FACT SHEET – Gloucester City Centre – A Single Free Standing

Transcription

FACT SHEET – Gloucester City Centre – A Single Free Standing
FACT SHEET – Gloucester City Centre – A Single Free Standing
Building, Ottawa, Ontario
LEED Canada Core and Shell (CS) 2009 Certification
This single free standing building, which forms part of Gloucester City Centre, a
shopping centre development, is occupied by the Liquor Control Board of Ontario
(LCBO) and located at the intersection of Blair Road and Ogilvie Road in Ottawa,
Ontario. It is owned and was developed by First Capital Realty Inc. (FCR) and obtained
LEED Canada Core and Shell (CS) 2009 Certification in 2015.
In keeping with FCR’s ongoing commitment to sustainable design and construction, this
single free standing building located at Gloucester City Centre, was constructed to LEED
Canada CS 2009. The LEED Canada CS 2009 Certification comprises the base building
design and construction of one building with 1,083 m² or 11,657 ft² in total. FCR did not
construct or fit out the interior finishes or leaseholds of the tenant premises; and as a
result, they were not included in this LEED Canada CS 2009 Certification. However, a
mandatory agreement specifies that the tenant design and complete the interior of their
leased premises in accordance with LEED requirements.
Project # 15011
Page | 1
AUGUST 2015
SUSTAINABLE SITES
o
o
o
Building is located near existing
infrastructure thereby channeling
development to existing urban areas while
protecting green fields, habitat, and natural
resources.
Has access to public transit.
Reduced heat island effect through the
installation of highly reflective roof coating.
WATER EFFICIENCY
o
Reduced water consumption by 36% by
installing low flow plumbing fixtures.
MATERIALS & RESOURCES
o
o
o
INDOOR ENVRIONMENTAL QUALITY
o
o
ENERGY & ATMOSPHERE
o
o
o
Optimized energy performance. 28%
estimated projected savings in annual
energy costs.
Developed and implemented a measurement
and verification plan of the base building
thereby providing ongoing accountability of
building energy consumption over time.
Secured a two-year contract to supply 70%
of the building’s power needs from
renewable sources.
Project # 15011
Page | 2
Diverted 78% of construction waste from
landfill.
13% of the total content of building
materials, by value, was manufactured using
recycled materials.
100% of wood-based building materials was
harvested from Forest Stewardship Council
(FSC) certified forests.
o
Prevented indoor air quality problems
through the use of a Construction Indoor Air
Quality (IAQ) Management Plan.
Used adhesives, sealants, paints, and
coatings having low volatile organic
compound (VOC) content to minimize off
gassing.
Designed a building to avoid crosscontamination of pollutants to maintain air
quality and the comfort of building
occupants.
AUGUST 2015
CITY PARK DRIVE
.
R
M AS
G
98,452 SF
R
BE N
AR
C
HIO
ILS
NA
41
.F.
CHEEZY
PIZZA
84
1,9
RIGHT
STITCH
L
E
V
A
R
T
1,420 SF
SA
®
TOKYO
EXP.
DENTAL
STORAGE
E
C
U
T
O
H
IT
E-
IZ
M
1,200 SF
L
A
TO
US
4S
F D
O N S
Y A E
R Y IC
T IT V
IS N R
IN MU SE
M M L
O IA
C OC
S
IC
T
P
O
1,333 SF
KIWI K.
S
Y'
LL
BI
L
A
IC N
P E
O H
R TC
I
K
1,195 S.F.
T
S
FA
MONGOLIAN
VILLAGE
C
.
S.F
125,000 S.F.
LAW
FIRM
U
T
N
E
C
CHIROPRACTOR
.
.F
S
B
2,400 SF.
RIB
CA
IO Y
IT N
R A WN R
T P
U M YTO WDE
N O
B O
H
C
6
lk
buarn
b
AN
BE
.
.F
S
59
BENTLEY
PO
EX
2
42
1,
RE
SU
ACADEMY
OF BEAUTY
2,254 S.F.
COMING
OTTAWA SOON
OGILVIE ROAD
OTTAWA
ACADEMY
OF5,400SF
BEAUTY
4,300 S.F.
Y
R
21
BYTOWN
CHOWDER
SILL
BILL Y
Y'S
FOOD COURT
TOKYO
EXP.
Y
Z
E
E ZA
H
C PIZ
TROPICAL
KITCHEN
CAISSE
POPULAIRE
D
OA
IR R
BLA
N U T R IT IO N
C O M PA N Y
1,800 S.F.
BARBER
1,609 S.F.
CARIBBEAN EXPOSURE
FCR MANAGEMENT
414 S.F.
FASHIONAILS
THE SOLE PURPOSE OF THIS SITE PLAN IS TO IDENTIFY THE APPROXIMATE LOCATION OF THE BUILDINGS PRESENTLY CONTEMPLATED BY THE OWNER/LANDLORD. THE DEPICTION OF BUILDING SIZES AND APPEARANCES,
SITE DIMENSIONS, ACCESS AND PARKING AREAS, EXISTING TENANT LOCATIONS AND IDENTITIES DO NOT CONSTITUTE A REPRESENTATION, WARRANTY OR COVENANT OF ANY KIND WHATSOEVER BY OWNER/LANDLORD,
AND ARE SUBJECT TO CHANGE AT ANY TIME AT THE SOLE DISCRETION OF THE OWNER/LANDLORD.
LE SEUL BUT DU PLAN DE SITUATION EST DE PRÉSENTER L’EMPLACEMENT APPROXIMATIF DES IMMEUBLES ACTUELLEMENT PRÉVUS PAR LE PROPRIÉTAIRE/LOCATEUR. LES DIMENSIONS ET L’APPARENCE DES IMMEUBLES,
LES DIMENSIONS DU SITE, LES ACCÈS ET LES AIRES DE STATIONNEMENT AINSI QUE L’EMPLACEMENT ET L’IDENTITÉ DES LOCATAIRES EXISTANTS QUI Y SONT PRÉSENTÉS NE CONSTITUENT NULLEMENT UNE DÉCLARATION,
UNE GARANTIE OU UN ENGAGEMENT DE QUELQUE SORTE QUE CE SOIT DE LA PART DU PROPRIÉTAIRE/LOCATEUR, ET PEUVENT ÊTRE MODIFIÉS À TOUT MOMENT À LA SEULE APPRÉCIATION DU PROPRIÉTAIRE/LOCATEUR.
For Leasing Enquiries Contact/Pour renseignments :
Bruce Barrett
Director Leasing /Directeur Location
Eastern Canada / Est du Canada
T: (613) 742-3772 F: (613) 748-3602
T.F/S.F: 1-877-332-0031
Email: [email protected]
GLOUCESTER CITY CENTRE
OTTAWA, ONTARIO
REVISED JULY 7, 2015
15011

Documents pareils

FACT SHEET – Loblaws Plaza – A Single Free Standing Building

FACT SHEET – Loblaws Plaza – A Single Free Standing Building materials, by value, was manufactured using recycled materials. 20% of materials, based on the total value of the project, was extracted and sourced locally. 57% of wood-based building materials wa...

Plus en détail

FACT SHEET - First Capital Realty

FACT SHEET - First Capital Realty Reduced demand of potable water and wastewater generation by 50%. Reduced water consumption by 56% by installing low flow plumbing fixtures.

Plus en détail