Access map

Transcription

Access map
RUEIL 2000
Access map
A
86
RN 19 0
Pont
de Chatou
RN
Visitors
1 cours Ferdinand-de-Lesseps
92500 Rueil-Malmaison
Tel.: 01 47 16 35 00
Fax: 01 47 51 91 02
www.vinci.com
4
LA
Pont de Neuilly
R N 13
13
PARIS
Carrefour
de La Boule
Porte
MAILLOT
From Paris
From Porte Maillot, continue towards La Défense. After the Pont de Neuilly
bridge, take the tunnel straight ahead to pass under La Défense. There are two
possible itineraries:
- by the RN 13 and the RN 190. In the tunnel, take the first exit to the left, direction Reuil-Malmaison – Saint-Germain-en-Laye (RN 13). Stay on the RN 13 to
the La Boule intersection which you will cross using the underground passage
(height restrictions) towards Nanterre on the RN 190.
- by the A14 and the A86. Continue along the tunnel passing under La Défense, direction Saint-Germain-en-Laye, for 3-4 kilometres. Take the exit to the right, direction
Saint-Germain-en-Laye. Follow the signs for Saint-Germain-en-Laye/RueilMalmaison and cross the Pont de Chatou bridge. Continue straight ahead for 4 km.
E
Arrival by the A86
Exit at Rueil (exit 35) on the right immediately after passing under the VINCI road
bridge (exit 35b). On the exit slip road,
turn right again.
A 86
L
A
Ile
S
de
Ch
E
at
I
ou
N
N
Guests with reduced mobility
Guests with reduced mobility are welcome
to call +33 1 47 16 35 00 for assistance.
E
E
LA DÉFENSE
NANTERRE
RUEIL MAL MAISON
Deliveries
37- 39 rue Louis Blériot
S
LA
A1
E
IN
SE
IN
Pon
t
Cha de
tou
Eurovia
VINCI
PLACE DE
L'EUROPE
VINCI Construction
VINCI Autoroutes
VINCI Construction Grands Projets
VINCI Airports
VINCI Construction International Network
VINCI Concessions
AV
Parking
EN
ED
NOVOTEL
D
MAR
AR
COL
OU
AV. D
E
UE
Eurovia
VINCI Construction International Network
Pedestrian access
RER line A
From Paris, direction Saint-Germain-enLaye. Get off the train at the Rueil-Malmaison station.
BE
LIN
RES
RER
90
T
ER
igne A
1
RER l
RN 1
LB
ER
Deliveries
-GA
EUX
ion
Stat
86
E
.A
AV
VINCI Airports
VINCI Autoroutes
VINCI Concessions
RU
D
DES
A
Guests
VINCI
VINCI Construction
VINCI Construction Grands Projets
Bus: From the following metro stations
- La Défense: line 144
- Pont de Sèvres: line 467
- Porte d’Auteuil: line 241
- Porte Maillot: line 244
- Pont de Neuilly: line 158
- Pont de Bezon: line 367
Reuil-Malmaison bus stop
opposite the RER station.