
TABLE OF CONTENTS
Cal. PUC Sheet No.
Cal. PUC Sheet No.
46362-E
46332-E
Sheet 1
-Cal. P.U.C.
Sheet No.
TITLE PAGE ..................................................................................................................................11431-E
TABLE OF CONTENTS - RATE SCHEDULES ..... 46362-46004-46333-46363-46335-46336-46337-E
TABLE OF CONTENTS - LIST OF CONTRACTS AND DEVIATIONS ......................................46337-E
TABLE OF CONTENTS - RULES ................................................................................................45887-E
TABLE OF CONTENTS - BASELINE REGIONS ........................................................................45888-E
TABLE OF CONTENTS - SAMPLE FORMS .....................45237-45889-45890-45891-45892-45240-E
.......................................................................................................................................43047-E
PRELIMINARY STATEMENT:
A. Territory Served ...............................................................................................................22909-E
B. Description of Service ......................................................................................................22909-E
C. Procedure to Obtain Service ...........................................................................................22909-E
D. Establishment of Credit and Deposits .............................................................................22909-E
E. General............................................................................... 45178-45179-45180-45181-45182-E
F. Symbols ............................................................................................................................37168-E
G. Gross Revenue Sharing Mechanism ......... 26584-26585-26586-26587-27195-27196-27197-E
........................................................................................................27198-27199-27200-27201-E
H. Baseline Service ............................................................... 45183-45598-11880-11881-31679-E
I. Advanced Metering Infrastructure Balancing Account ........................................ 42811-42812-E
J. Palo Verde Balancing Account................................................................. 44942-44943-44944-E
K. Nuclear Decommissioning Adjustment Mechanism ............................................ 36582-36583-E
L. Purchase Agreement Administrative Costs Balancing Account.......................... 44041-44042-E
M. Income Tax Component of Contributions ........................................................... 46229-27632-E
N. Memorandum Accounts....... 21344-45184-45905-42035-42036-41775-44428-44429-44947-E
........... 42840-42841-42842-44948-44949-44950-44951-44952-44953-42849-42850-42851-E
........... 41717-42853-44297-42855-42856-44341-44954-44955-42860-42861-42862-42863-E
........... 42864-42921-42922-44956-44957-45185-42870-42871-42872-42873-42874-42875-E
........... 42876-42877-42878-42879-42880-42881-42882-42883-44958-42885-44959-42887-E
42888-44960-43367-42891-42892-39861-43806-43889-43890-43891-43892-44029-44133-E
……………………………………………………………………………………………..-45906-45097-E
O. California Alternate Rates for Energy (CARE) Adjustment Clause
............................................................................................ 34705-41902-36472-38847-46257-E
P. Optional Pricing Adjustment Clause (OPAC).................... 27670-27671-27672-27673-27674-E
(T)
(Continued)
(To be inserted by utility)
Advice
2422-E
Decision
1H8
Issued by
Akbar Jazayeri
Vice President
(To be inserted by Cal. PUC)
Date Filed Jan 8, 2010
Effective
Jan 8, 2010
Resolution
Southern California Edison
Rosemead, California
(U 338-E)
Cancelling
Revised
Revised
TABLE OF CONTENTS
Cal. PUC Sheet No.
Cal. PUC Sheet No.
46363-E
46334-E
Sheet 4
(Continued)
RATES SCHEDULES
Schedule
No.
Title of Sheet
Cal. P.U.C.
No.
GENERAL SERVICE/INDUSTRIAL
EDR-A
EDR-E
EDR-R
GS-1
GS-2
GS-APS
GS-APS-E
RTP-2
TOU-BIP
TOU-EV-3
TOU-EV-4
TOU-GS-1
Economic Development Rate-Attraction ....................................... 39107-43013-39109-E
Economic Development Rate-Expansion ..................................... 39110-43014-39112-E
Economic Development Rate-Retention ...................................... 46361-43015-39115-E
General Service - Non Demand ..................46269-43070-46270-42463-39882-38329-E
..................................................................................................................... 38330-38331-E
General Service - Demand . 45654-46271-46272-46273--45658-45659-46274-45661-E
.......................................................................45662-45663-45664-45665-45666--45667E
General Service - Automatic Powershift ........................................ 45668-44824-45669-E
General Service - Automatic Powershift – Enhanced ................... 45670-44825-45671-E
General Service - Large, Real Time Pricing ........... 46275-45673-45674-45675-45676-E
........................................................... 45677-45678-45679-45680-45681-45682-45683-E
Time-Of-Use-General Service Base Interruptible Program45685-43401-41834-45686-E
.......................................................... 45687-44623-44413-44205-45689-43618-44624-E
General Service Time-Of-Use Electric Vehicle Charging ............. 46276-43078-42468-E
General Service - Time-Of-Use Electric Vehicle Charging Demand Metered
................................................................................. 46277-43079-39904-38417-42470-E
General Service - Non Demand..................46278-43080-46279-42471-38687-38424-E
.................................................................................................................... 38425-38426-E
(T)
(Continued)
(To be inserted by utility)
Advice
2422-E
Decision
4H9
Issued by
Akbar Jazayeri
Vice President
(To be inserted by Cal. PUC)
Date Filed Jan 8, 2010
Effective
Jan 8, 2010
Resolution