The implementation of WFD in Romania

Transcription

The implementation of WFD in Romania
ROMANIA
M I N I S T R Y OF E N V I R O N M E N T
AND W A T E R M A N A G E M E N T
IMPLEMENTATION OF THE WATER
FRAMEWORK
DIRECTIVE 2000/60/EC IN
TRANSBOUNDARY RIVER BASINS
IN ROMANIA
Anemarie CIUREA
MEWM – Office Head
THE IMPLICATIONS OF THE IMPLEMENTATION OF
THE WATER FRAMEWORK DIRECTIVE IN ROMANIA
™ From legislative point of view;
™ From organizational point of view;
™ From scientifical point of view;
™ From technical point of view;
THE EUROPEAN WATER DIRECTIVES
TRANSPOSED INTO ROMANIAN LEGISLATION
Directives
Transposition into Romanian
legislation
The Directive 75/440/EEC on Surface Water for
Drinking Water Abstraction – GD 100/2002 (*)
The Bathing Water Directive 76/160/EEC
The Dangerous Substances Directive 76/464/EEC
(plus 7 daughter directives)(**)
The Groundwater Directive 80/68/EEC (*)
The Freshwater Fish Directive 78/659/EEC (*)
The Shellfish Water Directive 79/923/EEC (*)
The Directive on the Measurement of Surface
(Drinking) Water 79/869/EEC (*)
The Nitrates Directive 91/676/EEC
The Urban Waste Water Treatment Directive
91/271/EEC
The Drinking Water Directive 98/83/EEC
The Water Framework Directive 2000/60/EC
GD 100/2002
GD 459/2002
GD 351/2005
GD 351/2005
GD 202/2002
GD 201/2002
GD 100/2002
GD 964/2000
GD 352/2005
Law 311/2004
Law 107/1996 ammended
by Law 310/28.06.2004
* The provisions of these directives are included in the Water Framework Directive.
** The provisions of these directives are included in the Water Framework Directive, except Art. 6
Making concordance of plans
with neighbouring countries
The International Commission for the
Ministry of Environment
and Water Management
European Commission
Water Directors Committee
Protection of the Danube River
Interministerial Council of Waters
Expert Group on Water Management
of the European Union
Secretariat
Specialized institutions :
ICIM,Aquaproiect,INCDDD,ICPA,
ISPB, ICBBIOL,etc
National Administration
“Apele Romane”
MAFRD, MEC, MAI, MH
RBM Plan Division
RBA
RBA
RBA
Somes-Tisa
RBA
Crisuri
RBA
Mures
Banat
Jiu
Olt
RBA
Arges- Vedea
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
Basin
Committee
Basin
Committee
Mures
Basin
Committee
Banat
Basin
Committee
Jiu
Basin
Committee
Olt
Basin
Committee
Arges-Vedea
Basin Committee
Somes-Tisa
Crisuri
RBA
RBA
Buzau- Ialomi ta
RBM Plan
Bureau
Basin
Committee
Buzau-Ialomita
RBA
Siret
RBA
Prut
RBA.Dobro
gea Litoral
RBM Plan
Bureau
RBM Plan
Bureau
RBM Plan
Bureau
Basin
Committee
Siret
Basin
Committee
Prut
Basin
Committee
Dobrogea
Litoral
Organizational structure for the implementation of the Water Framework Directive in Romania
BASIN COMMITTEE
In each river basin there is a basin committee which is made
up of the main “actors” from the water management field : state, local
communities, water management units, representatives of industry and
agriculture, NGO`s.
2
1
1
3
1
1
2
3
1
Ministry of Environment
and
Water Management
Health Ministry
A prefect from the
river basin
2 City Mayors
1 Town Mayor
President of the
County Council
Office for the Protection
of the
Consumer
Natinal Administration
“Apele Romane”
Water users
N.G.O.
EXECUTIVE DIRECTOR
SECRETARIAT
PRESIDENT
BASIN COMMITTEE REPRESENTS THE INTERESTES OF ALL THE PEOPLE
THE IMPLICATIONS OF THE IMPLEMENTATION
OF THE WATER FRAMEWORK DIRECTIVE
IN ROMANIA
Q From scientifical point of view:
·the specialised institutions from the field of water
management have modified their activity plan in
order to perform research which is necessary for
the implementation of WFD ;
·a special attention is paid to the adapting of EU
guidelines to the specific conditions of Romania;
THE IMPLICATIONS OF THE IMPLEMENTATION
OF THE WATER FRAMEWORK DIRECTIVE IN ROMANIA
FROM SCIENTIFICAL POINT OF VIEW
Methodologies elaborated/adapted by National Administration
“Apele Romane” :
¾ the methodological guidelines for defining the abiotic typology of
streams;
¾ the methodological guidelines for the delineation of surface water
bodies-rivers and lakes;
¾ the methodological guidelines for the preliminary identification of
artificial and heavily modified water bodies- rivers and lakes;
¾ the methodological guidelines for the development of the
integrated water monitoring national system;
¾ the methodological guidelines for the identification of the pollution
point and diffuse sources and for the assessment of their impact
on surface water;
¾ etc.
THE IMPLICATIONS OF THE IMPLEMENTATION OF THE
WATER FRAMEWORK DIRECTIVE IN ROMANIA
FROM SCIENTIFICAL POINT OF VIEW
¾ the methodological guidelines for characterization the
groundwaters bodies;
¾ the methodological guidelines for the determination of
risk of failure to reach the environmental objectives for
groundwaters bodies;
¾ the methodological guidelines for the delineation of the
protected areas;
¾ the methodological guidelines for achievement the
economic analysis for water users and services;
¾ the methodological guidelines for public participation.
THE IMPLICATIONS OF THE IMPLEMENTATION OF
THE WATER FRAMEWORK DIRECTIVE
IN ROMANIA
Q
From technical point of view:
· GIS sofware –ARC/INFO and adequate hardware;
· observation, measurements, sampling devices
and lab equipment for performing analysis of
parameters provided by the WFD estimated at 17
mil. EURO;
· skilled and adequately-trained human resources;
THE IMPLEMENTATION OF THE WATER
FRAMEWORK DIRECTIVE IN ROMANIA
ƒ
The implementation of WFD in Romania :
·a continuous and greatly important activity;
· a step-by-step achievement;
·involving significant human and financial resources;
·requiring co-ordination of the all involved parts at
international, national and river basin level
ƒ Romania has committed to elaborate in line with the
provisions of the WFD, the River Basin Management Plan
according to the EC and ICPDR requirements and deadlines.
Submit interim report on
the implementation to the
EC (Art. 15)
Revised
overview of
significant water
issues
Update
Assess current
status, analyse
preliminary gaps
(Art. 5-8)
RBMP
Evaluate the first and
prepare the second
period.
Implement the
programme of
measures for
RBD
2004
2013
Set up
environmental
objectives (Art. 4)
Establish
monitoring
programmes
(Art. 8)
2015
2012
2006
Public
Participation
(Art. 14)
2009
Gap analysis
Develop River Basin
Management Plan
(RBMP) (Art.13-25,
App.VII)
Set up the programme
of measures for RDB
(Art. 11)
TIME TABLE FOR WORKING OUT RIVER BASIN MANAGEMENT PLAN
DEVELOPMENT OF THE DANUBE RBM PLAN
Danube Countries
• national tasks
• harmonise results with neighbours
• report on progress
ICPDR Secretariat
prepares Roof
RBM Plan
ICPDR
ensures basin-wide coordination
and harmonisation of RBM Plan
• UNDP/GEF Danube
Regional Project
• EC/ISPA Pilot river
basin projects
• Twinning projects
Danube Countries
• programme of measures
• harmonise measures with
neighbours
• National RBM Plan
Danube River Basin Management Plan
Roof RBM Plan
- Part A
National Plans (part B) and
Contributions for part A
Public information and
consultation process
THE STRATEGY OF THE IMPLEMENTATION OF THE
WFD IN THE DANUBE RIVER DISTRICT
EU Member States
States in the joining process to EU
UKRAINE
MOLDOVA
ROMÂNIA
BULGARIA
SERBIA - MONTENEGRO
BOSNIA - HERZEGOVINA
CROATIA
SLOVENIA
HUNGARY
SLOVAK REPUBLIC
CZECH REPUBLIC
AUSTRIA
GERMANY
Part B:
Level 2- National plan
Part A
The level 1 : The international “roof” of the Danube River Basin Management Plan
Non-accession countries
THE STAGE OF IMPLEMENTATION OF WATER
FRAMEWORK DIRECTIVE 2000/60/EU IN ROMANIA
Achieved
¾ Adapting/elaborating specifically methodologies by National Administration Apele
Romane
¾ Elaborating the Water Management Plans on 11 hydrographical units – Report 2004:
Water Directorates, water users, County Directorates of Agriculture, ROMSILVA
Branches, local and county authorities, Environmental Protection Agencies,
Administrations of Development Regions, National Institute of Statistics, Research
Institute for Pedology and Agrochemistry, National Institute of Research Development “Danube Delta”, National Institute of Marine Research- Development “
Grigore Antipa”, National Institute of Hydrology and Water Management and National
Institute of Research-Development for Environmental Protection.
¾ Harmonization of: typology and water bodies with Hungary, Serbia and Montenegro,
¾ Bulgaria and Moldova
¾ Elaborating Romanian Roof Report Part A - the Danube District Management Plans
On going
¾ Elaborating National Management Plan - Report 2004
¾ Establishing the reference conditions
¾ Establishing the limits of quality categories – intercalibration site
¾ Adapting the monitoring system
¾ Program of measures
PRELIMINARY GENERAL MEASURES PLAN FOR IMPLEMENTATION
OF WATER FRAME
WORK DIRECTIVE 2000/60/EC
SURFACE WATERS
¾ Measures to maintain the existing high and good status of all bodies of
surface water existing and future preservation of water resources quality),
in order to protect the human health and biodiversity, to control waste
discharges and the vulnerable areas
¾ Measures to restore all bodies of surface water and of all artificial and
heavily modified bodies of water with the aim of achieving good ecological
status
¾ Measures to reduce pollution from priority substances and ceasing or
phasing out emissions, discharges and losses of priority hazardous
substances
GROUNDWATERS
¾ Measures to prevent the deterioration of the status of all bodies of
groundwater
¾ Prohibition of direct discharges of pollutants into groundwater resources
¾ Measures to achieve good groundwater status
PROTECTED AREAS
¾ Measures to reaching the requested standards for protected areas
¾ Measures to enhance the safety of water use
THANK YOU
Thank
you
for
your
kind
attention
FOR YOUR KIND ATTENTION
FOR YOUR KIND ATTENTION !