SS-51SL-CAT - Longevity Acrylics Inc

Transcription

SS-51SL-CAT - Longevity Acrylics Inc
L004
SS-51SL-CAT
INSTRUCTION MANUAL │ GUIDE D’INSTALLATION
02/2016
SLIDING SHOWER DOOR │ PORTE DE DOUCHE COULISSANTE
6861 Richmond Road, Summerstown, Ontario K0C 2E0 │ Tel: 613-931-1615 │www.longevityacrylics.com
Please keep this manual and product code number for future reference
and for ordering replacement parts if necessary.
Veuillez conserver ce manuel et le code de produit pour des références futures,
et au besoin, la commande de pièces de rechange.
GENERAL INSTRUCTIONS
•
Read this manual carefully and completely
En
INSTRUCTIONS GÉNÉRALES
•
before proceeding.
•
It is recommended that you wear safety
•
Caulking: no sealant is required inside the
shower, unless otherwise stated.
•
Some models are equipped with clear
sealing gaskets.
CARE FOR YOUR SHOWER DOOR
•
Never use scouring powder pads or sharp
•
NOTE
•
•
Certains modèles sont dotés de joints d’étanchéité clairs.
L’ENTRETIEN DE VOTRE DOUCHE
•
Ne jamais utiliser de poudre ou de tampon à récurer, ni
d’instrument tranchant sur les parties en métal ou en verre.
De temps à autre, il suffit de nettoyer la porte avec une
solution d’eau et un détergent doux pour conserver l’aspect
soap diluted in water is all that is needed
neuf des panneaux de verre et du cadre en aluminium.
to keep the panels and aluminum parts
We recommend wiping the glass panels
Calfeutrage: aucun scellant n’est nécessaire à l’intérieur
de la douche.
els. An occasional wiping down with a mild
•
Il est recommandé de porter des lunettes de sécurité en
tout temps lors de l’installation.
instruments on metal pieces or glass pan-
looking new.
Fr
d’installation avant de procéder.
glasses at all times during the installation.
NOTICE
Lire attentivement et complètement le manuel
•
Nous recommandons de passer une raclette de douche
sur les panneaux de verre après chaque utilisation.
with a squeegee after each use.
Product specifications are subject to change without notice • Des changements peuvent être apportés au produit sans préavis.
TOOLS AND MATERIAL REQUIRED / OUTILS ET MATÉRIAUX REQUIS
DRILL
3/32″ DRILL BIT
SCREWDRIVERS
PERCEUSE
MÈCHE 3/32"
TOURNEVIS
PENCIL
TAPE MEASURE
MALLET
CRAYON
RUBAN À MESURER
MAILLET
WRENCH
MASKING TAPE
SILICONE
CLÉ ANGLAISE
RUBAN DE MASQUAGE
SCELLANT
LEVEL
SAFETY GLASSES
NIVEAU
LUNETTES DE SÉCURITÉ
PARTS LISTING / LISTE DES PIÈCES
5
1
5
3
3
12
13
6
6
4
4
2
PARTS LISTING / LISTE DES PIÈCES
7
8
9
10
11
12
13
ITEMI
PARTS AND HARDWARE / PIÈCES ET QUINCAILLERIE
QTY
1
TOP TRACK / RAIL SUPÉRIEUR
1
2
BOTTOM GUIDE / GUIDE INFÉRIEUR
2
3
WALL JAMB / JAMBAGE
2
4
BOTTOM RAIL / RAIL INFÉRIEUR
1
5
GLASS PANEL / PANNEAU DE VERRE
2
6
HANDLE BAR / POIGNÉE
2
7
WHEELS / ROUES
4
8
PAN HEAD MACHINE SCREW #8 - ⅜″ / VIS PAN #8 - ⅜″
4
9
PAN SCREW #8 - 1 ½″ / VIS PAN #8 - 1 ½″
6
10
PAN SCREW #8 - ⅜″ / VIS PAN #8 - ⅜″
2
11
BUMPER / BUTOIR
2
12
KEY / CLÉ
1
13
SCREW CAP / CAPUCHON COUVRE-VIS
6
5
1
MARK CENTER LINE / MARQUER LA LIGNE DU CENTRE
2
PLACE BOTTOM TRACK ON CENTER LINE / PLACER LE RAIL INFÉRIEUR SUR LA LIGNE DU CENTRE
INTERIOR
SHOWER SIDE
4
6
INTÉRIEUR
DE LA DOUCHE
3
PLACE CENTER OF WALL JAMBS ON THE LINE / PLACER LE CENTRE DES JAMBAGES SUR LA LIGNE
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
INTÉRIEUR
DE LA DOUCHE
3
3
4
LEVEL AND MARK THE DRILLING LOCATIONS / NIVELER ET MARQUER LES POINTS DE PERÇAGE
USE A 3/32" DRILL BIT
UTILISER UNE MÈCHE DE 3/32".
7
5
REMOVE THE WALL JAMBS AND BOTTOM TRACK / RETIRER LES JAMBAGES ET LE RAIL INFÉRIEUR
6
INSTALL THE BOTTOM TRACK / INSTALLER LE RAIL INFÉRIEUR
Wipe the base with a clean cloth
before installing the bottom track.
Essuyer la base avec un chiffon propre
avant d’installer le rail inférieur.
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
8
4
7
PLACE CENTER OF WALL JAMBS ON THE LINE / PLACER LE CENTRE DES JAMBAGES SUR LA LIGNE
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
INTÉRIEUR
DE LA DOUCHE
3
3
8
INSTALL BOTH WALL JAMBS / INSTALLER LES DEUX JAMBAGES
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
9
3
13
3
3
11
3
9
13
9
4
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
9
9
PLACE THE TOP TRACK ON THE WALL JAMB / PLACER LE RAIL SUPÉRIEUR SUR LES JAMBAGES
1
1
3
SIDE VIEW
VUE LATÉRALE
10
ASSEMBLE EXTERIOR DOOR PANEL / ASSEMBLER LE PANNEAU DE PORTE EXTÉRIEUR
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
7
8
ROUGH OR PATTERNED SIDE OF GLASS MUST
BE ON THE EXTERIOR SIDE OF THE SHOWER
CÔTÉ TEXTURÉ DU VERRE À L'EXTÉRIEUR DE
LA DOUCHE
INTERIOR
SHOWER SIDE
6
INTÉRIEUR
DE LA DOUCHE
8
7
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
10
11
INSTALL EXTERIOR DOOR PANEL / POSER LE PANNEAU DE PORTE EXTÉRIEUR
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
12
ADJUST EXTERIOR DOOR PANEL / AJUSTER LE PANNEAU DE PORTE EXTÉRIEUR
ADJUST
AJUSTER
11
9
ASSEMBLE INTERIOR DOOR PANEL / ASSEMBLER LE PANNEAU DE PORTE INTÉRIEUR
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
7
8
ROUGH OR PATTERNED SIDE OF GLASS MUST
BE ON THE EXTERIOR SIDE OF THE SHOWER
CÔTÉ TEXTURÉ DU VERRE À L'EXTÉRIEUR DE
LA DOUCHE
6
8
7
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
10
INSTALL INTERIOR DOOR PANEL / POSER LE PANNEAU DE PORTE INTÉRIEUR
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
12
11
ADJUST INTERIOR DOOR PANEL / AJUSTER LE PANNEAU DE PORTE INTÉRIEUR
ADJUST
AJUSTER
12
INSTALL BOTTOM GUIDE INTO THE BOTTOM RAIL / INSTALLER LE GUIDE DU BAS DANS LE RAIL INFÉRIEUR
13
10
2
4
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
13
13
SEAL THE SHOWER UNIT / CALFEUTRER LA DOUCHE
INTERIOR
SHOWER SIDE
INTÉRIEUR
DE LA DOUCHE
HOURS
HEURES
14

Documents pareils