SS-51SL-CAT - Longevity Acrylics Inc
Transcription
SS-51SL-CAT - Longevity Acrylics Inc
L004 SS-51SL-CAT INSTRUCTION MANUAL │ GUIDE D’INSTALLATION 02/2016 SLIDING SHOWER DOOR │ PORTE DE DOUCHE COULISSANTE 6861 Richmond Road, Summerstown, Ontario K0C 2E0 │ Tel: 613-931-1615 │www.longevityacrylics.com Please keep this manual and product code number for future reference and for ordering replacement parts if necessary. Veuillez conserver ce manuel et le code de produit pour des références futures, et au besoin, la commande de pièces de rechange. GENERAL INSTRUCTIONS • Read this manual carefully and completely En INSTRUCTIONS GÉNÉRALES • before proceeding. • It is recommended that you wear safety • Caulking: no sealant is required inside the shower, unless otherwise stated. • Some models are equipped with clear sealing gaskets. CARE FOR YOUR SHOWER DOOR • Never use scouring powder pads or sharp • NOTE • • Certains modèles sont dotés de joints d’étanchéité clairs. L’ENTRETIEN DE VOTRE DOUCHE • Ne jamais utiliser de poudre ou de tampon à récurer, ni d’instrument tranchant sur les parties en métal ou en verre. De temps à autre, il suffit de nettoyer la porte avec une solution d’eau et un détergent doux pour conserver l’aspect soap diluted in water is all that is needed neuf des panneaux de verre et du cadre en aluminium. to keep the panels and aluminum parts We recommend wiping the glass panels Calfeutrage: aucun scellant n’est nécessaire à l’intérieur de la douche. els. An occasional wiping down with a mild • Il est recommandé de porter des lunettes de sécurité en tout temps lors de l’installation. instruments on metal pieces or glass pan- looking new. Fr d’installation avant de procéder. glasses at all times during the installation. NOTICE Lire attentivement et complètement le manuel • Nous recommandons de passer une raclette de douche sur les panneaux de verre après chaque utilisation. with a squeegee after each use. Product specifications are subject to change without notice • Des changements peuvent être apportés au produit sans préavis. TOOLS AND MATERIAL REQUIRED / OUTILS ET MATÉRIAUX REQUIS DRILL 3/32″ DRILL BIT SCREWDRIVERS PERCEUSE MÈCHE 3/32" TOURNEVIS PENCIL TAPE MEASURE MALLET CRAYON RUBAN À MESURER MAILLET WRENCH MASKING TAPE SILICONE CLÉ ANGLAISE RUBAN DE MASQUAGE SCELLANT LEVEL SAFETY GLASSES NIVEAU LUNETTES DE SÉCURITÉ PARTS LISTING / LISTE DES PIÈCES 5 1 5 3 3 12 13 6 6 4 4 2 PARTS LISTING / LISTE DES PIÈCES 7 8 9 10 11 12 13 ITEMI PARTS AND HARDWARE / PIÈCES ET QUINCAILLERIE QTY 1 TOP TRACK / RAIL SUPÉRIEUR 1 2 BOTTOM GUIDE / GUIDE INFÉRIEUR 2 3 WALL JAMB / JAMBAGE 2 4 BOTTOM RAIL / RAIL INFÉRIEUR 1 5 GLASS PANEL / PANNEAU DE VERRE 2 6 HANDLE BAR / POIGNÉE 2 7 WHEELS / ROUES 4 8 PAN HEAD MACHINE SCREW #8 - ⅜″ / VIS PAN #8 - ⅜″ 4 9 PAN SCREW #8 - 1 ½″ / VIS PAN #8 - 1 ½″ 6 10 PAN SCREW #8 - ⅜″ / VIS PAN #8 - ⅜″ 2 11 BUMPER / BUTOIR 2 12 KEY / CLÉ 1 13 SCREW CAP / CAPUCHON COUVRE-VIS 6 5 1 MARK CENTER LINE / MARQUER LA LIGNE DU CENTRE 2 PLACE BOTTOM TRACK ON CENTER LINE / PLACER LE RAIL INFÉRIEUR SUR LA LIGNE DU CENTRE INTERIOR SHOWER SIDE 4 6 INTÉRIEUR DE LA DOUCHE 3 PLACE CENTER OF WALL JAMBS ON THE LINE / PLACER LE CENTRE DES JAMBAGES SUR LA LIGNE INTERIOR SHOWER SIDE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE INTÉRIEUR DE LA DOUCHE 3 3 4 LEVEL AND MARK THE DRILLING LOCATIONS / NIVELER ET MARQUER LES POINTS DE PERÇAGE USE A 3/32" DRILL BIT UTILISER UNE MÈCHE DE 3/32". 7 5 REMOVE THE WALL JAMBS AND BOTTOM TRACK / RETIRER LES JAMBAGES ET LE RAIL INFÉRIEUR 6 INSTALL THE BOTTOM TRACK / INSTALLER LE RAIL INFÉRIEUR Wipe the base with a clean cloth before installing the bottom track. Essuyer la base avec un chiffon propre avant d’installer le rail inférieur. INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 8 4 7 PLACE CENTER OF WALL JAMBS ON THE LINE / PLACER LE CENTRE DES JAMBAGES SUR LA LIGNE INTERIOR SHOWER SIDE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE INTÉRIEUR DE LA DOUCHE 3 3 8 INSTALL BOTH WALL JAMBS / INSTALLER LES DEUX JAMBAGES INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 9 3 13 3 3 11 3 9 13 9 4 INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 9 9 PLACE THE TOP TRACK ON THE WALL JAMB / PLACER LE RAIL SUPÉRIEUR SUR LES JAMBAGES 1 1 3 SIDE VIEW VUE LATÉRALE 10 ASSEMBLE EXTERIOR DOOR PANEL / ASSEMBLER LE PANNEAU DE PORTE EXTÉRIEUR INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 7 8 ROUGH OR PATTERNED SIDE OF GLASS MUST BE ON THE EXTERIOR SIDE OF THE SHOWER CÔTÉ TEXTURÉ DU VERRE À L'EXTÉRIEUR DE LA DOUCHE INTERIOR SHOWER SIDE 6 INTÉRIEUR DE LA DOUCHE 8 7 INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 10 11 INSTALL EXTERIOR DOOR PANEL / POSER LE PANNEAU DE PORTE EXTÉRIEUR INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 12 ADJUST EXTERIOR DOOR PANEL / AJUSTER LE PANNEAU DE PORTE EXTÉRIEUR ADJUST AJUSTER 11 9 ASSEMBLE INTERIOR DOOR PANEL / ASSEMBLER LE PANNEAU DE PORTE INTÉRIEUR INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 7 8 ROUGH OR PATTERNED SIDE OF GLASS MUST BE ON THE EXTERIOR SIDE OF THE SHOWER CÔTÉ TEXTURÉ DU VERRE À L'EXTÉRIEUR DE LA DOUCHE 6 8 7 INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 10 INSTALL INTERIOR DOOR PANEL / POSER LE PANNEAU DE PORTE INTÉRIEUR INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 12 11 ADJUST INTERIOR DOOR PANEL / AJUSTER LE PANNEAU DE PORTE INTÉRIEUR ADJUST AJUSTER 12 INSTALL BOTTOM GUIDE INTO THE BOTTOM RAIL / INSTALLER LE GUIDE DU BAS DANS LE RAIL INFÉRIEUR 13 10 2 4 INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE 13 13 SEAL THE SHOWER UNIT / CALFEUTRER LA DOUCHE INTERIOR SHOWER SIDE INTÉRIEUR DE LA DOUCHE HOURS HEURES 14