2016 - Fluxys
Transcription
2016 - Fluxys
2016 END USER GAS SUPPLY DAY GAS SUPPLY AND DEMAND AND DEMAND OUTLOOK 10th EDITION OUTLOOK 1 Arno Büx AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 2 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 3 GAS SUPPLY AND DEMAND ENERGY MARKET OUTLOOK IN BRIEF Arno Büx 4 bcm/y DESPITE FLAT DEMAND OUTLOOK: SUPPLY GAP WIDENS AS INDIGENOUS PRODUCTION DECLINES 500 450 400 350 300 250 200 150 100 50 0 Import requirements European production incl. Norway Demand Source: Entsog TYNDP 2015 5 Fluxys: partner in c. 45-55 bcm/y additional supply capacity into Europe DUNKIRK LNG TERMINAL TO BE COMMISSIONED SUMMER 2016 NBP Zeebrugge TTF GasPool Dunkirk NCG 6 LNG: HUGE AMOUNTS OF NEW LIQUEFACTION CAPACITY COMING ON STREAM 2015-2020 22 bcm/y bcm/y Ample regasification capacity 2015: ~25% utilisation rate 82 bcm/y 220 210 200 190 Prices 20.04.2016 • Henry hub: 1.78 $/MMBtu • Europe: 4.11 $/MMBtu • Asia: 4.05 $/MBtu 82 bcm/y 180 170 160 150 EU strategy: LNG as means of diversification of supply 7 LNG regas operational LNG regas under construction REVERSE FLOW ACCROSS THE ALPS: A FLUXYS INITIATIVE LEVERAGING THE TANAP/TAP PROJECT FOR NW-EUROPE BBL NBP TTF NEL INTERCONNECTOR GasPool DUNKIRK LNG TERMINAL ZTP TENP NCG PEG N Reverse flow project Transitgas & TENP: enable south to north flows (2018) TRANSITGAS PSV SOUTH CAUCASUS PIPELINE TRANS ADRIATIC PIPELINE Construction started May 2016 8 TRANS ANATOLIAN PIPELINE SHAH DENIZ PHASE II L-GAS PRODUCTION DECLINE: FLUXYS INFRASTRUCTURE OF KEY IMPORTANCE FOR GERMANY’S SWITCH TO H-GAS Slochteren field L-gas production Germany in decline as well • Supply from the west through the Eynatten interconnection point • Reverse flow project: supply from the south through the Wallbach interconnection point 9 NCG-BELUX MARKET INTEGRATION: FAST TRACK OPTION TO SUPPORT L/H CONVERSION • Belux market integration provides proof of concept • No infrastructure investment required • Creation of the largest market zone in Europe • Access to LNG even more competitive • Paves the way for other market integration projects 10 RUSSIAN GAS: ROUTE DIVERSIFICATION Nord Stream II String 3 & 4 55 bcm/y Nord Stream I String 1 & 2 55 bcm/y ‘Bulgarian Stream’ – IGI Poseidon Existing Planned or announced 11 Turkish Stream 16 bcm/y Expandable to 63 bcm/y GAS DEMAND TODAY OUTLOOK: UNCLEAR Consumption of gas and power EU 28 (2014 – TWh) 5000 4322 4000 2942 3000 2000 1000 0 [Eurogas] Gas Power Breakdown of gas consumption EU 28 (2014) 0,0 10,0 20,0 30,0 40,0 % Residential 42 % Industry 34,0 % Power generation % Transport [Eurogas] 12 50,0 23,5 0,5 • Society can make several choices • We make sure the infrastructure is available for society to choose for gas • Costs of increased optionality to be socialized? GAS IDEAL PARTNER OF RENEWABLE GENERATION • Combining wind/solar with coal is not justifiable from a societal point of view • Nuclear has very low flexibility 13 Installed capacity in MW POWER GENERATION IN BELGIUM: IMPACT LIFETIME EXTENSION NUCLEAR PLANTS DOEL 1 & 2 7000 6000 5000 4000 • Additional gas-fired power plants will be mothballed 3000 • But they will be needed once nuclear phase-out kicks in 2000 • Urgent need for long-term energy vision for Belgium 1000 • EU review electricity market model equally important 0 2015 2016 2017 Doel 1 14 2018 Doel 2 2019 Doel 3 2020 2021 Oct-22 Feb-23 Feb-25 Jul-25 Sep-25 Oct-25 Dec-25 Doel 4 Tihange 1 Tihange 2 Tihange 3 SHAPING THE MARKET FOR GAS AS TRANSPORT FUEL L N G 2nd jetty to be commissioned 2016 + study 3rd jetty Fluxys partner in bunker ship 4000 Successful promotion Fluxys and DSOs of CNG cars Brussels Motor Show 2014-15-16 3000 C N G 2000 MoU cooperation small-scale LNG 100 80 60 40 1000 0 2013 2014 2015 2016 as is 15 LNG filling stations Number of CNG 20 fuelling stations 0 steadily increasing 2013 2014 2015 2016 2017 IMPORTANCE OF HEATING MARKET • Heating & cooling part of Commission’s Winter Package • Gas-based technology is fully part of the potential to make heating cleaner & more efficient • Energy system cost to be taken into account as well: optimum use of gas system avoids unnecessary investments in electricity system 16 WRAP-UP GAS SUPPLY AND DEMAND OUTLOOK Supply • Fluxys partner in c. 45-55 bcm/y of additional supply capacity into Europe and ready to invest in more • Fluxys infrastructure of key importance for Germany’s switch to Hgas Demand • Power: renewables/gas is the best combination − Sweat out the energy policy antics regarding coal-fired and nuclear capacity − Keep in mind gas as an answer to pressing air quality issues • Transport: market is taking shape • Heating: core market segment where gas & gas technology have clear advantages 17 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 18 FOCUS ON BELGIUM Huberte Bettonville 19 FLUXYS BELGIUM ACTIVITIES Regulated activities • 100% open access – regulated TPA Transmission & HUB • Hub services became regulated, under transmission, on 1/1/2016 Our infrastructure • 4100 km pipelines – 20 IPs • LNG Terminal, with a deliverability of 9 bcm/y Storage • 700+ mcm storage volume in Loenhout FLUXYS BELGIUM 424 TWh transported in 2015, up 6%, compared to 2014 LNG terminalling Distrib. 88 TWh Transit 59% Domestic 41% Industry 43 TWh Power 45 TWh 20 TRANSMISSION: CONSUMPTION OF INDUSTRIALS IN GWH Industrial consumption over the years GWh 5.000 4.500 4.000 3.500 3.000 2.500 2.000 1.500 1.000 500 Industry 2009 Industry 2010 Industry 2011 Industry 2012 Industry 2013 Industry 2014 Industry 2015 Industry 2016 0 1 2 3 4 5 6 7 8 9 2015 vs 2014 : +4.8% Q1-2016: average consumption for industrials 21 10 11 12 TRANSMISSION: CONSUMPTION OF POWER PLANTS IN GWH Power Plants consumption over the years GWh 8.000 7.000 6.000 5.000 4.000 3.000 2.000 1.000 PP 2009 PP 2010 PP 2011 PP 2012 PP 2013 PP 2014 PP 2015 PP 2016 0 1 2 3 4 5 6 7 8 9 2015 vs 2014 : +12.4% Q1-2016: 10% less than Q1-2015 22 10 11 12 TRANSMISSION: CONSUMPTION OF PUBLIC DISTRIBUTION IN GWH Public Distribution consumption over the years GWh 20.000 18.000 16.000 14.000 12.000 10.000 8.000 6.000 4.000 2.000 PD 2009 PD 2010 PD 2011 PD 2012 PD 2013 PD 2014 PD 2015 PD 2016 0 1 2 3 4 5 6 7 8 9 10 2015 vs 2014 : +15.5% Q1-2016: average consumption level for the public distribution 23 11 12 TRANSMISSION: TOTAL BELGIAN CONSUMPTION IN GWH Belgian consumption over the years GWh 30.000 25.000 20.000 15.000 10.000 5.000 Belgium 2009 Belgium 2010 Belgium 2011 Belgium 2012 Belgium 2013 Belgium 2014 Belgium 2015 Belgium 2016 0 1 2 3 4 5 6 7 8 9 10 2015 vs 2014 : +9.6% Q1-2016: average consumption level for the Belgian market 24 11 12 FLUXYS BELGIUM ACTIVITIES 2015 Highlights Transmission & HUB 1 • BAL & CAM Network Code compliancy • BeLux market integration 2 • New tariffs 2016-2019 • Start-up new IP Alveringem, with GRTgaz 3 Storage • ZTP liquidity developments, including Hub regulation • Preparatory works for long term conversion of L-market towards H-gas FLUXYS BELGIUM 4 • Improvements on services for domestic market Outlook 2016 LNG terminalling • Start-up Dunkirk LNG Terminal 5 • Towards final BELUX implementation • Next steps conversion of L-market towards H-gas 6 25 • Hub & transmission services improvement 1 BUNDLED PRODUCTS ACTIVATED ON PRISMA • Full CAM compliance since 1 Nov 2015 • Bi-directional bundled products offered with all neighboring TSOs, where CAM applies − FIRM & BACKHAUL − YEARLY to WITHIN-DAY • Available capacity on all IPs, yet subject to short term quotas • Unbundled products still available in function of IP specific capacities • EDIG@S-based single-sided nominations available from March 2016 onwards 26 1 BALANCING NC: COMPLIANT SINCE 1 OCTOBER 2015 GWh • Fully compliant with BAL NC requirements − Neutrality charge is 0 − Balancing Account published 40 Within-day market position H-zone 01/01/15 01/10/15 01/01/16 30 20 10 0 − Settlement price based on TSO transactions or ZTP+ -10 -20 -30 • Proven reliable balancing system since 2012 − Limited WD exceedings or EOD settlements BELUX integration or BAL NC changes didn’t trigger market instability -40 ZTP vs H-zone settlement price (€/MWh) 30 25 20 15 10 − ZTP pricing is reliable and significant price signal for balancing actions 5 0 TSO settlement price is in line with ZTP ZTP ZTP_H settlement price Source: Fluxys Belgium, Energy Market Price 27 2 CONTINUOUS EFFORTS TO OFFER COMPETITIVE TRANSMISSION TARIFFS … Fluxys Belgium's transmission tariff evolution (entry + HP supply tariff) €/m³(n)/h/year 35 30 -26% 25 20 15 10 5 0 2007 2008 2009 2010 Entry + HP supply tariff in real terms (basis 2010) 28 2011 2012 2013 2014 2015 2016 2017 2018 2019 3 TRADING SERVICES BECAME REGULATED AS FROM 1 JANUARY 2016 Anonymous electronic trading Over the counter bilateral trading Deal registration & Netting of trading positions Transmission Services Consolidation of net trading position in Grid User Balancing Position 29 3 ZEEBRUGGE BEACH TRADED VOLUMES 2015 year review • 75 active trading partners • Average 2.2 TWh/day traded in 2015 (1.9 TWh/day traded in 2016 so far) • Stable performance, supported in 2015 by LNG 791 TWh traded +6,6 % Y-o-Y Zee Beach yearly traded volumes in TWh 900 800 700 600 500 400 300 200 100 0 2001 30 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 3 TRADED QUANTITIES AT ZTP(L) ARE STEADILY INCREASING 2016 • 78 registered trading partners, with up to 46 concurrently active traders • Growing performance month by month, up to 565 GWh per day in April 2016 • 4 Market Makers Agreements and Competitive tariffs support ZTP(L) liquidity development Average daily traded volumes on ZTP(L) per month in GWh 700 All time record 600 GWh 500 400 300 200 100 0 31 3 26 COMPARISON BETWEEN ZTP AND NEIGHBOURING Day-Ahead prices of major NW-European gas hubs (€/MWh) HUBS 22 Highly interconnected hubs with well supplied contracted capacity lead to highly correlated and converging prices 18 14 10 ZTP ICE TTF DA NBP DA PEG NORD NCG • Commodity spreads between TTF and ZTP is mostly in favor of ZTP (lower ZTP prices) • Transport cost from TTF to ZTP (0,33€/MWh*) further improves this ZTP advantage More than 90% of the time TTFsourcing is more expensive * Optimal usage of yearly capacity from TTF to ZTP passing through ‘s Gravenvoeren (day capacity is more expensive) Source: Fluxys Belgium, Energy Market Price 32 4 IMPROVING SERVICES FOR DOMESTIC MARKET FIX/FLEX Once a year shippers decide on booking strategy for each end user domestic exit point, either: • Ex-Ante booking: Yearly in combination with optional additional seasonal or short term services (short term factor = 5) • Yearly booking with FIX/FLEX option*: − FIX component: tariff @ 50% of yearly tariff − FLEX component: 2 steps variable fee • Fully automatic through Electronic Booking System » Break-even at 2000h ** » 10% uplift at 8760h • Variable fee per running hours − Easily manageable for market − No problems with offset between gas and electricity day • No additional short term capacity bookings * Not possible in case of bank guarantee or Strategic Reserve ** # running hours calculated by dividing hourly gas off take with booked level 33 4 IMPROVING SERVICES FOR DOMESTIC MARKET FIX/FLEX : economics behind the two options Break-even = 2000h Uplift = 10% * Capacity fee for high calorific end user domestic exit capacities shown in graph, but same principle applies to low calorific end users 34 4 IMPROVING SERVICES FOR DOMESTIC MARKET STREAMLINED QUALITY CONVERSION SERVICES • Peak load HL service: − From 1 Nov to 31 Mar: 177k.m³(n)/h conditional to temperature + 23k.m³(n)/h interruptible sold in bundles − Fixed tariff 1,65€/bundle + Variable tariff at 1,56€/MWh Winter product as insurance for extreme cold snap 350 300 250 200 150 100 50 0 • Base load HL service: Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb − 100k.m³(n)/h available all year Jan Capacity in 1000 m³(n)/h H->L quality conversion products − Fixed tariff @ 32,32€/m³(n)/h/, No variable tariff Enables ZTP-based flat sourcing for L market Interruptible peak load Firm peak load • Seasonal HL service: − 100k.m³(n)/h in winter, 50k.m³(n)/h in summer − Fixed tariff @ 28,80€/m³(n)/h/y, No variable tariff Enables ZTP-based profiled sourcing for L market 35 5 BELUX, THE FIRST EU CROSS-BORDER MARKET INTEGRATION … successfully launched on 01.10.2015! Fluxys Belgium • Belgian H-gas area & Luxembourg have been working since 01.10.2015 as an integrated market • BeLux balancing model is 100% compliant with BAL NC ZTP • Neutrality fee is 0 €/MWh • Smooth operations so far • In current set-up, Fluxys Be is still balancing operator of the BeLux area 36 Creos 5 MILESTONES TOWARDS BELUX FINAL SET-UP Following actions need to be completed before starting the commercial transition towards final set-up, as stipulated in the amendment to the Belgian Gas Act of July 2015: 1 2 Approval by CREG of Balansys’ Compliance Officer’s candidature Submission of Balansys’ Compliance Programme to ACER, together with formal advice by CREG 3 Approval by ACER of Balansys’ Compliance Programme 4 Approval by CREG of Balansys’ Regulated Documents (Balancing Agreement, Code & Programme) Now Start final set-up BeLux 1 2 3 4 Commercial transition 37 FLUXYS BELGIUM ACTIVITIES 2015 Highlights Transmission & HUB • Throughout the year, very low seasonal spreads • Highly correlated and liquid markets • Low oil prices and mild weather conditions driving gas prices downwards • Limited extra sales on top of LT existing contracts Storage Outlook 2016 FLUXYS BELGIUM LNG terminalling • Mixed views regarding market conditions for seasonal storage: might still be influenced by late winter weather conditions • Low oil-prices still drag LT gas prices to bottom levels, yet summer-winter spreads are widening • Loenhout capacities are available 38 LOENHOUT CAPACITIES AVAILABLE - FLEXIBLE SOLUTIONS Seasonal spreads are slightly widening 28 26 24 22 20 18 16 14 12 10 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 Gas Price Q3/2016 Gas Price Next Winter • About 2/3 of storage capacity sold on LT basis up to 2023 • Remaining capacities following subscription window flexible offer: − SBUs or additional services − From LT to ST contracts (within-year, year-ahead, multi-year) − Volume and throughput can be dynamically adjusted to optimize capacities wrt. demand : from slow seasonal to faster cycling storage Prices in €/MWh – Gas Price: Zeebrugge Beach (average of daily quotes) – Source: EnergyMarketPrice 39 FLUXYS BELGIUM ACTIVITIES 2015 Highlights Transmission & HUB 1 • LNG back to Europe > high delivery and send-out • Further developments on small-scale LNG 2 • Construction works for 2nd Jetty 3 • YAMAL transshipment contract • FID & preparatory works for 5th tank Storage • Market test for extra LT commitments FLUXYS BELGIUM Outlook 2016 • Commissioning 2nd Jetty • Construction works on 5th tank LNG terminalling 4 40 • Investigate further developments based on 2015 market test results 1 ZEEBRUGGE LNG TERMINAL IN FIGURES LNG Terminalling activity in Zeebrugge Situation on 30/04/2016 Unloadings Large Loadings Small Scale Loadings Truck loading in Zeebrugge Total booked Truck loadings Situation on 30/04/2016 Situation on 30/04/2016 Truck Movements 2013 2014 2015 2016 819 1668 1182 517 For delivery in Poland, UK, the Netherlands and Scandinavia 41 2013 2014 2015 2016 37 34 41 12 21 19 11 6 0 0 17 5 Booked 2013 2014 2015 2016 857 1996 1670 1467 2 SECOND JETTY - COMMISSIONING IN 2016 • Reception of LNG carriers with capacity from 2,000 to 217,000 m³ LNG (including LNG bunker carriers) − Unloading and loading − Ship-to-ship transfers • Long-term market for bunker vessel loading developing: 200 berthing slots already sold under long-term contracts 42 3 5TH TANK & TRANSHIPMENT SERVICES • 20y capacity agreement for up to 8 mt/y LNG transshipment services at LNG terminal in Zeebrugge with YAMAL trade. • Investment in 5th storage tank and process installations: − ship-to-ship transshipments in 2018 − ship-storage-ship transshipments 2019 • Works have started: tank outer wall is constructed 43 4 SUCCESSFUL NON-BINDING LNG MARKET TEST 2015: NEED FOR A 3RD SMALL SCALE JETTY BEING ANALYZED • Fluxys LNG completed a market test for additional capacities at the Zeebrugge terminal • Phase 1: jetty for small-scale vessels • Phase 2: additional jetty / storage / send-out for large scale • 11 participants expressed interest in both phase 1 and phase 2 • Possible expansion phase 1 is currently under investigation: a 3rd jetty for small LNG ships Possible expansions Existing infrastructure 44 WRAP UP FLUXYS BELGIUM • Improvements on Hub & transmission services • ZTP: increasing liquidity • Improving services for domestic market : FIX-FLEX • BELUX: aim to fully implement late 2016 • Storage capacities available • Zeebrugge LNG Terminal expansion to meet market’s needs 45 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 46 EVOLUTION GAZ-L Hany Aouad 47 CONVERSION L/H AGENDA 48 1. Gaz L en Belgique 2. Situation aux Pays-Bas 3. Conversion L-H en Belgique: planning GAZ H / GAZ L • Gaz L (10-12% N2) − Pouvoir calorifique supérieur kWh/m³(n) 8.78 - 10.75 − Index de Wobbe kWh/m³(n) 11.86 - 13.03 − Pouvoir calorifique supérieur kWh/m³(n) 10.28 - 12.81 − Index de Wobbe kWh/m³(n) 13.06 - 16.11 • Gaz H (0-4% N2) 49 Sloch -teren field 20 bcm/y to Germany 10 bcm/y to Belgium and France 50 MARCHÉ GAZ L Le réseau gaz L a été construit à partir de 1967 pour acheminer du gaz Slochteren vers la Belgique et la France Champ gazier Slochteren Stockage H/L fusionné DP-L • Site de production gaz Slochteren comme source principale de flex avec ~ 1000 milliard m³ réserves disponibles • Grande capacité de stockage (5.26 milliard m³) • Capacité de transfo (~ 5.600 km³/h) FLX steering • Pas de capacité de stockage pour le gaz L • Capacité de pointe transfo (~ 300 km³/h) GRTgaz steering DP-L Stockage 51 • Capacité de stockage disponible (Storengy - 1.28 milliard m³) • Capacité de pointe transfo (~ 300 km³/h) COEXISTENCE DE DEUX TYPES DE GAZ EN BELGIQUE • Historiquement le gaz en provenance des Pays-Bas = le premier gaz naturel importé en Belgique à partir de 1967 ZANDVLIET POPPEL Consommation annuelle L : 5 Mia m³(n) BLAREGNIES 1/3 consommation belge 50% consommation distribution publique 38 clients industriels raccordés sur réseau FLX 1.5 million raccordements sur réseau GRD 100% approvisionnement marché français Ni production, ni stockage • Suite à la croissance de la consommation de gaz, importation de gaz en provenance d’autres sources (Algérie, Norvège, UK, Qatar, etc) à partir de la fin des années 1970 Coexistence de deux réseaux de gaz naturel: gaz L et gaz H 52 LE RESEAU DE TRANSPORT DE GAZ NATUREL GNL PAYS-BAS PAYS-BAS ZANDVLIET NORVEGE ZELZATE ROYAUME-UNI POPPEL Loenhout ZEEBRUGGE Antwerpen Sint-Niklaas Mechelen Brugge DILSEN NORVEGE / ALLEMAGNE Gent Genk Winksele ‘S-GRAVENVOEREN Aalst Bruxelles Kortrijk NORVEGE / ALLEMAGNE Berneau 4.100 km de canalisations RUSSIE / ALLEMAGNE Liège Tournai EYNATTEN Verviers Gaz naturel à haut pouvoir calorifique Namur Charleroi Gaz naturel à bas pouvoir calorifique Mons Point d’interconnexion Terminal GNL Stations de compression Stations de mélange Stockage 53 BRAS BLAREGNIES FRANCE ESPAGNE ITALIE LUXEMBOURG Bastogne Libramont Arlon PETANGE LUXEMBOURG MARCHÉ GAZ L : LES DIFFÉRENTS ACTEURS GRT GRD Regulateur/Autorité Shipper & fournisseurs DP PAYS-BAS … Autorité néerlandaise Autorité Belge fédérale BELGIQUE LT supply contracts 18 shippers + fournisseurs DP Autorités régionales Shipper & founisseur FRANCE … 54 Autorité française CONVERSION L/H AGENDA 55 1. Gaz L en Belgique 2. Situation aux Pays-Bas 3. Conversion L-H en Belgique: approche REDUCTION DE LA PRODUCTION À GRONINGEN POUR RÉDUIRE LE RISQUE DE TREMBLEMENTS DE TERRE 56 INFORMATION SUR LA RESTRICTION DE PRODUCTION CHAMP SLOCHTEREN • Diminution de la production annuelle afin de diminuer les risques de tremblement de terre dans la région de Groningen − 2014: 42,5 bcm − 2015: 16,5 bcm jusqu’au 1/07/2015 − 2015-2016: décision prise en décembre 2015 de diminuer le niveau de production à 27 bcm pour l’année gazière 2015/2016 (33 bcm en cas d’année froide) − 2016-2017: Nouvelle décision attendue pour octobre 2016 • Sur base des études des autorités des Mines, un niveau de production inférieur à 27 bcm est nécessaire pour réduire le risque de tremblements de terre… • … pour des raisons de sécurité d’approvisionnement, une telle réduction est impossible sans l’appui de capacités de conversion additionnelles en NL et sans la conversion L-H des marchés allemand, français et belge. 57 CONVERSION L/H AGENDA 58 1. Gaz L en Belgique 2. Situation aux Pays-Bas 3. Conversion L-H en Belgique: planning CONVERSION L-H EN BELGIUM: APPROCHE BASÉE SUR L’EXPÉRIENCE • Approche de conversion L-H développée par Synergrid (Fluxys + GRD) sur base des enseignements tirés des expériences de conversion passée (2012 - 2015) • Conversion Inter-energa Leopoldsburg - Quand: 1er juin 2012 - Volumes L ≈ 5.000 m³(n)/h • Conversion de 12 consommateurs finaux en Campine Limbourgeoise - Quand: 1er sept. 2015 - Volumes L ≈ 60.000 m³(n)/h 59 APPROCHE ET TIMING • Principes directeurs: − Garantir la sécurité d’approvisionnement − Utilisation optimale des infrastructures existantes de transport de Fluxys Belgium (points d’injection en gaz H existants) • Timing: − Le planning indicatif de conversion démarre en 6/2016 pour se terminer fin 2029 » Le timing précis de conversion des consommateurs finaux est fonction de leur localisation géographique sur le réseau Fluxys − Une session d’information du marché est programmée avant les congés par Synergrid en présence des régulateurs et des autorités belges − Fluxys organisera en septembre 2016 une session d’information spécifique pour les consommateurs finaux raccordés sur son réseau et concernés par la conversion − Fluxys contactera proactivement chaque consommateur final concerné au minimum 1 an avant la date de sa conversion 60 PILOTE PROGRAMMÉ EN 6/2016 CONVERSION D’INTER-ENERGA HOUTHALEN ET DE 2 CLIENTS INDUSTRIELS 61 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 62 PLAN FOR INCIDENT MANAGEMENT AND SHUT-OFF PLAN Denis Bawin 63 THE LEGISLATIVE FRAMEWORK OF THE SECURITY OF SUPPLY European level : Regulation (EC) N° 994/2010 (*) (*) under review Member State level: - Risk Assessment Competent Authority - Preventive Action Plan responsibility - Emergency Plan Belgian law: - Gas Act: PFS Economy/DG Energy as Competent Authority - Code of Conduct (Art. 134 to 146) - MD Supply Gas Emergency Plan (18/12/2013) Fluxys Belgium level: - Plan for Incident Management (ACT - Attachment F) - Operational procedures (internal emergency plan) 64 SECURITY OF SUPPLY GENERAL PRINCIPLES • European legal framework: Regulation (EC) N°994/2010 − Each Member State has to rely on it to build its national security of supply policy. − Establishment of an emergency plan indicating the measures to be taken to cope with a supply disruption in natural gas. − Objective: » Reduce the impact of a potential disruption in natural gas consumption » Clarify the responsibilities of all stakeholders » Impose procedures in case of disruption of gas supply » Determine the level of security of supply (for 7-day peak in extreme temperature, 30 days of high demand and 30 days without the greatest infrastructure, all with a probability that arrives every 20 years) » Ultimate goal: to ensure gas supplies to protected customers (for Belgium = all customers of public distribution) 65 SOS REGULATION WITHIN FLUXYS BELGIUM Access Code for Transmission Consulted by market and approved by CREG Security of Supply regulation crisis levels & measures Attachment F: Plan for Incident Management Common approach for safeguarding system integrity and security of supply to protected customers General Emergency Plan Fluxys 66 … Specific Emergency Plan ICT Specific Emergency Plan SI/SOS Specific Emergency Plan Grid Specific Emergency Plan Loenhout Specific Emergency Plan Compression Specific Emergency Plan LNG Operational workbook Including Shut-off plan & recovery plan (based on principles COCII & crisis levels SOS) Code of Conduct Sequence of interruption in case of incident No sequence/priority defined between end users PRINCIPLES OF THE INCIDENT MANAGEMENT PLAN (ANNEX F – ACT) • Fluxys Belgium goal: preserving network integrity and security of supply of natural gas. • Base: Code of Conduct + Federal Emergency Plan for natural gas supply (Ministerial Decree of 18 December 2013) + internal emergency plan Fluxys Belgium. • Content: − The different phases in case of incident, − The procedures to follow in case of incident, − The specific measures in order to manage the incident, − The shut-off plan and the recovery plan. • Activation: − By Fluxys Belgium in case of the system integrity of the network grid is in danger (according to the rules of Code of Conduct) or, − At the request of the FPS Economy (Competent Authority) / DG Energy according to the Federal Emergency Plan. • Timing: − Actions must be taken in a timely and efficient manner to preserve the integrity of the system. − In case of reduction or shut-off plan, Fluxys Belgium seeks the most efficient and fastest solution to guarantee the supply of natural gas to end customers and made sure to respect a proportionate and non-discriminatory distribution of binding measures. 67 Need to consider impact on linepack and market position Linepack position Monitors network integrity Need for link under EE Available Linepack (Mm³) Market position Monitors market behavior Cumulative market imbalance position (Mm³) Max Linepack Market threshold Normal balancing Position LP Market position Incident balancing Min Linepack 0 6 12 18 24 0 Hrs 68 6 12 18 24 Hrs PRINCIPLES INCIDENT MANAGEMENT Ingoing principles for incident management Criteria for definition of incident Linepack position • Enable market reaction Max Linepack Available Linepack (Mm³) • Deploy own means to correct physical position (buy/sell on ZTP, operational means as Normal balancing Loenhout, Zeebrugge, agreements with adjacent Incident balancing Min Linepack Time 0 6 12 18 24 Hrs Forecast crosses ...or issue not expected to be solved in 2 hrs and forecast crosses incident LP boundary at some point during the gas day incident LP boundary in If issue is not solved after 2hrs (ex post), issue is recognized as coming hours... incident anyhow 69 TSO ...) • As last resort, execute shutoff plan CRISIS LEVELS FLUXYS BELGIUM Crisis level General Emergency Plan Fluxys Belgium NIVEAU 3 NIVEAU 2 NIVEAU 1 Crisis levels Specific Emergency Plan System Integrity/Security of Supply Fluxys EARLY WARNING ALERT EMERGENCY Normal balancing Incident balancing Shut-off plan When there is concrete, serious and reliable information that an event may occur which is likely to result in significant deterioration of the supply situation and is likely to lead to the alert or the emergency level being triggered When a supply disruption or exceptionally high gas demand occurs which results in significant deterioration of the supply situation, but the market is still able to manage that disruption or demand without the need to resort to nonmarket measures In the event of exceptionally high gas demand, significant supply disruption or other significant deterioration of the supply situation and in the event that all relevant market measures have been implemented but the supply of gas is insufficient to meet the remaining gas demand so that non-market measures have to be additionally introduced with a view, in particular, to safeguarding supplies of gas to protected customers 70 MEASURES PER CRISIS LEVEL FOR SHORTFALL Early warning Normal Balancing Measures market Measures TSO 71 • • • • • • Alert Emergency Incident Balancing Crisis balancing/ Shut-off plan increase imports withdrawal from LHT/LNG increase purchases on ZTP reduce exports reduce sales on ZTP reduce offtake end-users (Interruptible supply contracts) • Shut-off plan • constraint on entry (in case of 1. Interruptible capacity on all exit IPs entry shutdown or incident in grid) 2. Interruptible capacity on Quality to enable market reaction Conversion • withdraw Qopsincident from LNG 3. Interruptible capacity on CI/CE • use linepackincident 4. Flexibility constraint firm capacity on • emergency lending from adjacent exit IPs operator • Priority: • proactive purchase 1. causing shippers 2. helping shippers 5. Constraint on firm capacity Quality Conversion (if system integrity of L-grid not at risk) 6. Withdrawal shipper volumes from LHT 7. Firm capacity CI/CE 8. Public Distribution (= protected All measures available in the preceding crisis levels can be customers) applied • adapt market threshold • purchase on ZTP with settlement (if outside market threshold) • interruption on entry (in case of entry shutdown or incident in grid) to enable market reaction • withdraw Qopsnormal from LHT/LNG • use linepacknormal • adjacent operators (lending OBA) • manage maintenance works SHUT-OFF PLAN: FOCUS ON CI/CE • Shut-off plan: provides that firm End Users capacity may be interrupted in an emergency, to ensure supply to protected customers. • No classification in order of interruption of the End Users. • A category has a specific treatment (priority clients) that will be interrupted last: − Power plants that are strictly necessary to avoid a blackout on the electricity grid. − Industrial customers and power plants which are strictly necessary for the protection of Seveso installations. Fluxys Belgium receives from the competent authority a list of End Users who are identified to be taken into account. − Power plants identified by the operator of the electricity transmission grid as black start unit, in the case of black-start on the electricity grid. • Fluxys Belgium seeks the most efficient and fastest solution to ensure natural gas supply to the protected customers (Public Distribution). • Rotation system between End Users interrupted taking into account the last shut-off plan applied. 72 IN CONCLUSION • The plan for incident management of Fluxys Belgium: − Is based on the provisions of the Ministerial Decree establishing the Federal Emergency Plan of natural gas supply; − Fluxys Belgium does not currently have enough information about the specificities of the End Users to request a withdrawal reduction from them in case of prolonged shortage. − Fluxys Belgium will set up, either through reduction or interruption, the most efficient and fastest solution to ensure security of supply for all end customers as long as possible. − The effectiveness of the measure consisting of limiting the exit capacity to End Users is taken into account and only to the extent that this limitation will positively affects the guarantee of supply of natural gas to Protected Customers. 73 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 74 REMIT REGULATION ON WHOLESALE ENERGY MARKET INTEGRITY AND TRANSPARENCY 75 Denis Bawin REMIT IN A NUTSHELL Remit (Regulation on Energy Market Integrity and Transparency) Purpose: monitor wholesale energy markets to foster open and fair competition Data provision to ACER Registration of market participants Prohibition of insider trading & market manipulation Data to be provided to ACER, which can be used for monitoring the market & the Network codes implementation. Market participants entering into transactions which are required to be reported to the ACER (Agency for the cooperation of EU regulators) need to be registered with the relevant NRA (National regulatory authority). • Prohibition of insider trading • Publication of inside information (incl. REMIT message) by market participant or related undertakings for business or facilities it owns or controls END USERS CONCERNED BY THE REPORTING OF DATA TO ACER Who? End user having a “technical capability to consume” of at least 600 GWh per year • Capability to consume means the maximum amount of energy that a final customer could consume in a year, i.e. if the customer were to run its facility fully at all times throughout the year. • Multi-site: assessement site by site. • report only sites where capability to consume > 600 GWh/y, • if consumption of each site considered separatly < 600GWh/y, no reporting obligations • Natural gas and electricity consumption assessed separately. • Please refer to Q&A REMIT under https://www.acer-remit.eu/portal/customcategory/remit_questions for specific cases DATA TO BE PROVIDED BY THE CONCERNED END USERS TO ACER What? Data related to contracts for the supply and distribution of electricity or natural gas to final customers Over-the-counter transactions Standard contracts on following working day (traded on organized market place) Non-standard contracts one month following conclusion To be reported by the market participants themselves By use of the table (1 for standard contract; 2 for non-standard) to be found via: • Annex of “Implementation regulation 1348/2014” “eur-lex.europa.eu” • or TRUM (Transaction reporting user manual) under REMIT portal of ACER • Final customers who are parties to a contract for the supply of electricity or natural gas to a single consumption unit with a technical capability to consume 600 GWh/year or more, are obliged to notify their counterparties if the consumption unit in question is technically capable to consume 600 GWh/year or more. FOR INFO: DATA PROVIDED BY FLUXYS BELGIUM TO ACER WITH RESPECT TO CONCERNED END USERS “Fundamental data” End user -related information • Day-ahead & final nominations • Provisional allocations Following working day Transportation (primary capacity) Capacity contracts (auctions (incl. premium) & FCFS) Reminder Fluxys BE sent a letter to the end users with regards to REMIT on 12.02.2016 asking end users if they are concerned by the reporting obligations (On a total amount of 227 active sites: 137 answers of wich 63=Yes; 74=No; 90=no answer considered=No) REGISTRATION PROCESS How? Registration as Market Participant required: • with the National Regulatory Authority (NRA) in the Member State in which the end user is established or resident or, if they are not established or resident in the EU, in a Member State in which the end user are active. • A market participant shall register only with one NRA (In Belgium, CREG www.creg.be) • NRA’s check the completeness of the information provided by the market participant and communicate it to ACER Data to be communicated via ARIS “Agency’s REMIT information system” https://www.acer-remit.eu/dci/home • detailled information (i.e. XML schema to be found on REMIT portal of ACER) • MoP (Manuel of procedures on data reporting) ENERGY IDENTIFICATION CODE (EIC) How? • EIC? • Energy identification code permits the identification of a party or of an infrastructure within the EU energy market • Relevant kind of EIC for the end users: • There are different kind of EIC (V, W, X, Y, Z) • 3rd character is a “Z”: “Metering” EIC used by Fluxys BE to report data to ACER with regard to one concerned infrastructure (e.g. end user). “Z” EIC used by Fluxys published on (http://www.fluxys.com/belgium/en/TargetGroups/Connected%20Companies ). • 3rd character is a “X” : “Market participant” EIC used by the end user to report data regarding to its supply contract to ACER. • EIC are delivered by the national local issuing officer or by ENTSOG (for objects with international significance). AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 82 ARGB - KVBG Depuis 1877 83 HISTORIQUE • 1877 : fondation de l’Association des Gaziers Belges (AGB) • 1947: fondation de FIGAZ (Fédération de l’Industrie du Gaz). ARGB = département technique de FIGAZ • 1960: fondation de la Collectivité du Gaz (association des fabricants d’appareils gaz). Gérée par l’ARGB • 2005: fondation de Synergrid (fusion FPE et FIGAZ). L’ARGB devient une asbl indépendante • 2015: Dissolution de la Collectivité du Gaz. Les fabricants deviennent membres de l’ARGB 84 QUI EST L’ARGB ? • L’ARGB est l’abréviation de l’Association Royale des Gaziers Belges − Sa mission est de promouvoir la pénétration du gaz sur le marché des combustibles. Assurez la sécurité des installations intérieures de gaz et d’autres installations gaz. Promouvoir leur efficacité énergétique et leur caractère écologique. Tant pour des applications gazières sous forme gazeuse que liquide. 85 QUE FAIT L’ARGB AUJOURD’HUI ? − Veiller à un fonctionnement sûr et adéquat des installations et des appareils au gaz; − Positionner stratégiquement le gaz naturel en tant que source d’énergie sûre, fiable, avantageuse et écologique vers : » Grand public » Entreprises » Autorités et institutions − Défendre les intérêts des membres auprès des autorités et des institutions; − Se positionner comme le centre d’expertise belge pour le gaz naturel 86 QUE FAIT L’ARGB AUJOURD’HUI ? ARGB Gaznaturel.be Cerga.be NGVA.be Labo 87 QUE FAIT L’ARGB AUJOURD’HUI ? Centre d’excellence pour tous les aspects en aval du compteur de gaz du client Gaznaturel.be Promotion du gaz naturel auprès des clients + lobbying Cerga.be NGVA.be Labo Certification pour l’installateur de gaz naturel Développement de la mobilité gaz naturel Marquage CE pour les appareils gaz naturel et autres 88 GAZNATUREL.BE Aardgas.be Gaznaturel.be 89 CERGA Cerga.be 90 NGVA.BE NGVA.be 91 LABO Labo 92 L’ARGB EN PRATIQUE 93 ARGB ATI • Développement d’un GT industrie −Experts gaz de l’ARGB −Compétences en combustion −Qualité du gaz −Support aux installateurs industriels 94 CONVERSION LOW TO HIGH RÔLE DE L’ARGB Campagne et outils (site web) de communication ciblés Système d’aide ou remplacement d’appareils vétustes et non-compatibles Développement méthodologie en concertation avec les acteurs 5 AXES Mise sur pied d’un centre de formation accélérée pour les installateurs afin de disposer du manpower compétent Support technique (helpdesk) pour les installateurs / constructeurs pendant la phase active de la migration 95 GASDAY 2016 • Organisation d’un congrès annuel du gaz naturel • “Vous êtes prêt pour demain” • Membres ARGB, politiques, industrie, mobilité, fabricants, monde académique, fournisseurs, … 96 INNOVATIONS • Robur K18 − Pompe à chaleur à absorption au gaz − 169% de rendement • Boostheat − Chaudière à condensation avec PAC et compresseur thermique − 190% de rendement • Sime …. − Chaudière à condensation + PAC en 1 unité. − 134% de rendement 97 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 98 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 99 WHAT’S NEW AT METERING Quentin Vroye 100 1) PROCÉDURES OPÉRATIONNELLES Introduction • La relation entre Fluxys et les utilisateurs finaux raccordés au réseau de transport est régie par le « Contrat Standard de Raccordement ». • Les « Procédures Opérationnelles » constituent l’annexe 1 du « Contrat Standard de Raccordement ». Elles décrivent les prescriptions techniques et d’exploitation que tous les utilisateurs finaux doivent respecter pour être raccordés au réseau de transport. • La version 2.33 (2012) des « Procédures Opérationnelles » est actuellement d’application. • Fluxys regarde actuellement certaines options afin : − de simplifier les procédures − De référer à la PED (Pressure Equipment Directive) − d’améliorer la qualité métrologique des installations 101 1) PROCÉDURES OPÉRATIONNELLES Modifications possibles (1/2) • Référence à la PED (Pressure Equipment Directive) − D’application immédiate pour les nouveaux projets et toute modification future des stations à dater de la prise d’effet de la nouvelle version des Procédures Opérationnelles − Les Procédures Opérationnelles actuelles restent d’application pour les projets démarrés avant la prise d’effet de la nouvelle version • Introduction de réétalonnages périodiques des compteurs − Etalonnage tous les 15 ans en l’absence de mise en série Etalonnage tous les 30 ans en présence d’une mise en série − Déjà d’application auprès des gestionnaires de réseau de distribution − D’application immédiate pour toutes les stations avec une période de mise en conformité de 5 ans à dater de la prise d’effet de la nouvelle version des Procédures Opérationnelles 102 1) PROCÉDURES OPÉRATIONNELLES Modifications possibles (2/2) • Introduction de la courbe de correction dans les flow computers − Concerne les compteurs étalonnés en pression càd lorsque la pression d’exploitation est supérieure ou égale à 4 bar effectif − Concerne les compteurs à turbine et les compteurs à ultrasons (les compteurs volumétrique ne sont pas concernés). − D’application immédiate pour les nouveaux projets et tout remplacement futur de flow computers à dater de la prise d’effet de la nouvelle version des Procédures Opérationnelles − Une période de mise en conformité est prévue jusqu’en 2030 pour les flow computer qui n’auraient pas encore été modifiés • Révision globale de la structure du document − Respect de la chronologie d’un projet de la phase d’étude jusqu’à la phase d’exploitation − Séparation des aspects commerciaux, conceptions et métrologiques 103 1) PROCÉDURES OPÉRATIONNELLES Next steps 1. Consultation informelle avec nos clients finaux et de Febeliec 2. S’il est décidé de modifier les procédures 1. Consultation officielle du marché 2. Soumission à la Creg pour approbation après traitement des remarques éventuelles 104 2) INDEXATION TOOL VIA EDP Counter Convertor Les index sont les meilleures références pour vérifier les volumes comptés: • Prend en compte les flux forward et reverse (contrairement aux impulsions) • Fonctionnent en cas de coupure de l’alimentation (contrairement aux impulsions) MAIS… ils ne sont très difficiles à lire à distance. 105 2) INDEXATION TOOL VIA EDP Les impulsions transmises et enregistrées doivent donc être régulièrement comparée avec les index affichés sur le compteur afin de vérifier l'exactitude des volumes facturés et de limiter les corrections rétroactives : • Eviter des enregistrements trop importants (double enregistrement si des débits forward et reverse sont apparus). • Eviter des enregistrements trop faibles (impulsions manquantes ou ratées suit à une coupure de courant). C’EST POURQUOI il est demandé aux Utilisateurs Finaux de lire et d’enregistrer manuellement les index (cfr. Procédures Opérationnelles, §4.4 Enregistrement d’Index) 106 2) INDEXATION TOOL VIA EDP Ajout d’un rôle supplémentaire dans l’interface “Update Rights” : + Metering Index Encoder 107 2) INDEXATION TOOL VIA EDP Une nouvelle interface est en cours de développement dans EDP afin de pouvoir introduire et consulter le index compteurs (les index enregistrés par Fluxys seront également visibles) 108 3) MEASUR-W • Remplacement de l’ensemble des Wattman installés en Belgique par des nouveaux Measur-W. • Permettent la conversion des débits bruts en énergie et la mise à disposition des données utilisées pour les allocations horaires et pour la facturation mensuelle. 109 3) MEASUR-W • Planning − Certification attendue en 2016 − Démarrage du roll-out attendu en 2017. • Rappel du modus operandi 110 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 111 PROTECTION CATHODIQUE Patrick Mooens 112 GÉNÉRAL: CONTEXTE DU CONTRAT STANDARD DE RACCORDEMENT Le Point de Raccordement détermine la limite de responsabilité entre l’infrastructure de Fluxys et les installations sous gestion du Client Final. Les obligations respectives sont reprises dans le Ch.3 du Contrat Standard de Raccordement, nous nous référons spécifiquement aux articles suivants : − Obligations du Client Final en termes d’exploitation et entretien, voir § 3.2.4 − Obligations du Gestionnaire en termes d’exploitation et entretien, voir § 3.3.1 La Protection Cathodique représente une situation spécifique dans ce cadre vu la possibilité d’une influence réciproque, nous identifions 2 situations en fonction de la présence d’un Joint Isolant au Point de Raccordement 113 SITUATION 1 : PRÉSENCE D’UN JOINT ISOLANT AU POINT DE RACCORDEMENT En principe il n’y a pas d’interaction entre les systèmes de Protection Cathodique de Fluxys et du Client Final Fluxys et le Client Final disposent chacun de leur propre système de Protection Cathodique Remarque: vérifier qu’il n’y ait pas de pontage électrique du joint isolant au Point de Raccordement. Le cas échéant, cette connexion devrait être ouverte afin d’éviter des influences réciproques sur le fonctionnement des systèmes de la PC 114 SITUATION 2 : PAS DE JOINT ISOLANT PRÉSENT AU POINT DE RACCORDEMENT INFLUENCE RECIPROQUE • Le système PC de FLX influence la partie HP du Client Final et vice versa • Dans certains cas il existe des connexions électriques entre la conduite HP du Client Final et ces installations BP en aval augmentant l’influence réciproque des systèmes PC Limiter l’impact des influences réciproques de la PC aux structures directement connectées (p.e. changement du réseau FLX, mise à la terre) Il convient d’ouvrir les connexions électriques entre la partie HP et les installations BP du Client Final en aval Cela pourrait impliquer pour le Client Final le placement de sa propre installation PC 115 SITUATION 2 : PAS DE JOINT ISOLANT PRÉSENT AU POINT DE RACCORDEMENT Mesures des potentiels PC En ligne avec les articles concernés du Contrat Standard de Raccordement, c.à.d. : • Fluxys exécute les mesures PC sur ses infrastructures jusqu’au Point de Raccordement • Le Client Final mesure les potentiels PC sur l’infrastructure sous sa gestion à partir du Point de Raccordement • Les parties se concertent en cas de particularités Remarques : actuellement FLX réalise un projet pour la mesure automatique des potentiels PC avec télétransmission des mesures Contrôle 24h/24h du fonctionnement du système Protection Cathodique Réduction des mesures PC sur le terrain 116 QUELLES SONT LES PROCHAINES ÉTAPES? • Fluxys prendra contact avec les Clients Finaux afin de parcourir la situation locale et de se concerter sur les étapes ultérieures • En cas de nécessité / à la demande du Client Final, une réunion spécifique sera organisée pour cette concertation • Déterminer de commun accord les éventuelles actions qui sont nécessaires • Rédaction d’une lettre qui reprend les accords concernant la Protection Cathodique, en ligne avec les articles concernés du Contrat Standard de Raccordement • Ouvrir les connexions électriques chez le Client Final entre la partie HP et les installations BP en aval (éventuellement après mise en service d’une installation PC par le Client Final) 117 EVOLUTION POSSIBLE DES POTENTIELS PC • FLUXYS entreprend actuellement un projet afin d’affiner le suivi des potentiels de Protection Cathodique sur son réseau • L’influence du système Protection Cathodique FLX sur les installations du Client Final pourrait évoluer • FLX conseille aux Clients Finaux de contrôler les potentiels PC sur ses installations, infrastructures influencées par le système PC FLX inclus • Dans ce cadre il existe la nécessité d’ouvrir les connexions électriques entre la partie HP et les installations BP du Client Final en aval, afin de minimiser les influences réciproques 118 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 119 E- Allocation Agreement Ludo Hanot 120 1. Historique • Après la libéralisation du marché (2001) et avec l’apparition de plusieurs acteurs sur le marché belge: Nécessité d’allouer de façon nominative le/les shipper(s) à chaque client final Création de l’allocation agreement 121 2. L’Allocation Agreement dans sa forme la plus simple Identification du consommateur final Période de validité Réprésentation schématique des lignes de mesures Clef de répartition 122 Accord des parties concernées 3. Workflow AA Fluxys Belgium Handle Request GRID USER END USER Send Service Request Check and prepare AA in 3 originals Send AA (3 originals) to Grid User Sign AA (3 originals) Send AA (3 originals) to FLX Belgium Send AA (3 originals) to End User Sign AA (3 originals) Sign AA (3 originals) Send AA (3 originals) to FLX Belgium Send 1 original AA back to all parties 123 4. L’AA avec multiples parties • Avec le temps, de plus en plus d’AAs avec plus de 3 parties des étapes administratives supplémentaires en plus du workflow normal Fluxys Belgium GRID USER(S) END USER(S) Sign AA and send it back by e-mail to FLX Belgium before the start of the service Sign AA and send it back by e-mail to FLX Belgium before the start of the service Check Allocation Rule with End User(s) Send AA by e-mail for signature before the start of the service • Conclusion: nécessité de simplifier le workflow administratif E-Allocation Agreement via EDP 124 5. E – allocation agreement via EDP • Le 26/05/2016, 201 sites ont accès à EDP (Electronic Data Platform) • E-allocation agreement possible depuis 01/06/2015 • Le 26/05/2016,193 sites ont un AA Validator sur EDP = 85% des sites raccordés • Le 26/05/2016,16 sites ont demandés un AA sur papier 125 5. Workflow via EDP Fluxys Belgium Handle Request GRID USER END USER Send Service Request Check and prepare AA Through EBS, send e-mail: link to EDP for approval of AA Before the start date of the Service On EDP, approve AA and receive confirmation by e-mail of its approval AA: Allocation Agreement EBS : Electronic Booking System EDP : Electronic Data Platform 126 Before the start date of the Service On EDP, approve AA and receive confirmation by e-mail of its approval 6. Traiter l’ E-Allocation Agreement 127 6. Traiter l’ E-Allocation Agreement 128 6. Traiter l’ E-Allocation Agreement 129 7. E-AA approved ou rejected Fluxys Belgium END USER GRID USER Send Service Request Handle Request Check and prepare AA Through EBS, send e-mail: link to EDP for approval of AA Before the start date of the Service On EDP, approve AA and receive confirmation by e-mail of its approval Before the start date of the Service On EDP, approve AA and receive confirmation by e-mail of its approval Allocation Agreement has been approved by all involved parties no further action, no paper anymore can be consulted and downloaded on EDP OR Reject done by one of the parties (reason is mandatory) Immediately notified, will take the necessary actions and reprocess the AA EBS : Electronic Booking System 130 Each involved party is automatically informed by e-mail of this reject 8. Comment accéder à l’E-AA? • Comment accéder à l’E-Allocation Agreement? Vous devez signer le contrat EDP pour avoir accès à cette application Votre SPOC doit créer un (ou plusieurs) AA Validator(s) dans EDP Cette personne sera responsable de la gestion de l’Allocation Agreement pour votre société Vous devez compléter une adresse e-mail générale dans le Business Party Association Info (département ou équipe, différente d’une adresse personnelle) Au cas où l’AA Validator n’a pas accès à son e-mail, vous restez toujours au courant de la publication d’un Allocation Agreement Pour toute information : [email protected] • Fallback dans le cas où une des parties concernées ne souhaite pas utiliser l’E- Allocation Agreement − Environ 27 clients raccordés n’ont actuellement pas accès à EDP − Dans le cas ou EDP n’est pas utilisé, le processus sur papier reste d’application − Un Allocation Agreement signé sur papier ne sera pas publié sur EDP 131 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 132 CHARMGasdetection: CH4 Airborne Remote Monitoring Ivan Brysens 133 Détection gaz • L’obligation légale d’effectuer annuellement des détections de gaz le long de la conduite. AR 11 mars 1966 + 24 janvier 1991 • 16.000 points de détection de gaz le long de 4.100 km de conduite • Les mesures de gaz effectuées dans le passé pendant la patrouille en véhicule et pendant la patrouille annuelle à pied avec un dispositif de détection de gaz • Depuis 2013 détection de gaz via CHARM 134 Principe de CHARM®: LIDAR (Light Detection And Ranging) • Des impulsions laser sont envoyées au sol depuis un hélicoptère • Le signal se propage dans toutes les directions • Une partie est renvoyée à l’hélicoptère et est analysée 135 Principe de CHARM®: LIDAR (Light Detection And Ranging) Laser-Light-Absorption at CH4-Molecules lon loff (measurement wave- (reference length) is absorbed wavelength) is not by methane absorbed by methane Both pulses are scattered back from the same spot (ø 1 m) of the ground surface. If there is a difference in back scatter intensity it will be due to methane. 136 Principe de CHARM®: LIDAR (Light Detection And Ranging) 137 Principe de CHARM®: LIDAR (Light Detection And Ranging) 138 Principe de CHARM®: LIDAR (Light Detection And Ranging) 139 CHARM – données techniques 140 Helicopter: Flight speed: Altitude: Leak rate: Wind speed.: Leak diameter: Capacity: MBB Bo 105 Super 5 50 – 90 km/h 80 – 120 meter 150 l/h – 100 l/h – 20 l/h 5 m/s – 3,5 m/s – 2,0 m/s ø 0.04 mm at 80 bar up to 350 km per day Un rapport par CHARM 141 Lien vers Google Earth via KMZ-file 142 CHARM inspection sur le terrain 1. Mettre en marche le détecteur de gaz en dehors de la zone contenant une possible concentration de gaz (mettre à zéro l’appareil de mesure – concentration CH4 normale 2 – 3 ppm) 2. Commencer les mesures au-dessus de la conduite 3. Inspection intensive à proximité de la concentration de gaz présumée (contrôle en configuration matrice) 4. Contrôle continu des deux côtés de la conduite 5. Aucune confirmation – la source de méthane n’est pas liée à la conduite 6. Tenir compte du vent pendant la détection CHARM (voir rapport) – inspection visuelle contre le vent afin de détecter des sources potentielles 7. Mesures de gaz en retournant vers le 143 véhicule Futur - CHARM® 2 (2016) • CHARM®: new Laser 100 Hz 1000 Hz • 33 kn 99 kn vols plus rapides • 7 m 11 m scan corridor width scanning plus large • > 33 % > 66 % coverage meilleure couverture laser spot • further improvement of detection reliability despite increased flight speed 144 3 Min. at 30 kn 56 km/h 15 m/s 1,5 Sec. at 58 kn 108 km/h 30 m/s 145 Futur - CHARM® 2 (2016) CHARM® 2 - nouvel hélicoptère – MD 900 146 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 147 QUALITÉ GAZ VERS UNE HARMONISATION DES SPÉCIFICATIONS EN EUROPE 148 Quentin Degroote QUALITE GAZ H : VERS UNE HARMONISATION EN EUROPE • Easee-gas publie son premier CBP (Common Business Practices) relatif à la qualité gaz H en 2003. Fluxys joue un rôle moteur dans l’élaboration de ce CBP • Volonté de la Commission Européenne (Mandat M400 - 2007) de définir des spécifications pour le gaz naturel à haut pouvoir calorifique : − Base = CBP Easee-gas v2 (2005) − Aussi larges que possible − BUT : » Assurer la libre circulation du gaz en Europe et ainsi promouvoir la compétition » Diversifier les sources et donc augmenter la sécurité d’approvisionnement − POINTS D’ATTENTION : » Coûts raisonnables » Maintien de la sécurité » Respect des normes relatives à l’efficacité et à l’environnement Norme Européenne publiée en décembre 2015 : EN16726:2015 “Gas Infrastructure – Quality of gas – Group H” 149 QUALITÉ GAZ H : QU’EST CE QUI CHANGE POUR VOUS? • Une norme ne devient contraignante que lorsqu’elle est référée dans une loi, un contrat ou une décision de justice. Pas encore le cas aujourd’hui pour EN 16726 Pas de changement à ce stade dans le Connection Agreement • Volonté de la Commission Européenne de rendre la norme contraignante au moyen d’un amendement du Code de Réseau Interopérabilité (EU/2015/713) applicable aux TSOs Processus de révision formellement démarré par ENTSOG en avril 2016 Finalisation pas prévue avant fin 2018 Fluxys Belgium modifiera ses spécifications en conséquence Modification du Connection Agreement : Diminution de la spécification STOT à 20 mg/m³(n) 150 QUALITÉ GAZ H : PROCHAINES ÉTAPES • Suite du processus de normalisation CEN de la qualité gaz pour le biogaz (PrEN 16723-1) et le CNG (PrEN 16723-2) • Révision de la norme CEN EN16726 Identification et ajout des spécifications manquantes (études complémentaires : Pilot Project II sous la direction du SFG Infrastructure du CEN) : - Wobbe Index (range et variations) - H2 - …?... 151 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 152 SMALL SCALE LNG FOR REMOTE INDUSTRY Kwinten Standaert 153 1. LNG as a fuel 2. Drivers for the small-scale LNG market 3. Current market size and outlook 4. Fluxys’ small-scale LNG activity 154 LNG = Liquefied Natural Gas • Liquefied by cooling the natural gas to a temperature of -162° C at atmospheric pressure. • 600 less volume than natural gas compact fuel, competitive with diesel extremely clean, low-carbon fuel 155 WHY LNG? HIGH ENERGY DENSITY PER KG AND PER LITER ≈ DIESEL, LPG … kWh/Lite r Diesel = Marine Gas Oil 10 Gasoline MORE ENERGY PER LITER 9 8 LPG Butane LPG Propane 7 LNG 6 5 Methanol 4 3 CNG 2 Liquid Hydrogen Zinc-Air Battery Hydrogen Gas (700 bar) 1 Lithium Ion Battery 0 [Wikipedia – Energy Density] 156 10 Natural Gas 20 Hydrogen Gas 30 MORE ENERGY PER KG 40 50 kWh/kg 1. LNG as a fuel 2. Drivers for the small-scale LNG market 3. Current market size and outlook 4. Fluxys’ small-scale LNG activity 157 LNG IS AVAILABLE: 240 360 MILLION TON /Y IN 2020 United States MTPA 500 Australia +50% increase in LNG supply by 2020 Qatar Malaysia 450 Nigeria Indonesia 400 Trinidad 350 Algeria USA Russia 300 Oman Yemen Australia 250 Brunei United Arab Emirates 200 Peru Qatar Equatorial Guinea 150 Norway Papua New Guinea 100 Angola 50 Libya Egypt 0 2000 2005 2010 [IHS – exports operational terminals & terminals under construction] 158 2015 2020 2025 2030 GLOBAL CRUDE OIL PRICE VS. LOCAL NATURAL GAS PRICE $ /MMBTU (*) Brent Oil Japan Belgium US Natural Gas price 25 20 Crude oil at $100/barrel = 17.3 $/MMBTU = 15 Fukushima – Japan 10 5 (*) 5 $/MMBTU ≈ 15 EUR/MWh 159 1/01/2015 2015 1/01/2014 2014 1/01/2013 2013 1/01/2012 2012 1/01/2011 2011 1/01/2010 2010 2009 Shale gas - USA 0 1/01/2009 1/01/2016 LNG AS A FUEL BETTER FOR THE ENVIRONMENT HEAVY FUEL OIL 3.5% Sulphur Envisat, ESA Attack the invisible killer: premature deaths from air pollution estimated at 420,000 for the year 2010 (EC) MARINE GAS OIL 0.1% Sulphur LNG • 0% Sulphur • Particulate matter: negligible • Up to 90% less NOx • Up to 25% less CO2 [European Commission SWD 2013 4] 160 WORLD-WIDE REGULATION FAVOURS LNG Sulphur Emission Control Areas Existing SECA area Potential future SECA area Alternative Fuels Directive adopted by the EU Parliament (2014) Max % sulphur in ship fuel 5 CNG refuelling infrastructure every 150 km by 2020 4 LNG refuelling infrastructure for trucks every 400 km and for ships in 106 TEN-T ports by 2025 2 161 Global norm SECA norm 3 1 0 2008 2010 2012 2014 2016 2018 2020 2022 2024 1. LNG as a fuel 2. Drivers for the small-scale LNG market 3. Current market size and outlook 4. Fluxys’ small-scale LNG activity 162 LNG AS A FUEL FOR INDUSTRY LNG TRUCKS AS A PIPELINE IN 2015: 1.5 MTPA 0.5 MTPA LNG is delivered to industry via small LNG carriers and trucks 0.8 MTPA 0.2 MTPA LNG is delivered via LNG trucks to remote gas grids, which supply industry, power plants and households is delivered to industry via trucks 163 GLE + Fluxys LNG AS A FUEL FOR SHIPS IN 2015: 0.2 MTPA Number of ships 75 LNG fuelled ships in operation (87% in Europe) + 84 on order Sea-going ships propelled by LNG (excluding LNG carriers) [DNV-GL 1/2016] 164 LNG AS A FUEL FOR TRUCKS IN 2015: 0.02 MTPA (EST.) Finland 1 truck Sweden 69 trucks 1509 LNG fuelled trucks + 46 buses in operation Netherlands 387 UK trucks 621 trucks Belgium 33 trucks Russia 1 truck Poland 46 buses 11 trucks Switzerland 1 truck France 10 trucks Italy 56 trucks Portugal 11 trucks [NGVA Europe Jan 2015] 165 Spain 306 trucks Turkey 2 trucks LARGE POTENTIAL SAVINGS BY SWITCHING TO LNG 430 mtpa market Heavy Fuel Oil 53 mtpa LPG 27 mtpa Small-scale LNG: 1.7 mtpa Diesel ≈ gasoil 270 mtpa Ships Gasoline 80 mtpa Industry Trucks, vans, cars 200 mtpa Cars Ships 7 mtpa Heating oil 63 mtpa • Industry: 1.5 mtpa • Ships: 0.2 mtpa • Trucks: 0.02 mtpa Airplanes Jet-kerosene 54 mtpa [Fuels Europe.eu] 166 Petrochemical Chem feed naphta 49 mtpa other 50 mtpa Refinery losses 29 mtpa 1. LNG as a fuel 2. Drivers for the small-scale LNG market 3. Current market size and outlook 4. Fluxys’ small-scale LNG activity 167 DOWNSTREAM SMALL SCALE LNG SUPPLY FROM ZEEBRUGGE: A CLOSER LOOK Bunker vessel up to 7 000 m³ LNG Loading of bunker barges and feeder ships Fluxys LNG terminal 560 000 m³ LNG Feeder ship 15 000 m³ LNG Bunker vessel Intermediate storage up to 7 000 m³ LNG End user 1 to 100 000 m³ LNG/y Loading of LNG trailers LNG trailer 45 m³ LNG 30 m³ LNG/y Fuel for industry 1 000 to 15 000 m³ LNG/y 168 DOWNSTREAM SMALL SCALE LNG SUPPLY FROM ZEEBRUGGE: A CLOSER LOOK Bunker vessel up to 7 000 m³ LNG Loading of bunker barges and feeder ships Fluxys LNG terminal 560 000 m³ LNG Feeder ship 15 000 m³ LNG Bunker vessel Intermediate storage up to 7 000 m³ LNG End user 1 to 100 000 m³ LNG/y Loading of LNG trailers LNG trailer 45 m³ LNG 30 m³ LNG/y Fuel for industry 1 000 to 15 000 m³ LNG/y 169 LNG AS A FUEL FOR INDUSTRY, SHIPS AND TRUCKS Loading of LNG trailers 10% Fluxys LNG terminal LNG trailer 50% 40% Small ships propelled on LNG Truck refuelling station - e.g. Fluxys in Veurne Fuel for industry 170 LNG TRUCK LOADING 2010 2011 2012 2013 2014 2015 … 19 active truck loading companies Capacity of 4 000 loadings/year 24/7, online day-ahead scheduling > Industrial sites without pipe gas >50% > LNG refuelling stations <40% > LNG as fuel for shipping <10% Destinations: Belgium, UK, France, Germany, the Netherlands, Poland, Switzerland, Sweden, Norway, Italy 4000 3000 LNG Trucks Loaded in Zeebrugge + FR + NL 2000 1000 0 2010 2011 2012 2013 2014 2015 171 FIRST LNG REFUELLING STATION OWNED AND BUILT BY FLUXYS IN BELGIUM PARTNERSHIP WITH HAULAGE COMPANY MATTHEEUWS 172 0.04 – 0.08 EUR/KM FUEL SAVINGS TO INVEST IN DUAL-FUEL TRACTOR-UNITS Source: Mattheeuws 173 LNG FOR REMOTE INDUSTRY IN BELGIUM FIRST LNG FOR INDUSTRY IN BELGIUM BY PRIMA LNG 20.000 MWH/Y FOR HEATING CEREALS OF BELOURTHE INDUSTRIAL CONSUMPTION: 0.5 – 10 MIO M³(N) /Y 5 – 100 GWH /Y 20 – 360 LNG TRUCKS /Y 174 Bunker vessel up to 7 000 m³ LNG Loading of bunker barges and feeder ships Fluxys LNG terminal 560 000 m³ LNG Feeder ship 15 000 m³ LNG Bunker vessel Intermediate storage up to 7 000 m³ LNG End user 1 to 100 000 m³ LNG/y Loading of LNG trailers LNG trailer 45 m³ LNG 30 m³ LNG/y Fuel for industry 1 000 to 15 000 m³ LNG/y 175 2ND JETTY ABLE TO LOAD SMALL LNG BUNKER BARGES IN ZEEBRUGGE Second jetty under construction • Reception of LNG carriers with capacity as small as 2 000 m³ LNG • Unloading and loading two ships simultaneously • Ship-jetty-ship transfers 176 LNG BUNKERING VESSEL WITH HOME PORT ZEEBRUGGE Engie, NYK, Mitsubishi and Fluxys are building a new LNG bunkering vessel: • 5 100 m³ LNG • Commissioning 2016 • Bunkers for UECC United European Car Carriers 2 dual-fuelled ships 177 Bunker vessel up to 7 000 m³ LNG Loading of bunker barges and feeder ships Fluxys LNG terminal 560 000 m³ LNG Feeder ship 15 000 m³ LNG Bunker vessel Intermediate storage up to 7 000 m³ LNG End user 1 to 100 000 m³ LNG/y Loading of LNG trailers LNG trailer 45 m³ LNG 30 m³ LNG/y Fuel for industry 1 000 to 15 000 m³ LNG/y 178 LOADING OF FEEDER SHIPS: 15 600 M³ LNG 11/2014: agreement signed between Eni and Skangas to load 2 small scale LNG ships per month in 2015 and 2016 179 Bunker vessel up to 7 000 m³ LNG Loading of bunker barges and feeder ships Fluxys LNG terminal 560 000 m³ LNG Feeder ship 15 000 m³ LNG Bunker vessel Intermediate storage up to 7 000 m³ LNG End user 1 to 100 000 m³ LNG/y Loading of LNG trailers LNG trailer 45 m³ LNG 30 m³ LNG/y Fuel for industry 1 000 to 15 000 m³ LNG/y 180 STRONG POTENTIAL FOR ENLARGING REGIONAL SCOPE SWEDEGAS ZEEBRUGGE 181 Multiple intermediate LNG storages constructed + planned in North and Baltic Sea CONCLUSIONS • LNG as a fuel for industry, ships and trucks − A strong demand to reduce emissions as well as costs − Challenge: developing downstream LNG infrastructure • Fluxys LNG terminal in Zeebrugge − Optimum destination flexibility in terms of LNG regasification and loading ships and trucks 182 AGENDA 09h00: Accueil 09h30: Introduction - Marché de l’énergie en bref Arno Büx 10h30: Focus sur la Belgique Huberte Bettonville 11h00: L/H + évolution gaz-L Hany Aouad 11h15: Plan d’urgence Denis Bawin 11h30: Remit Denis Bawin 11h45 : ARGB Juan Vazquez 12h15: Lunch 13h45 : Film – “Fluxys Our World” 14h00: What’s new at Metering Quentin Vroye 14h15: Protection cathodique Patrick Mooens 14h30: E-Allocation agreement Ludo Hanot 14h40: Détection gaz – CHARM Ivan Brysens 15h00: CEN qualité gaz Quentin Degroote 15h15: Pause 15h45: Small scale LNG Kwinten Standaert 16h00: Perspectives CNG & biométhane Vincent Malisoux 16h15: Q&A Huberte Bettonville 16h30: Drink 183 PERSPECTIVES CNG & BIOMÉTHANE Vincent Malisoux 184 1. LE GAZ NATUREL COMPRIME COMME CARBURANT POUR LE TRANSPORT 2. BIOGAZ / BIOMETHANE 185 ACTIONS SECTEUR GAZIER LORS DES SALONS DE L’AUTO 2014, 2015 & 2016 • Lors de la commande d’un véhicule au gaz naturel: prime du secteur gazier de 2.000/1.000 euros pour les particuliers et les entreprises • 2014: 700+ véhicules commandés en 2,5 mois • 2015: 350+ véhicules commandés • 2016: 650+ véhicules commandés en 2,5 mois 186 DES ENCOURAGEMENTS RÉGIONAUX POUR UNE MOBILITÉ PLUS VERTE Les Gouvernements régionaux flamand et wallon se sont tous deux engagés en faveur d'une mobilité plus verte: o Les propriétaires flamands seront exonérés de la taxe de mise en circulation ainsi que de la taxe de circulation annuelle de leur véhicule GNC Economie de +/- 1.200 euros en 4 ans pour chaque détenteur d'un véhicule GNC o Le ministre flamande de la Mobilité souhaite mettre 100.000 véhicules « verts » en circulation d'ici 2020 (dont 40.000 au gaz naturel) + 300 stations CNG o Des actions visant à favoriser l'acquisition de véhicules GNC devraient également prochainement voir le jour en Wallonie Autres pistes/possibilités possibles: Conversion des flottes publiques Moins de taxes pour les stations de ravitaillement LNG & CNG Subsides pour les nouvelles stations de ravitaillement LNG & CNG Procédures d’obtention de permis plus rapides/courtes Support pour l’utilisation de biométhane dans le transport 187 EVOLUTION DU MARCHE DES VEHICULES GNC 2013-2016 * * 3.500 véhicules GNC = < 0.1% de part de marché (Belgique) 188 STATIONS DE RAVITAILLEMENT GNC EXISTANTES/EN PROJET Stations de ravitaillement existantes (47) Etude de faisabilité - projets (42) 189 NB: 3.386 stations de ravitaillement en Belgique => GNC ~1,4% de part de marché 1. LE GAZ NATUREL COMPRIME COMME CARBURANT POUR LE TRANSPORT 2. BIOGAZ / BIOMETHANE 190 BIOGAZ: SITUATION EN EUROPE 191 ELECTRICITE PRODUITE A PARTIR DE BIOGAZ EN COMPARAISON AVEC LA PRODUCTION TOTALE D’ELECTRICITE 192 PRODUCTION BIOGAZ VS. OBJECTIFS PRODUCTION BIOGAZ 2020 (NATIONAL RENEWABLE ENERGY ACTION PLAN) 193 DU BIOGAZ AU BIOMETHANE • Définition: Biométhane = biogaz épuré (CO2 et autres gaz traces éliminés) Qualités quasi similaires à celles du gaz naturel • Valorisation: 194 1. Utilisations domestiques : chaudière au gaz (pour l’eau chaude et le chauffage) 2. Cuisinières au gaz, poêles au gaz, inserts de cheminée au gaz, etc. 3. Utilisations industrielles : production d’eau chaude, de vapeur, etc. 4. Production d’électricité à l’aide d’un moteur (éventuellement de cogénération) ou d’une turbine gaz (centrales TGV), etc. 5. Alimenter des pompes GNC BIOMETHANE: SITUATION EN EUROPE (1/3) • Plus de 370 usines de conversion de biométhane (2015) • Injection dans les réseaux: Autriche, Suisse, Allemagne, Luxembourg, France, Pays-Bas, … • Utilisation comme carburant pour le transport : Autriche, Suisse, Allemagne, Suède, Italie, … • Développements technologiques: - Amélioration de l'efficacité des processus, - Réduction des coûts d'exploitation, - Concentration plus élevée de CH4, … 195 BIOMETHANE: SITUATION EN EUROPE (2/3) • 2015: Capacité horaire totale de production 200.000 m³(n)/h Soit 1,8 milliards m³(n) de biométhane produits annuellement en Europe • Aucune unité de biométhanisation en Belgique: les autorités fédérales/régionales travaillent activement sur un mécanisme de soutien durable permettant le développement de tels projet sur le long terme 196 BIOMETHANE: SITUATION EN EUROPE (3/3) 197