“TULLOW GHANA - DEEPWATER EXTENDED REACH DRILLING

Transcription

“TULLOW GHANA - DEEPWATER EXTENDED REACH DRILLING
Tél. : 33 (0)1 47 17 67 32
“TULLOW GHANA DEEPWATER EXTENDED REACH
DRILLING EXPERIENCE”
Clar Forage - Puits
Président : David RICHARD
Secrétariat : [email protected]
SPE-Section France
Président : Jean-Pierre DEFLANDRE
Secrétariat SPE-France : Isabelle LE NIR
http://france.spe.org/
JEUDI 28 MARS 2013 de 16h30 à 18h30
Salle de Conférence - 1 Rue Becquerel - 92140 Clamart *
Conférencier : Fraser LAWSON (DL), Tullow Ghana Ltd
- Voir résumé 
* Moyens d'accès :
Métro
:
Voiture :
Ligne 13 station Châtillon-Montrouge. Puis prendre le bus 295
Prendre la D906 direction Montrouge puis Versailles / Clamart
A l’issue de cette conférence, un pot amical sera offert aux participants par Schlumberger
Prière de se munir de cette convocation pour faciliter l’accès à la Salle de Conférence
En raison des mesures de sécurité en vigueur dans les sociétés accueillant nos conférences,
L’INSCRIPTION EST OBLIGATOIRE
: directement sur notre site
Tél. : 33 (0)1 47 17 67 32
“TULLOW GHANA - DEEPWATER EXTENDED REACH DRILLING EXPERIENCE”
by FRASER LAWSON (DL) [Tullow Ghana Ltd]
Photo © Tullow Oil LTD
ABSTRACT
Extended Reach Drilling (ERD) already carries a well understood list of technical challenges that if not adequately
addressed can easily result in failure to complete the well. In a fast track deepwater development the complexities
and risk exposure for any operating company are further increased. Many of the deepwater ERD challenges
encountered by Tullow Ghana Ltd are touched on in this presentation and three are discussed in some detail,
namely; hole cleaning, borehole stability and well bore surveying. The latter subject is also covered by the
presenter and others in a separate SPE paper. The presenter does not try to gloss over the difficulties
encountered during the execution phase but instead uses these as examples to demonstrate learning points and
highlight the importance of engineering to reduce risk and maximise the probability of success. The responsibility
carried by Engineers is therefore one of the key themes of this presentation and is a message the presenter felt
appropriate to stress to an attentive audience of new Engineers in the emerging oil province of Ghana. The
presentation finishes on a high note by demonstrating that despite the ERD operational difficulties encountered
the field was delivered on target with ‘best in class’ deepwater drilling performance.
SHORT BIO
Fraser Lawson has over 25 years of international well engineering experience
including various ERD and deepwater projects. He holds BSc (hons) and MSc degrees
in Civil and Petroleum Engineering and is a Chartered Engineer. He currently works as
the Well Engineering Supervisor for Tullow Ghana Ltd