Mise en page 1

Transcription

Mise en page 1
162-285 Systems design 2012_Mise en page 1 15/05/12 11:48 Page229
Modelling systems simulation
OLDP
On Line Digital Production
COMPLETED
PROJECT
Develop the basis of the first on line, web 2.0 type, services platform in Digital Production, in order to set up an advanced node of a future world wide network, supported by
hubs for extended enterprise. Provide to the french industrial community, and especially
the SME, a seamless process and tools to co-develop and co-monitor the production
chain on the extended enterprise scheme.
CONTACT
Bernard BOIME
EADS INNOVATION WORKS
+33 (0)1 46 97 32 42
[email protected]
PROGRESS BEYOND THE STATE OF THE ART
◗ Deliver a first set of on line services enabling the design of the whole supply chain (process
editors, and resources and behaviour editors, tools for sheduling edition, etc.).
◗ Deliver an on line architecture on a 6 levels basis, enabling digital extended factory modelisation by simple combination
(on line generic components data
base, including behaviour models,
easily combined on line).
◗ Intregrate digital factory and real
world on line
• by managing various real events
that need to be exchange on line
with the digital factory;
• integrating haptic and/or motion
capture devices, providing a
realistic immersive environment
for real operator experimentation of the virtual model (use
case for instance: validate the ergonomy of an assembly station). Software modules
are developed in VIRTOOLS, and data defined in CATIA V6 (geometry, kynematics,
dynamics, etc.).
PARTNERS
Large companies:
DASSAULT AVIATION,
DASSAULT SYSTEMES,
EADS INNOVATION WORKS
Intermediate size enterprises:
ALTIS SEMICONDUCTOR, ILOG
SMEs:
INTERCIM, TROCHET
Research institutes, universities:
CEA LIST, IRISA, SUPMECA
PROJECT DATA
Coordinator:
EADS INNOVATION WORKS
MAJOR PROJECT OUTCOMES
Call:
FUI6
◗ Products:
Start date:
July 2009
Industrial softwares CATIA-DELMIA-3DVIA, MKM (virtual mannequin), ILOG, PERTINENCE
suite.
◗ Services:
1 dissemination platform under feasability evaluation.
◗ Experimentations:
On-line service for:
• digital production engineering;
• digital production experimentation;
• digital production/virtual reality integration;
• digital production/Manufacturing execution systems integration;
• collaborative database of digital production components.
Duration:
18 months
Global budget (M2):
8.5
Funding (M2):
3
Related Systematic project(s):
USINE NUMÉRIQUE 1 & 2
◗ Business creation:
New business model services around shared/owned software suites.
Systems Design and Development Tools WG
229

Documents pareils