November 2015
Transcription
November 2015
Photos : ©EDF Médiathèque - Alexis Morin- Antoine Soubigou/Tous droits réservés. Aménagement Flamanville 3, Communication. NEWS FLASH EPR FLAMANVILLE 3 NOVEMBER 2015 Reactor building Workers removing the last formwork panels for lift no. 13 (248 panels were required for lifts no. 13,14 and 15), before concreting the 16th lift of the outer dome. Reactor building Concreting operations on the 16th concrete lift will mark the completion of the dome’s outer containment structure. Construction site The concrete mixing facility will soon be leaving the construction site. Reactor building The core barrel housing the lower vessel internals is installed inside the reactor vessel. Reactor building ….The heavy reflector is then installed inside the core barrel. In combination with each other, all these elements make up the lower vessel internals. The core barrel and heavy reflector are connected by tie rods and form one unit: the lower internals. Fuel building Worker painting the fuel pool bridge track around the spent fuel pool. The dark pink colour demarcates an FME area to prevent objects from being dropped. Fuel building Worker sanding a panel. (3) La cheminée est positionnée sur le bâtiment combustible. Elle aura pour fonction de rejeter l’air issu des systèmes de ventilation en zone contrôlée après traitement ainsi que les effluents gazeux. Safety buildings Worker using a special tool to perform a functional test on a cooling-water valve. Safety buildings From the main control room, teams run tests on systems in the diesel house, turbine building and pump house. Diesel house Tests being performed on the diesel house ventilation system: workers checking the capacity of ventilation system actuators. Diesel house Tests being performed on the south diesel house ventilation system. Diesel house Worker making adjustments to a diesel engine shaft. Diesel house Worker adjusting the position of cables inside their cable trays. Turbine building Cleaning operations inside the turbine building. Nuclear auxiliary building Workers connecting a transformer to its switchboard. Nuclear auxiliary building Workers performing a hydrostatic test on a hot water distribution system. Pump house Worker installing a guard on circulating water filtration motors (high-pressure flushing pump). Access tower First set of electrical cabinets being unloaded prior to installation in the building’s telecom rooms.