Juliette Biesse - archi.re :: architectures à La Réunion

Transcription

Juliette Biesse - archi.re :: architectures à La Réunion
Juliette Biesse
Contactez moi! / Contact me!
[email protected]
+262 6 92 78 28 53
101D Rue du Père Laporte
97421 La Rivière Saint Louis
www.pinterest.com/juliettebiesse/
CV
CV
Juliette Biesse
Juliette Biesse
Architecte Diplômée d’Etat ayant deux ans et demi d’expérience en Angleterre à la recherche d’un poste d’architecte dans une agence
afin d’effectuer la formation HMONP pour l’année scolaire 2015/2016.
Part 2 Architect with two years and a half experience in the UK looking for a job in an architecture office in order to do the Part 3
training during the academic year 2015/2016.
Langues
Français : Langue maternelle
Anglais : Courant parlé et écrit
Allemand : Scolaire
Languages
French : Mother tongue
English : Fluent spoken and written
German : Intermediate
Compétences
Etude de faisabilité - Permis de construire - Réalisation de relevés de bâtis - Mises en relation
avec économistes, bureaux d’études, fournisseurs, sous-traitants et prestataires - Normes de
construction - Normes incendie - Normes de sécurité EPR - Normes accessibilité - Montage
d’un budget et suivi des dépenses - Dessins de construction et détails techniques - Appel
d’offre - Candidatures marchés publics - Normes environnementales - Code for Sustainable
homes - Lifetime homes - RTAA Dom - PERENE - Formation “Qualité environnementale du
projet architectural et urbain à la Réunion” CAUE Réunion
Skills
Feasibility study - Pre-planning and Planning Application - Existing survey - Liaise with
QS, engineers, suppliers, subcontractor and contractors - Building regulation - Fire regulation - Public building regulation - Cost plan - Tender and Construction drawings - Public
competitions - Code for sustainable homes - Lifetime homes - RTAA Dom - PERENE - “Environmental quality of the architectural and urban project in Reunion Island” Training
Course in CAUE Reunion
Expérience Professionnelle
Mars 2014 à Mai 2015 (15 mois) - Assistante Architecte
Fourthspace Ltd, Londres (UK)
Work Experience
March 2014 to May 2015 (15 months) - Architect Assistant (Part 2)
Fourthspace Ltd, London (UK)
Mars 2013 à Novembre 2013 (9 mois) - Assistante Architecte
Rodic Davidson Ltd, Londres (UK)
March 2013 to November 2013 (9 months) - Architect Assistant (Part 2)
Rodic Davidson Ltd, London (UK)
Octobre et Novembre 2012 (2 mois) - Architecte Stagiaire
Altitude 80 Architecture, Saint Pierre, La Réunion (FR)
October and November 2012 (2 months) - Architectural intern (Part 2)
Altitude 80 Architecture, Saint Pierre, Reunion Island (FR)
Septembre 2011 (1 mois) - Architecte Auto-entrepreneur
Unanimes Architectes, Lyon (FR)
September 2011 (1 month) - Self-employed Architect (Part 1)
Unanimes Architectes, Lyon (FR)
Juillet 2009 (1 mois) - Architecte Stagiaire
Pierre Vurpas Architectes Associés, Lyon (FR)
July 2009 (1 month) - Architectural intern (Part 1)
Pierre Vurpas Architectes Associés, Lyon (FR)
Formation
Septembre 2015 - Admise en Formation HMONP
ENSA Paris Malaquais (FR)
Education
September 2015 - Accepted for HMONP Training Course (Part 3)
ENSA Paris Malaquais (FR)
Juin 2012 - Diplôme d’Etat d’Architecte, Mention Bien
ENSA Lyon (FR)
June 2012 - Architecture Master Degree with honours (Part 2)
ENSA Lyon (FR)
Juin 2010 - Diplôme de Licence en Architecture
ENSA Lyon (FR)
June 2010 - Architecture Bachelor Degree (Part 1)
ENSA Lyon (FR)
Juin 2007 - Baccalauréat Scientifique, Mention Assez Bien
Lycée Fabert, Metz (FR)
June 2007 - French Baccalaureate with honours
Lycée Fabert, Metz (FR)
Concours & Distinctions
Janvier 2013 - Prix de la Jeune Architecture de Lyon 2013, Pré-sélectionnée - Lyon (FR)
Competitions & Awards
January 2013 - Prize of Young Architecture Lyon 2013, Short-Listed - Lyon (FR)
Janvier 2012 - Concours International, 3ème Prix, Anonymous.d Pavillon d’Exposition NY Highline under the bridge - NYC (USA)
January 2012 - International Competition, 3rd Prize, Anonymous.d, Exhibition Pavilion NY Highline under the bridge - NYC (USA)
Décembre 2008 - Concours étudiant, 1er Prix, Conception, réalisation et exposition “Lampadouch” à la Fête des Lumières - Lyon (FR)
December 2008 - Academic Competition, 1st Prize, Design, building and exhibition of a project for the Lights Festival - Lyon (FR)
Année 2008/2009 - Concours étudiant, 1er Prix, “Conception d’un nouvel espace d’accueil pour notre école” en association avec le
Lycée Professionel du Bois Georges Lamarque - Vaulx-en-Velin (FR)
Year 2008/2009 - Academic Competition, 1st Prize, Designing a new reception desk for our school working with Georges Lamarque
Professional High School - Vaulx-en-Velin (FR)
Logiciels
Autocad - Vectorworks - Rhinoceros (notions) - Sketchup - 3DS Max (notions) - Artlantis - Adobe suite - Final Cut - iWork - Office
Programs
Autocad - Vectorworks - Rhinoceros (notions) - Sketchup - 3DS Max (notions) - Artlantis - Adobe suite - Final Cut - iWork - Office
Intérêts
Escalade - Randonnée - Danse classique et contemporaine (10 ans en Sport Etudes) - Musique - Cinéma - Gastronomie - Voyage
Hobbies
Climbing - Hiking - Ballet and contemporary dance (“Sport Etudes” program for 10 years) - Music - Cinema - Food - Travel
Autre
Permis B - Vehicule personnel
Other
Driving License - Own car
60-62 Vyner Street
Fourthspace Ltd
Permis de construire
500 m2
Londres, UK
Avril 2015
Planning Application
500 sqm
London, UK
April 2015
Wa
de
son
Vyn
e
rS
Re
Ce projet consiste en la démolition d’un bâtiment existant
et la construction d’un bâtiment neuf de 4 étages composé
d’ateliers d’artistes sur 2 niveaux et de 4 appartements T2 sur
les étages supérieurs. Le bâtiment existant est un ancien bâtiment industriel. L’espace principal situé au rez-de-chaussée
est en plan libre, et à l’étage, se situe un plus petit atelier de
travail. Le projet prévoit environ 300 m2 de studio supplémentaire sur 2 étages. Cet espace additionnel est primordial
pour les clients (des artistes contemporains britanniques
reconnus), particulièrement pour des travaux de grande envergure engendrant la nécessité d’employer du personnel.
This project consists of the demolition of the existing building and the construction of a new 4-storey building consisting of 2 floors of artist studio space and 4 no. 1 bedroom
residential flats above. The existing building consists of a
former light industrial building. The main ground floor studio space has a large open plan space and above is a smaller
studio space. The proposal provides around 300 sqm of new
studio space over 2 floors. This extra space is vital for the clients (who are major British contemporary artists), especially when undertaking larger and more involved works when
there is a need to employ more assistants and support staff.
Lors de la conception, une étude de faisabilité a été entreprise
afin de déterminer la viabilité du projet. La collaboration
dans les prémisses du projet avec un économiste, a permis
de mettre en exergue le fait que la construction d’un bâtiment
neuf soit une meilleure solution en terme de calendrier, de
coût et de livraison.
During design development a feasibility study was undertaken to determine viability of the project. Working with a
cost consultant early, allowed an understanding that a new
build project would most likely prove to be a better form of
redevelopment in respect to time, cost and deliverability.
La conception du projet répond au contexte industriel existant. Le bâtiment ne présente qu’une seule élévation visible
depuis la rue et le domaine public. Par conséquent, la conception de la façade tend vers une idée claire du privé et du public. La partie résidentielle, plus privée, est en retrait par rapport à l’atelier d’artiste, élément bardé de briques. Les portes
et fenêtres du rez-de-chaussée et premier étage sont des éléments conçus pour être “actifs” ou “cinétiques” par le biais
d’écrans mobiles, volets et auvents. Ils font partie intégrante
de la conception de la façade et permettent une claire lisibilité
et sécurité.
The design of the new building reponds to the surrounding
context of former light industrial buildings. The new development has only one elevation that can be seen from the
street and the public realm. Therefore the design attempts
to engage with a clear idea of public and private. The more
private residential element is set back from the brick clad art
studio/commercial element. The doors and windows of the
ground and first floor are designed to be ‘active’ or ‘kinetic’
through the use of movable screens, shutters, and awnings
in a manner which is integral to the design of the elevation
and practical in terms of legibility and security.
Str
eet
tree
t
ge
nt’
sC
an
Site Boundary
Studio 1
al
Studio 2
Match Street Line
Residential
Structural Layout
Bring Light
Fourthspace
ARCHITECTURE&DESIG
N
Unit 1.4
1-5 Vyner Street
London E2 9DG
T: 020 8983 3388
E: [email protected]
NOTES
Fourthspace
ARCHITECTURE&DESIG
N
Unit 1.4
1-5 Vyner Street
London E2 9DG
T: 020 8983 3388
E: [email protected]
NOTES
REVISIONS
REVISIONS
307
PROJECT NUMBER
PROJECT
DRAWING TITLE
PROJECT
DRAWINGNUMBER
STATUS
PROJECT
DRAWING NUMBER
REVISION NUMBER
DRAWING TITLE
SCALE
DRAWING STATUS
DRAWN BY
JB
DRAWING NUMBER
Do Not Scale From This Drawing
60-62 Vyner Street
London E2 9DQ
Facade Details
Folding Screens
307
Planning Application
307.P.19
60-62 Vyner Street
London E2 9DQ
Facade02.03.2015
Details
Folding Screens
1:20 @ A3
Planning Application
CHECKED BY
SS
307.P.19
The Cabins
Fourthspace Ltd
Planning Application - Building Regulation
130 sqm
London, UK
June 2014
OUTSIDE
Examples of squared cladding
Ce projet consiste en la démolition d’algecos existants et la
construction d’un nouveau bâtiment pour accueillir des bureaux ainsi que des espaces de stockage pour une mosquée.
Les algecos existants sont de qualité médiocre et le client veut
améliorer le bâtiment en terme d’énergie et d’apparence.
Le nouveau bâtiment est une construction bois de deux étages avec une dalle en béton et des fondations sur pieux afin
d’éviter d’abîmer les racines des arbres avoisinants. Un bargade en bois de noisetier ainsi qu’une toiture végétale sont installés sur la structure bois. Les fenêtres sont positionnées en
concordance avec les espaces de travail (hauteur permettant
une vue vers l’extérieur lorsque l’on est assis) et les besoins
des usagers. L’élévation extérieure donne ainsi une impression de fenêtres carrées disposées aléatoirement.
C’est un projet simple et discret qui évite d’être trop voyant
ou inutilement ostentatoire. Une attention particulière a été
accordée à l’amélioration de l’apparence de cette partie de la
mosquée et à l’apport d’un espace secondaire mieux utilisable
et plus pratique.
This project consists of the demolition of existing portacabins and the erection of a new building to accomodate office
space and some storage space for a mosque complex. The
existing portacabin is of poor quality and the client wants
to improve the energy efficiency and the appearance of the
space.
The new building is a two-storey timber frame construction
on top of a new lightweight concrete slab with piled foundations that mitigate any impact on the tree roots. The timber
frame construction is clad in sweet chestnut timber cladding
and a green roof. The proposed windows are positionned in
relation with the working stations (hight which allows to
view the outside when sitting at a desk) and the need of the
users. From the outside, the elevation gives the idea of random squared windows.
It is a simple design that is discreet and avoids being garish
or, unnecessarily ostentatious. Importance has been given
to improving the appearance of this part of the mosque complex and to provide a far more practical and usable ancillary space.
125 mm Sweet Chestnut Boards
175 mm Sweet Chestnut Boards
Permis de construire - Normes Constructives
130 m2
Londres, UK
Juin 2014
Detail section of squared cladding - Scale
Fourthspace
ARCHITECTURE&DESIG
N
Wind Board
Unit 1.4
1-5 Vyner Street
London E2 9DG
T: 020 8983 3388
E: [email protected]
175 mm Sweet Chestnut Boards
Base Boards / Ventilation gap
Timber Frame
NOTES
Insulation
Horizontal Sweet Chestnut
Cladding Boards
125 mm Sweet Chestnut Boards
Plywood
Examples of squared cladding
REVISIONS
175 mm wide
sweet chestnut
cladding boards
with 25 mm overlap
150 mm face
2400
1750
200 mm wide
sweet chestnut
cladding boards
with 25 mm overlap
175 mm face
1500
Parapet Level
125 mm wide
sweet chestnut
cladding boards
with 25 mm overlap
100 mm face
2400
1300
5970
First Floor FFL
1250
4200
100 mm wide
sweet chestnut
cladding boards
with 25 mm overlap
PROJECT NUMBER
PROJECT
289
Mohammedi Park, Mosque,
Orford Road
Fourthspace Ltd
Permis de construire
210 m2
Londres, UK
Février 2015
Planning Application
210 sqm
London, UK
February 2015
Le développement est situé dans un secteur sauvegardé mais
le bâtiment existant n’est pas classé. Le bâtiment existant est
un abris en béton vétuste, sans fenêtres et non occupé. Le
projet est de démolir le bâtiment existant et de construire un
bâtiment constitué de deux maisons en R+1.
Le projet veut mettre en valeur son environnement en respectant les proportions et échelles existantes afin de référer à des
maisons de ville de qualité. Le traitement en élévation est en
relation avec le contexte mais aussi, l’organisation des deux
maisons a été conçue pour accueillir deux jeunes familles.
The proposed development is located in a Conservation Area
but the existing building is not listed. The existing building
is an old concrete clad shelter without windows. It is not
used and the project is to demolish it and erect a new 2-storey building consisting of 2 no 2 bedroom residential town
houses.
The proposal aims to enhance the area by following existing proportion and scales to suggest the appearance of well
built townhouses. The elevational treatment is responsive to
the surrounding context but also the internal arrangement
of both houses that have been designed to be suitable for
young families.
39 Groombridge Road
Fourthspace Ltd
Normes constructives - Etude de budget - Appel d’offre - Construction
240 m2
Londres, UK
Mai 2015
Building Regulation - Cost Plan - Tender - Construction
240 sqm
London, UK
May 2015
New double glazed aluminium
frame pivot door
To Garden
New full height fixed
aluminium frame double glazed window
See drawing 292T14 and scope of works.
Painted finish
Automated skylight above
New aluminium frame double
glazed glass Skylight above
EXT
Dining Area
Pivot sliding cabinet doors
Kitchen island
see scope of works
Automatic fire curtain by Coopers Fire
(firemaster or equal recessed in ceiling)
Boiler Flue from below boxed in
Kitchen/Dining
40 sqm
Manhole access
Re-work manhole panel to take
finished floor of polished concrete
but to remain accessible
Double
Fridge
Storage
Storage
Storage
New timber stairs
(250x190mm) 1650mm wide
WC
1.5 sqm
Existing wall
RWP
Part of existing wall to
demolish Ref. to Structural
Engineer's details
New timber stairs to basement
(230x190mm)
New glazed panel between ground
floor steps and stairs to basement
Storage
Storage
Allow for in-built
slots-channels for drop
down black out screen
New stairs (250x190mm)
695mm wide
Chimney breast to be removed
and made good (chimneys
already supported at high level)
Ref: structural engineer.
Existing timber balustrade to upper floors
Existing timber stairs to upper floors
Le projet consiste en l’extension d’une maison typique anglaise. Le client est une famille ayant deux jeunes enfants.
Quelques années auparavant, Fourthspace a déjà travaillé sur
le bureau situé au dernier étage de la maison et ont notamment ajouté une large fenêtre sur le toit.
La maison est située dans le Nord Est de Londres, juste à
côté d’un parc accessible directement depuis le jardin de la
maison. La petite cuisine ne convient plus aux besoins de la
famille qui aimerait l’améliorer.
Une extension a donc été conçue à l’arrière pour accueillir une
plus grande cuisine ainsi qu’une salle à manger. Une verrière
est installée sur le côté de la maison existante, permettant
d’apporter un maximum de lumière. Les cloisons existantes
sont démolies pour dégager l’espace au rez-de-chaussée. Le
séjour situé à l’avant de la maison et la cuisine / salle à manger
à l’arrière sont articulées par un pôle de services qui permet
d’avoir des rangements et un nouveau toilette. Le sous-sol est
également rénové pour y installer une grande buanderie et
d’autres rangements pour la famille.
This project is the extension of a terraced house. The client
is a family with two young children. Few years ago, Fourthspace already designed the office on the last floor and the
addition of a wide dormer window on the roof.
The house is located in East London, right next to a park
that it is possible to access directly from the rear garden. The
small kitchen is not suitable anymore for the family and they
would like to improve it.
A rear extension has been designed to receive a much bigger kitchen and dining room. A glazed roof is to be installed
on the side, to bring as much light as possible. The partition
walls are to be striped to allow an open space on the ground
floor of the house. A pod has been designed to articulate the
living room at the front of the house and the new kitchen at
the back. This pod allows a lot of storage and a new toilet.
The basement is also refurbished to become a big laundry
and storage space.
Sitting room
33.6 sqm
Joinery (built in shelving units,
see scope of works)
Ref. to Structural Engineer for
connection details with steel beams
and existing wall. Make good.
Finished timber floor boards.
Use existing and make good,
repair and finish where necessary
Automatic fire curtain by Coopers Fire
(firemaster or equal recessed in ceiling)
Allow for wall fixed cycle
supports
Entrance coir matt
Chimney breast to be retained
New Crittal Windows(Crittal
Corporate 2000) entrance lobby.
Full height glazing in steel frame
with crittal glazed door.
AV system
N° 37 Groombridge Road
Front door and front entrance
to remain as existing.
N° 41 Groombridge Road
Main Entrance
N
Bricks
up to 5 mm Mortex Colour
coating by Beal (refer to scope
of works)
D
100 mm screed with
underfloor heating
Bound
Aco slot drain or
equal
up to 5 mm Mortex
Colour coating (Ref
to manufacturer's
specifications for
outdoor application)
E
Vapour Barrier
Mortar be
A
Flashing detail to
manufacturer's
reccomendations
Flashing detail to
manufacturer's
reccomendations
Flashing detail to
manufacturer's
reccomendations
Topseal Green Top Sedum Roof
Topseal Double Top GRP
Membrane or equal approved
DPM
18 mm OSB deck
Flashing detail to
manufacturer's
reccomendations
Existing brick wall
Alumimium frame double
glazed fixed window and
skylight
Alumimium frame
double glazed fixed
window and skylight
2000 mm X 2000 mm (to
kerb)
Slide over fixed rooflight
by glazing Vision (or
equal).
(black finish and white
internal finish RAL 9010)
Performed gutter
integrated into top
of wall
Preformed gutter
integrated into top of wall.
Two layers of 12.5 mm
plasterboard
Wall type 1
200mm reinforced concrete slab
(Ref: Structural
Engineer details
Existing slab
& specification)
50 mm Lean mix blinding
50 mm L
100 mm PIR
Cavity wall
50 mm Lean mix blinding
152UC23
18 mm WBP
Plywood
140 mm Kingspan
Thermataper laid to falls
16 mm resilient bar fixed to joists
Vapour Barrier
DPM
Two layers of 12.5 mm plasterboard
300mm reinforced concrete
slab of 12.5mm
Two layers
(Ref: Structural Engineer detailsplasterboard
& specification)
140 mm Kingspan
Thermataper laid to falls
Well compacted
and levelled
hardcore
16mm resilient
bar
fixed to joists
(Sulphate free)
STEEL BEAM
(152UC)
Ref. Structural engineer for
more detail.
16 mm resilient bar fixe
Detail 3 Section
Detail th2
Scale 1:20 @ A3
DetailPivot
2 Section
and
aluminium
Detail 1 Section trough
DoorSkylight
- Scale
1:10
@ A3 frame along party wall and existing wall Scale 1:20 @ A3
Detail 1 Section Skylight and aluminium frame along party wall and flat roof Scale 1:20 @ A3
New automated skylight
100 mm Insulation
within cavity wall
Damp Proof Course
Painted Blockwork
Existing brick wall
RT1
Refer to Detail 1
drawing 292T16
Refer to Detail 1
drawing 292T16
254UC89
Position of
window
aluminium
frame
above.
254UC89
254UC89
Refer to Detail 2
drawing 292T16
Vapour barrier
100mm screed with
underfloor heating
DPM
254X146UB31
Position of
window
aluminium
frame
above.
offset column and steel
beam to allow window
frame to be positioned in
line with existing wall
152UC23
Up to 5 mm Mortex Colour
coating (Ref to manufacturer's
specifications for outdoor
application)
3921
3525
254UC89
4591
up to 5mm Mortex
colour coating by
Beal
Existing
Level
Concrete steps
(depth
going
down)
+99.59
Up to 5 mm Mortex Colour
coating (Ref to manufacturer's
specifications for outdoor
application)
Full length pitched glazed roof
by Culmax (or equal)
200mm reinforced
concrete slab
FOUNDATION
100mm
PIR
Vapour barrier
203UC60
50mm
1m wide reinforced concrete
foundation incorporating
300mm wide retaining wall to
support new slab and new wall
above.
lean
mix engineer for
Ref. Structural
binding
depth,
grade and other detail.
well compacted and
levelled hardcore
(sulfate free)
New brick wall
FT1
D
Fourthspace
REV
Fourthspace
[email protected] Web:
www.fourthspace.co.uk
50 mm Lean mix binding
REV
200 m
concr
Struct
detail
C
[email protected] Web:
www.fourthspace.co.uk
DATE DESCR
DRAWING STATUS
ARCHITECTURE&DESIGN
ARCHITECTURE&DESIGN
Unit 1.4 1-5 Vyner Street London E2 9DG Tel: +44 (0)20 89833388 Email:
Well compacted and
levelled hardcore
(Sulphate free)
NOTES
DATE DESCRIPTION
Unit 1.4 1-5 Vyner Street London E2 9DG Tel: +44 (0)20 89833388 Email:
FOUNDATION
1m wide reinforced concrete
foundation incorporating
300mm wide retaining wall to
support new slab and new wall
above.
Ref. Structural engineer for
depth, grade and other detail.
Detail 4 - Scale 1:20 @ A3
Detail 4 plan detail of glazed rear elevation Scale 1:20 @ A3
NOTES
A
5570
Section CC - ScaleDetail
1:100
@1:20
A3@ A3
3 - Scale
OOF TYPES - Scale 1:20 @ A3
E
Site Boundary
30 mm rigid insulationInsulation
Position of
window
aluminium
frame
above.
Site Boundary
Insulation
152UC23
B
TENDER
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE TO BE CHECKED ON SITE
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL CONSULTANTS INFORM
FOURTHSPACE RETAIN THE COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAW
2no. Hinged Pocket doors to be
concealed (flush finish) when
inset. Allow for manufacturer's
recommendations on hinges and
track and assoicated
ironmongery/handles. Door finish
to match the finish of the pod laminated formica (non-magnetic).
Note: ensure site measure prior to
manufacture.
Full height pull out larder with
touch mechanism (no handle) with
appropriate tracks and fixings, and
shelves built in to unit (shelves tbc
by client). Facing element to be in
laminated magnetic formica to
match finishes of 'pod'.
383
632
1769
632
Timber stud wall (studs to suit
provision of sliding and hinged
pocket door) with pocket door
mechanism incorporated. Internal
face to worktop area to be 18mm
finished plywood.
36
150
250
472
806
Allow for builderswork between
existing wall and new 'pod' joinery
element to accomodate fire curtain
fixings and installation at high
level, and for channel to be lined
to match pod joinery all the way to
floor level. Refer to fire curtain
manufacturer's details.
688
650
86
Concealed cistern with top access
50x50mm Timber stud frame wall
with 50 Isowool insulation with
laminated board on outside
(facing) edge and 18mm plywood
on inside (all sides) with concealed
scre fixings, and ditra mat layer for
laying client supplied ceramic tiles.
850
1010
749
Equal
50x50mm Timber stud frame wall
with 50 Isowool insulation with
laminated board on outside
(facing) edge and 18mm plywood
on inside. To accomodate full
height larder storage.
18mm Laminated board (MDF or
Plywood as per manufacturer's
reccomendations). Laminate to be
magnetic formica pre-machined
and laminated off-site.
3352
242
SWP RWP
Boxing out for services and
drainage. framed out carefully
around pipework with ditra mat or
tile backing board and tiled finish
(with client supplied tiles). Allow
for access panel to pipework for
rodding.
1797
3352
Equal
Mortex floor covering
Existing masonry wall
1108
Existing wall (tbc whether masonry
or stud), adapted to suit joinery
works where required and to be
finished with 18mm laminated
magnetic formica to match 'pod'
joinery
Allow for builderswork between
existing wall and new 'pod' joinery
element to accomodate fire curtain
fixings and installation at high
level, and for channel to be lined
to match pod joinery all the way to
floor level. Refer to fire curtain
manufacturer's details.
146
18mm Laminated board (MDF or
Plywood as per manufacturer's
reccomendations) to be used as
4no cupboard doors with suitable
hinges to be agrred by client.
Laminate to be magnetic formica
pre-machined and laminated
off-site.
733
769
733
769
86
50x50mm Timber stud frame wall
with 50 Isowool insulation with
laminated board on outside
(facing) edge and 18mm finished
plywood on inside (all sides) with
concealed scre fixings.
10 Vyner Street
Fourthspace Ltd
Permis de construire - Construction
370 m2
Londres, UK
Mai 2014
Planning Application - Construction
370 sqm
London, UK
May 2014
Les clients ont acheté le site pour réhabiliter et agrandir les
ateliers d’artistes non-utilisés pour y installer trois ateliers
d’artistes avec la possibilité de les utiliser comme galerie d’art
pour les expositions.
The clients bought the site to refurbish and extend vacant
artists studio and gallery to accomodate three artist studios
with the capability of being used as an art gallery for exhibitions.
Le projet est de construire une extension de deux étages sur
le bâtiment existant qui paraîtrait ne faire qu’un étage en retrait de la façade. La circulation et les services sont situés au
niveau du mur latéral afin de libérer un maximum d’espace
de travail. L’extension reste en rapport avec le contexte industriel. Sa forme biaisée et la fenêtre sur double hauteur permettent de garder l’esprit d’un seul étage.
The development is to extend and amend the existing building consisting of a two-storey roof extension to appear as
a large set back single storey extension. The design intension was to locate circulation and services to the side wall
to maximise the spaces and extend the property with a form
that would be in keeping and enhance the industrial character. The form of the extension is unique to the development,
with an angled elevation and a double height dormer style
window.
Rheinzink standing seam
roof 'Pre-weathered
graphite-grey colour'.
430
RLT1
Zink cladded flat
roof
refer to drawing
298T19
RLT1
RT1
RT1
Rheinzink standing seam
cladding 'Pre-weathered
graphite-grey colour'.
RT1
WT7
Rheinzink standing seam cladding
'Pre-weathered graphite-grey colour'.
Third Floor FFL: 9241
Rheinzink standing seam cladding
'Pre-weathered graphite-grey colour'.
WT5
FT1
studio 3 low level window WT6
FT1
FT2
WT6
RT2
Second Floor FFL: 5856
RWP
outlet/shoot
RT2
FT3
2450
Studio 2
FT3
First Floor FFL: 3040
FT1
N°12 Vyner Street
N°8 Vyner Street
2790
Studio 1
FT1
Ground Floor FFL: 0.00
B
A
C
D
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE TO BE CHECKED ON SITE
Unit 1.4 1-5 Vyner Street London E2 9DG Tel: +44 (0)20 89833388 Email:
[email protected] Web:
www.fourthspace.co.uk
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL CONSULTANTS INFORMATION
FOURTHSPACE RETAIN THE COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING
Front Elevation
140
140
18
302
18
298.T.13
- RHEINZINK-Insulated Angled
Standing Seam Roof sealed
Warm Roof on structured
Underlay with Warmfast Fixing
TYPE 3
- Polithene Vapour control layer.
- 18 mm structural Deck (WBP ply
- 6 mm hard board or equal)
CHECKED BY
- 28 mm ScreedBoard
-22528
X acoustic
38 structural timber joists
floor board
- 2 layers plasterboard
- 18 mm thick dense wood board.
REV
- Existing Concrete Slab
FT3
DRAWN
BY
FLOOR
225
DRAWING TITLE
1:100 @ A3
225
302
298
10 Vyner Street
ROOF TYPE 1
A
25
TENDER
JOB NUMBER
JOB TITLE
- 6 mm hard board
- 28 mm ScreedBoard 28 acoustic
floor board
- 18 mm thick dense woodSCALE
board.
FLOOR TYPE 2-FILE
Existing Concrete Slab
- 6 mm hard board
DATE
- 28 mm ScreedBoard 28 acoustic floor
13/02/15
board
- 18 mm thick dense wood board.
DRAWING NUMBER
- 50X225 timber joists
- 90 mm Kingspan Thermafloor TF70
Between joists
- 18 mm OSB or WBP Ply
- 60 mm Kingspan K15 Kooltherme
Insulation
-18 mm cement board
FT2
18 28
225
DRAWING
6
- 6 mm hard board
- 28 mm ScreedBoard 28 acoustic floor
board
- 18 mm thick dense wood board.
FLOOR TYPE -150X225 timber joists
STATUS
- 90 mm Kingspan Thermafloor TF70
- 6 mm hard board
Between joists
- 28 mm ScreedBoard
acoustic
floor
- 18 mm28
OSB
or WBP
Ply
board
- 60 mm Kingspan K15 Kooltherme
- 18 mm thick dense
wood board.
Insulation
- 50X225 timber
joists
-18 mm cement board
- 90 mm Kingspan Thermafloor TF70
Between joists
- resilient bars
- two layers 12.5 mm soundblock
plasterboard
FT1
225
18
6
18 28
240
DATE DESCRIPTION
- 6 mm hard board
- 28 mm ScreedBoard 28 acoustic floor
board
- 18 mm thick dense wood board.
- 50X225 timber joists
- 90 mm Kingspan Thermafloor TF70
Between joists
- resilient bars
- two layers 12.5 mm soundblock
plasterboard
RT1
FLOOR TYPE 3
18
ARCHITECTURE&DESIGN
REV
1313
Fourthspace
NOTES
FT3
FLOOR TYPE 2
1313
240
FLOOR TYPE 1
25
FT2
6
FT1
18 28
18 28
6
Section EE Scale 1:100 @ A3
10 Bathurst Mews
Rodic Davidson Ltd
Permis de Construire
120 m2
Londres, UK
Juin 2013
Planning Application
120 sqm
London, UK
June 2013
Cette maison de 120 m2 est située dans une charmante allée
pavée près de Hyde Park. Bathurst Mews est une des quelques
allées restantes où il y a encore des étables en service. Les
clients, un couple, voulait plus de surface afin d’avoir des espaces de meilleur qualité et agréables à vivre.
This 120 m² house is located in a a charming cobbled mews
close to Hyde Park. Bathurst Mews is one of the few remaining mews where there are stables still in use. The client, a
couple, wanted to increase the area of their property and get
valuable spaces in which it is nice to live.
Le projet est de créer un niveau supplémentaire en sous-sol
et d’y amener de la lumière naturelle par le biais de puits de
lumière et passerelles. Les doubles hauteurs laissent les occupants et visiteurs deviner ce qu’il se passe dans le reste de la
maison. De simples matériaux comme le béton et le bois sont
proposés. Le sol du dernier niveau est carrelé.
The proposal was to create a new basement and provide
voids and bridges to get the light to the lowest floor. The
double heights let visitors or occupants guess what happens
below and above them. Simple materials like concrete and
timber are used. The basement floor is tiled with designed
pattern.
N
67 Great Russel Street
Rodic Davidson Ltd
Construction
200 m2
Londres, UK
Août 2013
Construction
200 sqm
London, UK
August 2013
Rodic Davidson Architects ont déménagé dans de nouveaux
bureaux en face du British Museum. L’entrée principale se
fait par une court intérieure à l’arrière du bâtiment, où se
trouvent un typique pub anglais, un magasin d’appareils photo, une librairie, une galerie d’art et une école de cuisine.
Rodic Davidson Architects moved to a new office in front
of the British Museum. The main entrance is through a private courtyard at the rear of the building, where are a typical pub, camera and book shops, an art gallery and a chef
school.
Etant une vitrine de leur travail, tous les détails doivent être
pensés dans ce nouvel espace. Le travail de détails, notamment pour les salles d’eau fut pris en compte. Lumières, jeux
d’ombre, matériaux tels que le bouleau ont été choisis pour
que ces espaces soient chaleureux.
As a display of their work, every detail has to be thought
about in this space. Working on details, especially for the
bathroom was very important. Lights, shadow gaps and
birch make this space feel warm.
Centre des Finances Publiques
Altitude 80 Architecture
Avant Projet Détaillé
4000 m2
Saint Denis, Ile de la Réunion, FR
Octobre 2012
Detail drawings - Building Regulation
4000 sqm
Saint Denis, Reunion Island, FR
October 2012
Ce projet consiste en la réhabilitation du centre des finances
publiques de Saint Denis. Le bâtiment était vieillissant et
présentait beaucoup de problèmes thermiques et énergétiques.
La façade principale était toujours exposée au soleil et
l’équipe d’architectes ont du trouver une solution pour améliorer la qualité de l’espace intérieur. De grands voiles ont été
installés sur la façade pour ainsi réduire la quantité de lumière à l’intérieur du bâtiment tout en gardant une vue vers
l’extérieur. Sur le reste du bâtiment, des brise-soleil colorés
ont été installés au niveau des fenêtres avec un espacement et
une ouverture tels que le soleil ne puisse pas entrer directement tout au long de l’année.
La cour intérieure, en béton foncé, apportait beaucoup de
chaleur et n’était pas réellement utilisée car la température y
était souvent trop élevée. La fontaine hors d’usage a été transformée en un espace vert avec de grands palmiers et fougères.
Ainsi les plantes procurent de la fraicheur au bâtiment.
This project is the refurbishment of the tax building in Saint
Denis. The building was getting old and had a lot of energy
and thermal issues.
The main facade was always in the sun and the architect
team had to find a solution to improve the space inside. The
idea was to put bespoke veils on the facade to reduce the
amount of light but not the view to the outside. On the rest
of the building, where needed, some coloured brise-soleil are
put on the windows with space and angle that is calculated
so the sun does not go directly inside the nuilding during the
whole year.
The courtyard use to have a concrete floor, so it was very
warm and people did not really use it. The unused fountain
is transformed into a big planter where big palmtrees and
fern are planted. Plants help to cool down the building naturally.
2 Rue Crétet
Projet Personnel
Conception
30 m2
Paris, FR
Juin 2015
Design
30 sqm
Paris, FR
June 2015
Le client a acheté cet appartement au rez-de-chaussée d’un
immeuble situé à deux pas de Montmartre afin de le rénover
et d’ajouter de la qualité aux espaces.
The client bought this flat on the ground floor of a building next to Montmartre to refurbish it and add value to the
space.
La mezzanine existante située dans la pièce principale est
démolie pour retrouver une belle hauteur sous plafond. Une
nouvelle mezzanine est proposée au dessus des sanitaires et
de la cuisine pour y accueillir un espace de couchage. Une verrière apportera plus de lumière naturelle à cet appartement
enclavé entre deux grands immeubles.
The existing mezzanine in the main space is to be demolished
to get the nice ceiling height back. A new mezzanine is proposed on top of the kitchen and bathroom to put a bed. A
glazed roof will provide a nice light to this appartment stuck
between bigger buildings.
La table à manger est située à proximité de la cuisine et les
occupants peuvent profiter de la double hauteur lors de leurs
repas. Un parquet à chevrons est posé pour apporter plus de
chaleur à ce petit appartement. L’escalier habille l’espace par
son design en souplesse pour ne pas obstruer. Des rangements sont également proposés dans les contremarches pour
gagner de l’espace dans la cuisine.
The dining table is located next to the kitchen and people
can enjoy the double height while having diner. Timber floor
with herringbone pattern will provide a warm and cosy
feeling to this small flat. Light designed stairs add poesy to
the space and also some storage for the kitchen area.
P01 Projet - Plan RDC
Ech. 1:50 @ A4
N
220 m3
Juliette Biesse, Alexandre Carpentier, Maxime Pauzon
Concours International - 3e Prix
220 m3
New York City, USA
Janvier 2012
International Competition - 3rd Prize
220 m3
New York City, USA
January 2012
1m
1m
1m
SIMPLE RAW MATERIAL
TRANSPORT
EXPLODED
UNLOAD
CONSTRUCTION
204 m2
REQUIRED
LECTURE
PROPOSED: EXHIBITION AND GATHERING VOLUME + ART STUDIO
EXHIBITION
www.220m3.com
FREE: 25th.JAN
GO ON THE WEBSITE
Le but est de redonner aux locaux, l’opportunité d’exposer
leurs travaux, leurs intérêts et de les partager avec les visiteurs. “Under the bridge” espace vide sous le pont, nous ammène à créer un point attractif dans un contexte culturel.
Focusing on the needs for an Art exhibition pavilion, the
team developed another concept regarding the standards of
the existing street’s galleries: the proposal is a volumetric
showcasing area.
The aim is to give back to local people the opportunity to
simply exhibit their works, their interests, and share it with
the pedestrians visitors. The «under the bridge» condition
leads us, from an empty space, to make an attractive spot in
that cultural context.
EXHIBITION
180 m2
WHO: Name
WHAT: Type
En se recentrant sur les critères et besoins d’une galerie d’art,
l’équipe a développé un concept différent par rapport aux
galeries d’art existantes: le projet est un volume d’exposition.
STACKED
220 m3
112 m2
http://
BUILT
CHECK AVAILABILITY
GATHERING
MIX BETWEEN PERMANENT / OPEN EXHIBITION
ART STUDIO
4 9 2 6 6
*RECEIVE LOCKER CODE
BOOK ONLINE
GO ON SITE
Degrés d’intimité
ENSA Lyon
Projet de Fin d’Etudes
2000 m2
Viry, FR
Juin 2012
Master Thesis
2000 sqm
Viry, FR
June 2012
En relation avec une étude du grand territoire BellegardeGenève effectuée au premier trimerstre de deuxième année
de master, le travail de PFE s’est dirigé vers la réflexion sur
les espaces de vie pour les plus isolés au sein de ce territoire
diffus.
Le programme est une structure d’accueil et de résidence
pour des personnes isolées, couplée à des équipements publics nécessaires aux populations alentours. Une recherche a
été établie sur la cohabitation et la relation entre les différents
acteurs. La resociabilisation doit se faire en douceur et permettre plusieurs degrés d’intimité et de contact avec les autres (personnes, objets, nature, paysage).
Il est important que les personnes isolées puissent retrouver
des intants de partage. Mais il est aussi nécessaire pour un
équilibre en socitété de pouvoir accéder à des moments de
solitude. Le degré d’intimité est lié à celui de l’appropriation
de l’espace, la relation affective entre une personne et un lieu.
La morphologie du bâti crée des limites, seuils, passages entre différents espaces. Ces outils permettent de retranscrire
une gradation de l’intimité en fonction des espaces et usages.
La typologie et l’organisation du bâtiment conditionnent la
notion d’intimité et instaurent une distance ou une proximité voire une profondeur dans l’espace ressenti ou vécu. Les
dispositifs construits, les baies, seuils, hauteurs, épaisseurs,
textures, matérialité, permettent une différenciation et une
hiérarchie des espaces les uns par rapport aux autres. Les différents espaces du bâtiment sont mis en relation et créent des
frictions, dilatations, qui leur donnent leurs caractéristiques
propres.
Related to a previous research on the housing concern of the
large scale territory of Geneva-Bellegarde, the aim of the
master thesis was to work on the issue of living space for the
poorest people on this diffuse territory.
This host structure for single occupants is coupled with public amenities for residents as well as villagers. A research
on cohabitation and relationship between the parts (space
and humans) was implemented. The socialization has to be
soft and has to allow various levels of intimacy with others
(people, objects, nature, landscape).
Lonely people need to get moments when they can share. But
it is also necessary for their balance to be able to be alone.
The level of intimacy is related to the appropriation of the
space, the affective relationship between someone and a
place.
The building creates limits, thresholds, ways between spaces. These tools allow different levels of intimacy according
to the use and the space. The typology and the internal organization of the building determine the intimacy and give
distance or proximity or depth in the space felt by the users.
Openings, thresholds, heights, thickness, textures, materiality, allow a hierarchy and a difference between spaces.
All the spaces within the building are related to each other,
which creates frictions, expansions, which are their own
characteristics.
N
N
Fête des Lumières
ENSA Lyon - Juliette Biesse, Alex Perret
Concours étudiant - Lauréat
Exposition
Lyon, FR
Decembre 2008
Stutent Competition - Laureate
Exhibition
Lyon, FR
December 2008
Ce projet qui a été réalisé dans le cadre d’expérimentations
étudiantes pendant la Fête des Lumières de Lyon en 2008
fut construit par les étudiants aux “Grands Ateliers de l’Isle
d’Abeau” avec des matériaux bruts. Le projet a été exposé durant 4 jours aux visiteurs, dans les rues de Lyon.
This project is implemented within the framework of student
experiments during the Lights Festival in Lyon in 2008 was
built by students in the “Grands Ateliers de l’Isle d’Abeau”
with simple raw materials. It was exposed for four days to
visitors.
Des lumières à variation de couleur sont installées dans chacunes des cabines. Les rideaux de douche créent des écrans
qui laissent apparaître quatre silhouettes. Les cabines de
douche, extraites de leur contexte, deviennent d’immenses
lanternes.
A variable color lighting is placed in each of the cabin. The
screen made by the shower curtain leaves us appear four
figures. Shower stalls, out of their original environment
become huge lanterns.