- Eurocontrol
Transcription
- Eurocontrol
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE REAL-TIME SIMULATION OF TURKISH AIRSPACE Executive Summary of EEC Report No. 301 EEC Task AR41(S05) EATCHIP Task : ASM.ET1.ST01 Issued: August 1996 The information contained in this document is the property of the EUROCONTROL Agency and no part should be reproduced in any form without the Agency’s permission. The views expressed herein do not necessarily reflect the official views or policy of the Agency. REPORT DOCUMENTATION PAGE Reference: EEC Report No. 301 Executive Summary Security Classification: Unclassified Originator: EEC - RTO (Real-Time Simulations Operations) Originator (Corporate Author) Name/Location: EUROCONTROL Experimental Centre B.P.15 F - 91222 Brétigny-sur-Orge CEDEX FRANCE Telephone : +33 1 69 88 75 00 Sponsor: EATCHIP Development Directorate DED.4 Sponsor (Contract Authority) Name/Location: EUROCONTROL Agency Rue de la Fusée, 96 B -1130 BRUXELLES Telephone : +32 2 729 9011 TITLE : REAL-TIME SIMULATION OF TURKISH AIRSPACE Author J.P Zabka EATCHIP Task Specification ASM.ET1.ST01 Date 8/96 Pages vi + 21 EEC Task No. AR41 (S05) Figures 2 + 5 maps Tables 0 Task No. Sponsor Appendix 1 References 3 Period 1994 to 1995 Distribution Statement: (a) Controlled by: Head of RTO (b) Special Limitations: None (c) Copy to NTIS: NO Descrition (keywords): AR41 - Real-Time Simulation - ARN - ATC Tasks - Black Sea - Bulgaria FIR/UIR EATCHIP Development - Military Traffic - Route Network - Sectorisation - Top-Down-Simulation Traffic Flows - Turkey FIR/UIR Abstract: This report describes a Real-Time Simulation designed to assess different proposals for revised sectorisation aimed at increasing the capacity of the Turkish FIR/UIR in order to accommodate expected 2001 traffic demand. This document has been collated by mechanical means. Should there be missing pages, please report to: EUROCONTROL Experimental Centre Publications Office B.P. 15 91222 - BRETIGNY-SUR-ORGE CEDEX France REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE________________________________________________________________________ TURKISH REAL-TIME SIMULATION by J.P. Zabka SUMMARY The AR41 Turkish simulation was an organisational Real-Time simulation designed to evaluate and assess the future development plans of the State Agency for Airports and Air Traffic Control in Turkey (DHMI) for area services provided in the Istanbul and Ankara Control centres until the year 2001. The forecast growth of air traffic (+60% low forecast) is expected to significantly effect ATC operations. The simulation took place during a five week period from 13 November to 15 December 1995. Six organisations using 1996 and 2001 traffic levels, were tested by 25 Turkish Air Traffic Controllers and 2 Bulgarian controllers. An evaluation of new sectorisations and new routes was executed. A total of 33 exercises were completed during the simulation, representing 73 hours of Real-Time simulation. Results, based on the participants subjective opinions recorded during the simulation and analysis of exercises obtained from system recordings, indicate that the sectorisation plan developed in organisation 6 will enhance safety and increase the ATC capacity of Istanbul and Ankara control centres. The results also indicate that full benefit of the revised sectorisation will not be achieved unless some fundamental changes to the current route structure are introduced to obtain a good balance of workload between Istanbul and Ankara ATC centres. EEC Task AR41 (S05) - EEC Report N°301 Page iii REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE________________________________________________________________________ ABBREVIATIONS A/C ACC ADEP AIP ATC ARN CWP DFL EATCHIP EEC FDM FDPS FIR FL FPL GAT ISA KBD NASA TLX NM NSL OAT ORG PC PFL RC RDPS RFL R/T SID SSR STAR TMA EEC Task AR41 (S05) - EEC Report N°301 Aircraft Air traffic Control Centre Airport of Departure Aeronautical Information Publication Air Traffic Control ATS Route Network Controller Working Position Division Flight Level European ATC Harmonisation and Integration Programme Eurocontrol Experimental Centre Flight Data Message Flight Data Processing System Flight Information Region Flight Level Flight Plan General Air Traffic Instantaneous Self Assessment Keyboard NASA Task Load Index Nautical Miles Name given in the Alenia system to the Quick look function Operational Air Traffic Organisation Procedural Controller Planned Flight Level Radar Controller Radar Data Processing System Requested Flight Level Radiotelephony Standard Instrument Departure Secondary Surveillance Radar Standard Terminal Arrival Route Terminal Control Area Page iv REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE________________________________________________________________________ TABLE OF CONTENTS ANNEXES ............................................................................................................ vi FIGURES ............................................................................................................ vi REFERENCES ............................................................................................................ vi 1. INTRODUCTION .......................................................................... 1 2. SIMULATION OBJECTIVE ................................................... 2 2.1 2.2 Principal Objectives............................................................................. Secondary Objectives ......................................................................... 2 2 3. ORGANISATIONS TESTED ................................................... 3 4. TRAFFIC SAMPLES .................................................................. 4 5. CONCLUSIONS ........................................................................... 5 6. RECOMMENDATIONS ............................................................. 8 Green Pages : French version of Summary, Introduction, Organisations Tested, Conclusions and Recommendations. Pages vertes : Version en langue française du sommaire, de l'introduction, des objectifs, des organisations testées, des conclusions et recommandations. EEC Task AR41 (S05) - EEC Report N°301 Page v REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE________________________________________________________________________ ANNEXES ANNEX 1 Maps of Organisations Tested .................................................................. 16 FIGURES Figure 4.1 Figure 4.2 Traffic Distribution - Friday Traffic Sample ............................................... Traffic Distribution - Saturday Traffic Sample ........................................... 4 4 REFERENCES [1] « Facility Specifications for the Turkish real-time simulation » June 1995 [2] « AR41 Controller Handbook » June 1995. [3] «Top-Down Approach to route network and airspace development in the airspace of Bulgaria, Romania & Turkey » EEC Report 293 EEC Task AR41 (S05) - EEC Report N°301 Page vi REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ 1. INTRODUCTION Turkey has a significant role in European ATC, as it provides ATS on several major routes to the Middle East and the Far East and has been confronted, over the last few years, with a strong increase in traffic due to the Yugoslavian crisis. This has resulted in traffic which originally routed through ex Yugoslavia, Italian and Greek airspace being re-routed via Austria, Hungary, Rumania, Bulgaria and Turkey. In addition the forecast traffic for 2001 through Turkish airspace indicates a 60% increase on today's traffic level, even when the reopening of the Zagreb FIR is taken into consideration. In order to cater for this significant future increase in traffic, the State Agency for Airports and Air Traffic Control in Turkey (DHMI) decided to modernise the Air Traffic Control (ATC) system of Turkey (a new technical environment has already been installed in two new area control centres in Istanbul and Ankara). To obtain the maximum benefit from the adoption of the new technical environment (comprising an automated Radar Data Processing System and a Flight Plan Processing System) it will be necessary to improve the current operational environment of Istanbul and Ankara ACC before the capacity limits of both centres is reached. With this aim several plans, including new sectorisation, new routes, reduced separation standards, and proposals resulting from co-operative studies between Turkey, Bulgaria, Rumania, have been defined by DHMI. Since operational working methodology is an important aspect of efficient ATC and the introduction of FDP represents a significant change to current operations, a decision was made to evaluate the different projects through realtime simulation. The requirement for a real-time simulation for Turkey was agreed at the Simulation Users Group meeting in January 1994, and the slot November December 1995 was allocated for the conduct of the experiment (designated EEC task AR41). The simulation specifications were developed in a series of AR41 simulation working group meetings, in which representatives of DHMI and Eurocontrol have participated. The Eurocontrol Headquarters sponsor for the simulation was DED.4. Annex 1 provides the names of the working group members. The simulation was conducted at the EEC during 5 weeks, from 13 November to 15 December 1995. The simulation was divided in two distinct periods : the first consisting of a week of training and familiarisation with the environment ; the second comprising four weeks of measured exercises on the organisations prepared before the simulation start, and developed during the simulation. Six different sectorisation arrangements were tested with 1996 and 2001 traffic levels. 33 exercises (73 recorded simulation hours) were completed. EEC Task AR41 (S05) - EEC Report N°301 Page 1 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ The results and conclusions presented within this report are based on controller opinions (expressed at de-briefings and in post-exercise questionnaires), observations of simulation project staff and analyses obtained from system recordings. EEC Task AR41 (S05) - EEC Report N°301 Page 2 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ 2. SIMULATION OBJECTIVES 2.1 Principal objectives The simulation had two principal objectives: 1) 2) To evaluate a number of new sectorisation proposals, new routes and prodedures. In particular: • To assess new sectorisation proposals for Istanbul and Ankara FIR. In particular the comparison of the geographical and vertical split of the Ankara and Istanbul ACCs, and to evaluate the advantage gained by splitting the Ankara East sector. • To assess new routes for Istanbul and Ankara FIR arising from proposals developed for ARN version 2. • To assess the impact of reduced separation from 30 NM to 20 NM on the western FIR boundary, the Istanbul/Ankara FIR boundary, and the effect on the 15 minutes separation (at the same FL) required with adjacent procedural ACC's. As a result of the experience gained during the first four defined organisations ; to devise and simulate new and revised proposals in Organisations 5 and 6. 2.2 Secondary Objectives In addition, as with all simulations conducted at the EEC, the simulation period provided the opportunity to discuss in depth existing and proposed procedures and all aspects of the proposed new system. These results are presented where appropriate. EEC Task AR41 (S05) - EEC Report N°301 Page 3 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ 3. ORGANISATIONS TESTED Four different organisations (Organisations 1, 2, 3 and 4) were prepared before the simulation and evaluated during the simulation. Organisation Sectorisation for Istanbul ACC Sectorisation for Ankara ACC 1 The existing (1996) vertical sectorisation The existing (1996) geographical sectorisation1 2 approach sectors (P, approach sector (L) N) and 2 ACC sectors and 2 ACC sectors (AW, A) with DFL315 (I, E) The existing (1996) route network 2 The existing (1996) vertical sectorisation The existing (1996) plus new routes The existing (1996) geographical sectorisation Route network 2 approach sectors (P, N) and 2 ACC sectors 1 approach sector (L) with DFL315 (I, E) and 2 ACC sectors (AW, A) 3 4 A new geographical sectorisation 2 approach sectors (P, N) and 2 ACC sectors (I, E) A new vertical sectorisation 2 approach sectors (P, N) and 2 ACC sectors with DFL275 (I, E) A new geographical sectorisation 1 approach sector (L) and 2 ACC sectors (AW, A) A new vertical sectorisation 1 approach sector (L) and 3 ACC sectors A and (AW/AE) DFL275 The route network of organisation 2 The route network of organisation 2 Two additional organisations (Organisations 5 and 6) resulting from controller proposals, were developed and tested during the simulation. Organisation Sectorisation for Istanbul ACC Sectorisation for Ankara ACC Route network 5 A new vertical sectorisation The sectorisation of organisation 4 The route network of organisation 2 The sectorisation of organisation 4 A new distribution of traffic 2 approach sectors (P, N) and 3 ACC sectors (I, Q, E) 6 The sectorisation of organisation 5 Maps showing the geographical details of all organisations are provided at Annex 1. EEC Task AR41 (S05) - EEC Report N°301 Page 4 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ 4. TRAFFIC SAMPLES Two days of traffic were provided by DHMI. These were : • Weekday • Weekend 15 July 1994 (24 hours - Friday) 16 July 1994 (24 hours -Saturday) For each day the EEC extracted the busiest period of 120 minutes to obtain the two base traffic samples designated TF, TS (Traffic Friday, Traffic Saturday). The base samples were used to construct two levels of traffic representing 1996 and 2001. The Eurocontrol DED.4 provided the traffic increments. Traffic samples TF and TS were increased by approximately 15% to reflect the 1996 traffic figures and designated TF1996 and TS1996. Traffic samples TF and TS were increased by approximately 60% to reflect the 2001 traffic figures and designated TF2001 and TS2001. Military traffic provided by DHMI (40 flights) was then added to the TF1996 and TF2001 samples to reflect current operations in Istanbul and Ankara centres. Figures 4.1 and 4.2 show the traffic distribution for the 1996 and 2001 traffic samples. The Table 1 shows the increase in traffic actually experienced during the simulation. Distribution of traffic Friday traffic samples 110 100 90 80 70 60 50 40 30 20 13:15:00 1996 max= 91 A/C min=26 A/C mean=63 A/C 2001 max=111 A/C min=30 A/C mean=82 A/C 13:35:00 13:55:00 14:15:00 14:35:00 14:55:00 15:15:00 Figure 4.1 Distribution of traffic Saturday traffic samples 100 90 80 70 60 50 40 30 1996 max=69 A/C min=26 A/C mean=50 A/C 2001 max=95 A/C min=31 A/C mean=69 A/C 20 13:15:00 13:35:00 13:55:00 EEC Task AR41 (S05) - EEC Report N°301 14:15:00 14:35:00 14:55:00 15:15:00 Figure 4.2 Page 5 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ 5. CONCLUSIONS It was recognised by the Turkish national management staff responsible for AR41 that the simulation had one important merit : it had provided the opportunity to a large number of controllers from Istanbul, Ankara, Sofia and Varna to work together during 5 weeks to establish in real-time a re-organisation of the Turkish airspace, taking into consideration the problems of the Bulgarian adjacent centre. Objective 1 The first objective of the simulation was the development of a sectorisation plan for Turkey, permitting an increase in the capacity of the airspace currently controlled by Istanbul and Ankara This objective was achieved with the assistance of the participating controllers by taking the findings of the organisations 1, 2, 3, 4 studied by them during the simulation and creating a new sectorisation plan which foresees a 50% increase in the number of sectors to handle the 60% (low forecast) increase in traffic predicted for 2001. All four original sectorisation plans generated excessive levels of workload on all sectors. This new sectorisation plan is composed of the following 12 sectors: Istanbul FIR (5 sectors) • the current sectorisation of Istanbul TMA (P, N sectors) ; • 3 upper sectors (above TMA) : Q FL 165/FL 255, I FL 255/FL 315, E FL315/FL460. Ankara FIR (7 sectors) • an extended Ankara TMA (L sector) • 2 upper sectors (BAGLUM area) : AW: FL 165/FL 275, AE: FL275/FL460 ; • 2 geographical sectors in the east of the FIR All Ankara controllers confirmed the need to split the current East sector due to its excessive size. The north south division of this sector was rejected by a majority of controllers because this split maintained very large sectors. The general preference of the controllers was for a geographical East West division of this sector into two sectors of equal size. • 2 upper sectors in the south. Although South sector was not measured during the simulation, it can be anticipated from exercise observations, that there will be a need to split this sector vertically into two sectors (DFL 275). With the lower sector responsible for the traffic regulation to Antalya and the upper sector dealing with the overflying traffic to and from the Middle East. EEC Task AR41 (S05) - EEC Report N°301 Page 6 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Vertical sectorisation The simulation also verified that the establishment of vertical sectors is operationally viable in the Istanbul and Ankara FIRs even if the traffic being controlled contains a high proportion of flights in vertical evolution. In such cases the benefits expected from such a solution are linked to the establishment of clear operational procedures between sectors and centres, requiring flight profile management to avoid excessive co-ordination and keeping FDP input to the minimum. In such a case "Q" sector should be responsible only for traffic to and from Istanbul ; "I" sector should be responsible for overflying traffic and traffic to and from Izmir, Dalaman, Antalya ; "E" sector should be responsible only for overflying traffic. Nevertheless, the simulation has indicated that the full benefit of this revised sectorisation will not be achieved unless some fundamental changes to the current route structure and flow orientation of traffic are introduced. These are explained below. Objective 2 The second objective was to assess the impact of three new routes on the sectorisation requirements for Istanbul and Ankara. The introduction of these routes did not offer improvements on the operation of Istanbul and Ankara ACC, (no improvement in the balance of traffic distribution between Istanbul and Ankara ACC, no reduction in the complexity of traffic situations in the Turkish FIR). Therefore controllers reconsidered the traffic flow organisation, using results obtained from the Top Down Approach Study conducted at the EEC with the Fast Time Simulation Model. They made the following proposals which were tested successfully in organisation 6. Creation of the route TGJ-TASEV-BURSA- KFK, one way route for traffic coming from western European countries (TASEV being a new entry point in the Turkish FIR, defined by the intersection of the route TGJ, IST with the FIR boundary). • Traffic destination the Middle East would proceed TGJ-TASEV-BURSA-KFKMUT-VESAR. • Traffic destination Antalya would procced TGJ-TASEV-BURSA-CRD-AYT. Dualisation of UG1 between CND and IST : • UG1 west : IST-RIXEN west-CND , one way route for Istanbul departures. • UG1 east : DINRO-RIXEN east-BKZ , one way route for Istanbul arrivals. Rerouting of traffic inbound and outbound Izmir, Dalaman. This traffic should enter and exit the Turkish FIR only via RADOVETS to avoid the crossing of the congested IST area. • Inbounds following RAD-ADORU-EKI-BIGA-IMR. • Outbounds following IMR-ADORU-RAD. Rerouting of Antalya departures to western European countries via DAMLA-KFK east-BKZ-RIXEN west-CND EEC Task AR41 (S05) - EEC Report N°301 Page 7 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Creation of two uni-directional routes for Far East traffic. An initial proposal suggested that eastbound traffic should follow CND-TALIK-GEM-VAN-BONAM and westbound traffic should follow DASIS-ERZ-TBN-TALIK-CND. In the view of remaining difficulties over the Black Sea area between CND and TALIK a proposal to dualise the CND-TALIK airway was made and routings were modified as follows : DINRO-INB-GEM-VAN-BONAM for eastbound traffic, and DASIS-ERZ-TBN-TALIK-CND for westbound traffic. Suppression of ODESSA-BAG . Traffic from Former Soviet Union inbound to Istanbul re-routed via CND-RIXEN East . All other traffic from Former Soviet Union re-routed via ODESSA-TALIK-BAG . Replacement of RIXEN-BAG by DINRO-RUDON-BAG for traffic from the Middle East to western European countries and for all LTAC traffic to and from western European countries. This would contribute to a better balance of traffic between Istanbul and Ankara ACCs. Considerable benefit was derived from simulating the controller's proposals which were,(with the exception of the proposal to specialise RADOVETS for traffic to and from Istanbul, Izmir, Dalaman), compliant with the main results obtain by the Top Down Approach study. To make these proposals reality it will be necessary to solve the problem of the Black Sea FIR boundary and reinforce civil/military co-operation. Objective 3 The third simulation objective was to assess the impact of reducing separation from 30 NM to 20 NM on the western FIR boundary although a 15 minutes separation is required on the eastern FIR boundary. The simulation has identified that at the level of traffic forecast for 2001, controllers will have great difficulties providing 15 minutes separation at the Teheran FIR boundary either with the current network (Organisation 1) or with the modified one (Organisations 2, 3 and 4), without imposing severe flight level penalties on the eastbound traffic. The flow orientation of traffic applied in organisation 6 solved this problem. In this organisation controllers encountered no difficulties to provide the required separation, because the eastbound and westbound flows were geographically separated it was easier for controllers to climb aircraft to Requested Flight Levels despite the absence of vectoring space. EEC Task AR41 (S05) - EEC Report N°301 Page 8 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Other results Finally, in addition to simulation objectives, the experiment identified that : • The fact that radar vectoring was not applicable outside TMAs (because controlled airspace in Turkey is mainly defined as 10 NM wide airways, within which it is not possible to apply a 10 NM lateral separation) contributed to a large extent to increased controller workload in all organisations, particularly when it was necessary to provide lateral separation between climbing or descending aircraft on the same route. • The introduction of the FDP system appeared to generate high controller workload particularly for procedural controllers. This was the result of the combination of three factors : i.) a lack of standard working methods with automated systems. This is not surprising as FDP is not currently used in Turkey ; ii.) a sector manning (procedural, radar) not adapted to the traffic requirements. It was recognised that the procedural controller was working as an assistant controller, his main task being FDP data input. It was identified that on all busy sectors, in addition to the assistant controller, there was a need for a planning function, the planning controller being the "key man" of the sector and having the same qualification as the radar controller ; iii.) a lack of automation of FDP systems at the Istanbul Ankara interface, as the distribution of FPL data (Activation, Modification messages) was limited to the sectors belonging to the same Turkish ACC. Data was provided to other sectors only after an intercentre co-ordination, followed by FDP inputs. 6. RECOMMENDATIONS In the event that sector configurations with vertical division are introduced (assuming full automated FDP system), it is recommended that local operational rules and inter-sector letters of agreement be established to regulate the transfer of traffic between such sectors. Such agreement should define : • safe transfer levels between sectors; • co-ordination procedures to establish transfer levels between sectors; • data input rules governing the amendment of flight profile and sector sequence (e.g. PFL input). It is recommended that on all busy sectors "I", "E", "Q", "AW", AE" a sector manning based on three controllers (assistant, planning, radar) be established. It is recommended that further studies should include a review of current inbound and outbound traffic management of Ankara TMA taking into account a possible need for multiple holding positions. EEC Task AR41 (S05) - EEC Report N°301 Page 9 REAL-TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ It is recommended that further studies examine with the active participation of Turkish military authorities the application of a more flexible use of airspace and the application of radar vectoring outside TMAs. EEC Task AR41 (S05) - EEC Report N°301 Page 10 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ SOMMAIRE AR41 était une simulation en temps réel, effectuée pour le compte de la Turquie, destinée à évaluer les projets de la Direction de l'aviation civile Turque (DHMI) pour la réorganisation des FIR d'Istanbul et d'Ankara à l'horizon 2001, étant donné que l'augmentation de trafic prévue à cette date (+60% minimum) affectera de façon sensible le contrôle du trafic aérien dans cette région. La simulation s'est déroulée durant 5 semaines du 13 Novembre au 15 Décembre 1995. Six organisations d'espace ont été testées avec les volumes de trafic prévus pour 1996 et 2001. L'évaluation consistait à valider de nouvelles sectorisations et nouveaux réseaux de routes. 33 exercices représentant 73 heures de simulation ont été effectués. Les résultats, basés à la fois sur les opinions subjectives des participants et les analyses objectives effectuées sur les données enregistrées au cours de la simulation, indiquent que la sectorisation proposée dans l'organisation 6 permettra d'augmenter la capacité des centres d'Istanbul et d'Ankara. Ces résultats indiquent aussi qu'il ne faudra pas attendre de progrès significatifs de cette sectorisation, si conjointement à sa mise en place des changements ne sont pas effectués dans le réseau de routes afin d'obtenir une meilleure répartition des charges de travail entre les centres d'Istanbul et d'Ankara. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 9 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ INTRODUCTION La Turquie a une place importante dans le monde de l'ATC en Europe car elle assure les services du contrôle sur les principales routes vers le Moyen - Orient et l'Extrême - Orient. Ce pays a été confronté, ces dernières années, à une importante augmentation de trafic à la suite de la crise yougoslave. Le trafic qui survolait l'Italie, la Yougoslavie et la Grèce avant la crise, traverse aujourd'hui l'Autriche, la Hongrie, la Roumanie, la Bulgarie et la Turquie. De plus, les prévisions de trafic sur la Turquie pour l'année 2001, qui prennent en compte la réouverture de la FIR de Zagreb, indiquent une augmentation minimum de 60% par rapport au niveau de trafic actuel. La direction de l'aviation civile Turque (DHMI), consciente des problèmes, a lancé un programme de modernisation de son système ATC qui inclut une amélioration de l'organisation de l'espace aérien contrôlé par les centres de contrôle d'Istanbul et d'Ankara (de nouvelles installations techniques comprenant un système automatisé de traitement de plan de vol équipent ces centres). Dans ce but, différents projets proposant de nouvelles sectorisations, de nouveaux réseaux de routes, des réductions dans les standards de séparation entre avions et prenant en considération les propositions issues des études coopératives entre la Turquie, la Bulgarie et la Roumanie, ont été élaborés par le DHMI. Compte tenu que la mise en service du nouveau système de traitement de plan de vol modifiera les méthodes de travail des contrôleurs, Il a été décidé de valider les solutions envisagées par une simulation en temps réel prenant en compte le futur environnement opérationnel et technique des centres de contrôle d'Istanbul et d'Ankara. Cette simulation a été approuvée lors de la réunion du groupe des utilisateurs en janvier 1994. Il fut alors décidé qu'elle se déroulerait en novembre 1995 sous la référence AR41. Les spécifications de cette simulation ont été élaborées par un groupe de travail composé de représentants de DHMI et d'Eurocontrol. La simulation qui s'est déroulée durant cinq semaines du 13 novembre au 15 décembre 1995 a été partagée en une semaine d'entraînement et de familiarisation avec le nouvel environnement opérationnel et quatre semaines d'exercices mesurés. Six organisations de l'espace furent testées avec des volumes de trafic représentatifs des années 1996 et 2001. 33 exercices représentant 73 heures de simulations furent effectués. 27 contrôleurs ont participé à cette simulation. Le groupe était composé de 2 contrôleurs Bulgares et 25 contrôleurs Turcs dont 2 militaires. Les résultats et conclusions présentés dans ce rapport sont basés sur les opinions des participants, les observations du chef de projet et les analyses effectuées sur les enregistrements des exercices. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 10 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ OBJECTIFS Trois objectifs étaient définis pour la simulation: 1. Evaluer différents projets de sectorisation de l'espace aérien turc; 2. Evaluer l'impact de la mise en place de trois nouvelles routes sur les sectorisations proposées; 3. Evaluer la possibilité de réduire les séparations longitudinales de 30 NM à 20 NM entre la Bulgarie et la Turquie tout en assurant 15 minutes de séparation entre la Turquie et l'Iran. ORGANISATIONS TESTEES Six organisations d'espace furent testées. Quatre furent préparées avant la simulation (Org 1, 2, 3, 4) et deux développées durant l'expérimentation (Org 5,6). Organisation 1 2 3 4 5 6 Tâche CEE AR41 (S05) - Rapport CEE N° 301 Sectorisation pour Istanbul Sectorisation verticale existante. (1996). Deux secteurs d'approche (P,N) et 2 secteurs en route avec niveau de séparation FL315 (I,E). la sectorisation de l'organisation 1 Sectorisation pour Réseau de routes Ankara Le réseau de route Sectorisation existant. géographique existante (1996). Un secteur d'approche (L), 2 secteurs en route (AW, A) Nouvelle sectorisation géographique des secteurs en route I & E. Deux secteurs d'approche (P,N) et 2 secteurs en route avec niveau de séparation FL315 (I,E). Nouvelle sectorisation verticale des secteurs en route I & E. Deux secteurs d'approche (P,N) et 2 secteurs en route avec niveau de séparation FL315 (I,E). Nouvelle sectorisation verticale pour les secteurs en route basée sur 3 secteurs Q, I, E. Deux secteurs d'approche (P,N) et 3 secteurs en route avec niveau de séparation FL255 (Q,I) & FL315 (I,E). La sectorisation de l'organisation 5 Nouvelle sectorisation géographique des secteurs en route AW & A. Un secteur d'approche (L) 2 secteurs en route (AW, A). la sectorisation de l'organisation 1 le réseau de routes existant augmenté de trois nouvelles routes. Le réseau de routes de l'organisation 2 Nouvelle sectorisation Le réseau de routes de verticale des secteurs l'organisation 2. en route. Un secteur d'approche (L) 3 secteurs en route (A, AW, AE), niveau de séparation FL275. La sectorisation de l'organisation 4 le réseau de routes de l'organisation 2. la sectorisation de l'organisation 5 Un nouveau réseau de routes, une nouvelle distribution de trafic. Page 11 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Les cartes de chaque organisation sont présentées à l'Annexe 7. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 12 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ CONCLUSIONS Objectif 1 Le premier objectif de la simulation qui consistait à évaluer différents projets de sectorisation de l'espace turc a été atteint. Une nouvelle organisation de l'espace à 12 secteurs a été proposée. Cette organisation a reçu un accueil très favorable de la part des contrôleurs. Elle se compose des secteurs suivants : FIR d'Istanbul • L'organisation actuelle de la TMA d'Istanbul découpée en 2 secteurs P & N (Sol / FL 165) • Au dessus de la TMA trois secteurs superposés : Q (FL165 / FL 255), I ( FL 255 / FL 315), E (FL 315 / UNL) FIR d'Ankara • Une TMA Ankara étendue vers le Sud, composée d'un secteur d'approche L (sol / FL 165) • Au dessus de la TMA deux secteurs superposés : AW (FL 165 / FL 275), AE (FL 275 / UNL) • Dans la partie Est de la FIR 2 secteurs géographiques. • Dans la partie Sud de la FIR 2 secteurs superposés avec niveau de séparation FL 275 La simulation a montré que l'établissement d'une sectorisation verticale dans les FIR d'Istanbul et d'Ankara est viable même si le trafic qui est contrôlé comporte une grande proportion de vols en évolution verticale. Dans ce cas les avantages que l'on peut attendre d'une telle sectorisation seront liés à la mise en place de lettres d'accord entre secteurs et entre centres. Ces lettres définiront les contraintes à mettre en place sur certains profils de vol pour éviter un excès de coordinations et maintenir les interactions avec le système de traitement plan de vol au minimum. Dans ce cas, le secteur "Q" devrait être responsable de la gestion du trafic au départ et à destination d'Istanbul, le secteur "I" devrait être responsable de la gestion du trafic en survol et l'intégration des trafics en provenance et à destination d'Izmir, de Dalaman et d'Antalya, le secteur "E" ne devrait gérer que du trafic en survol. La simulation a également montré que ce dispositif ne donnerait pleinement satisfaction que si des changements dans le réseau de routes et les orientations de trafic étaient mis en place. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 13 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Objectif 2 Le deuxième objectif consistait à évaluer l'impact de trois nouvelles routes sur les différentes sectorisations. La simulation a indiqué que les conséquences de la mise en place de ces trois routes étaient négligeables pour les centres d'Istanbul et d'Ankara (aucune amélioration dans la distribution du trafic et dans sa complexité n'a été mise en évidence). Les participants, utilisant les résultats obtenus par l'étude conduite à l'aide du simulateur par modèle relative aux flux de trafic échangés entre la Bulgarie, la Roumanie et la Turquie, ont fait des propositions pour réorganiser ces flux dans les FIR d'Istanbul et d'Ankara. Ces propositions, décrites ci-dessous, ont été testées avec succès. Création d'une route à sens unique : [TGJ-TASEV-BURSA] destinée au trafic provenant des pays d'Europe de l'Ouest • le trafic à destination du Moyen - Orient utiliserait la route [TGJ-TASEVBURSA-KFK-MUT-VESAR] • le trafic à destination d'Antalya utiliserait la route [TGJ-TASEV-BURSA-CRDAYT] (TASEV est un nouveau point d'entrée dans la FIR d'Istanbul, situé à l'intersection entre la route [TGJ-IST] et la limite de la FIR) Dédoublement de l'UG1 entre CND et IST • UG1 Ouest : [IST-RIXEN Ouest-CND], route à sens unique destinée aux départs d'Istanbul • UG1 Est : [DINRO-RIXEN East-BKZ] route à sens unique destinée aux arrivées d’Istanbul Orientation du trafic au départ et à destination d'Izmir et de Dalaman par Radovets. • Route arrivée • Route départ : : [RAD-ADORU-EKI-BIGA-IMR] [IMR-ADORU-RAD] Orientation du trafic au départ d'Antalya vers les pays d'Europe de l'Ouest par [DAMLA-KFK East-BKZ-RIXEN ouest-CND] Création d'un giratoire pour le trafic d'Extrême Orient. • Trafic à destination de l'Extrême - Orient [DINRO-INB-GEM-VAN-BONAM] • Trafic en provenance de l'Extrême - Orient [DASIS-ERZ-TBN-TALIK-CND] Suppression de la route [ODESSA-BAG] et orientation du trafic en provenance des pays de l'ex Union soviétique à destination d'Istanbul par [CND-RIXEN Est]. Tout autre trafic provenant de ces pays est orienté par [ODESSA-TALIK-BAG]. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 14 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Remplacement de la route [RIXEN-BAG] par [DINRO-RUDON-BAG] pour le trafic provenant du Moyen Orient et au départ d'Ankara à destination des pays d'Europe de l'Ouest. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 15 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ Objectif 3 Le troisième objectif de la simulation consistait à analyser les conséquences d'une réduction de séparation longitudinale de 30 à 20 Nm entre la Bulgarie et la Turquie tout en maintenant les 15 minutes de séparation avec Téhéran. La simulation a identifié qu'avec le volume de trafic prévu pour 2001, les contrôleurs auront les plus grandes difficultés à garantir les 15 minutes de séparation longitudinale avec Téhéran que ce soit avec le réseau de routes actuelles ou avec le réseau de routes testées dans les organisations 2,3,4, sans pénaliser fortement le trafic vers l'Extrême - Orient. Ce problème a été résolu avec l'organisation 6. Dans cette organisation les contrôleurs n'ont rencontré aucune difficulté pour garantir les 15 minutes de séparation car les flux Est et Ouest étaient géographiquement séparés. Il était alors plus facile pour les contrôleurs d'offrir aux avions les RFL en l'absence d'espace libre pour manoeuvrer ces avions. Autres résultats Cette simulation a identifié que : 1. Le fait qu'il n'était pas possible pour les contrôleurs d'appliquer les méthodes du contrôle radar hors des TMA (les espaces contrôlés étant trop petits) a contribué à augmenter la charge de travail du contrôleur radar plus particulièrement lorsqu'il était nécessaire de séparer des trafics en évolution sur la même route. 2. L'introduction du système de traitement plan de vol a généré une charge de travail élevée pour le contrôleur aux procédures pour les deux raisons suivantes: • Un nombre trop important d'interactions entre le contrôleur et le système de traitement plan de vol (la distribution des données plan de vol étant limitée aux secteurs appartenant au même centre de contrôle, les autres secteurs étant servis après une coordination intercentre) • Un armement secteur (procédural, radar) inadapté aux volumes de trafic. Le contrôleur procédural était principalement un assistant contrôleur mettant à jour les plans de vol. Il fut identifié qu'il était nécessaire d'ajouter, en plus de la fonction "assistant", une fonction de planification sur tous les secteurs chargés. Ce contrôleur planning ayant une qualification identique à celle du contrôleur radar, devient alors un élément essentiel dans la gestion du secteur. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 16 SIMULATION EN TEMPS REEL D’ISTANBUL ET D’ANKARA EUROCONTROL EXPERIMENTAL CENTRE_________________________________________________________________ RECOMMANDATIONS Dans le cas où une sectorisation verticale serait mise en place dans un environnement qui intègre le système de traitement radar et le système de traitement plan de vol, il est recommandé que lettres d'accord définissant les responsabilités de chaque secteur ainsi que les règles de transfert intersecteur soient préparées. En particulier ces lettres d'accord définiront les niveaux de transfert entre secteurs, les procédures de coordination et les règles qui conditionnent la gestion des profils de vol. Il est recommandé d'armer les secteurs "I", "E", "Q", "AW","AE" par trois contrôleurs (Radar, planning, assistant). Il est recommandé que de nouvelles études soient entreprises pour examiner : • La possibilité de créer des circuits d'attente multiples dans la TMA Ankara • Une utilisation plus flexible de l'espace aérien et la possibilité d'agrandir les espaces contrôlés afin de pouvoir y appliquer les méthodes du contrôle radar. Tâche CEE AR41 (S05) - Rapport CEE N° 301 Page 17 REAL TIME SIMULATION OF TURKISH AIRSPACE EUROCONTROL EXPERIMENTAL CENTRE________________________________________________________________________ ANNEX 1 EEC Task AR41 (S05) - EEC Report N° 301 Maps of Organisations Tested Page 16 ODESSA CND 24 45 25 26 27 28 29 BULEN 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 45 DINRO LEZON TARGO MATEL 44 BGS AN IST A FI SO 43 AR41 : Organisation 1 44 TALIK BLO L BU FIR ANKARA FIR VARNA FIR R FI RAD INB RIXEN LTCMSIN TUDEK GERZE 43 ADELI MOSAR GOTAN BKZ TOP SIVLI CEK LTBA EKI KALFA IST DENIZ YAA LTBQ IMREN BOZOK ORMAN LTBU ALX 42 PEREN GOLDO BIG ERSEN ASTAL BANDO YAYLA 41 LTBI LTBN 40 LTBT LTBL OLIDA KULAR LTBJ VEXOL SITRU KARGI BERGO LSV TUMER KINIK KEA IST AN BU MILAS L RIPLI LTBV MARIS 38 HISAR LTAI AYT LTCA TOROS LTCC DIY SEHIR BONAM NARLI LTCJ ALRAM UMH LTCH LTAG LTAF KONAK MANAV LTCI SRT LTAJ ADA MUT GAZ TUSYR 39 38 DERYA PINAR TOMBI VESAR DOREN DASNI 37 TBZ KABAN ANKARA FIR URF 40 TEHERAM FIR VAN BAYIR TAMER ASKER DAMLA OZYAK BRONZ LTCK MUS ERH OBRUK KON LTAN ALTIN ALPAY 41 IGDIR DASIS KUMRU RDS ERN EZS LTAU LTAT LTBS DAL BANRO LTCD IKINA ERZ GEM ERHAN KAVAK FIR LTCE BUDAK SIV MARTI KSR LTAY OKESA 42 KAR LTAR LTBO REDRA ERIBA LTCF LTAH CRD 39 LTCG TBN KFK MEN IMR MNI ABEYPETAR BUK ILHNS IRMAK LTAE LTAC GURBU BEY BAG ANK ASKAM LTADLTAB KUBER RAMAN HAY YUCEL HALIL BAKIR TELVO ESR LTBF AMANI LTAQ LTAP ORGUN ILHAN SALGO TOKER LTBG BUR LTBE SMN KTM LTAL 37 ALSUS LCA 36 36 35 35 34 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 34 46 ODESSA 24 45 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 45 CND 44 44 BULEN DINRO LEZON TARGO ANKIS 43 43 MATEL BLO OD2 BGS 42 A FI SO R FI AN IST RIXEN VARNA FIR BU TALIK IR LF ANKARA FIR INB RAD LTCMSIN TUDEK ADELI KTM ORMAN GOTAN LTBU TOP BKZ LTAL MARAL SIVLI GOLDO CEK ALX LTBA EKI KALFA IST ASTAL ORGUN DENIZ YAA LTBQ ERSEN SALGO IMREN ILHAN BOZOK ABEYPETAR BUK BIG ILHNS IRMAK TOKER LTBG BUR LTAE LTBE LTAC GURBU BEY BAG ANK BANDO ASKAM YAYLA LTADLTAB LTBI KUBER ESR RAMAN LTBF HAY AMANI YUCEL KARGI HALIL LTBN BAKIR TELVO BERGO LSV KINIK KFK TUMER LTBT LTAH SMN MOSAR 41 PEREN 40 39 LTBL OLIDA LTBJ VEXOL SITRU 38 OKESA 37 IST AN BU MILAS L LTBV KUMRU MARIS DAL BANRO ALTIN 36 ERZ 40 IKINA ERN IGDIR GEM 39 DASIS KSR LTCK MUS EZS LTAU TEHERAM FIR ERH LTCA TOROS LTCC DIY VAN BAYIR TAMER LTCI SRT BONAM NARLI LTCJ SEHIR DAMLA LTAI AYT KONAK MANAV ALPAY RDS LTCD SIV MARTI LTCE BUDAK LTAR TBZ 38 ALRAM UMH OZYAK BRONZ LTBS KAR LTCF ASKER LTAN KAVAK FIR ERIBA OBRUK KON LTAY 41 LTAT HISAR REDRA RIPLI MNI LTCG TBN ERHAN CRD KEA LTAQ LTAP KULAR LTBO MEN IMR 42 GERZE LTCH LTAG LTAF GAZ LTAJ ADA MUT KABAN ANKARA FIR URF 37 TUSYR DERYA PINAR TOMBI 36 VESAR DOREN DASNI 35 34 24 35 ALSUS LCA 25 26 27 28 29 30 AR41 : Organisation 2 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 34 46 AR41 : Organisation 3 ODESSA 24 45 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 45 CND 44 DINRO 43 43 MATEL BLO OD2 BGS 42 A FI SO R FI AN IST RIXEN VARNA FIR RAD LEZON ANKIS TARGO BU TALIK IR LF ANKARA FIR INB LTAQ 39 OLIDA SITRU 38 MEN IMR HISAR CRD REDRA 37 IST AN BU MILAS L RIPLI LTBV MARIS DAL BANRO LTAI AYT LTBS ALTIN ALPAY RDS 36 KAR ERIBA LTCF IGDIR LTCD GEM LTAU ERH ERHAN LTCK MUS LTCA ASKER TAMER LTCC DIY TEHERAM FIR VAN BAYIR LTCI LTAT TOROS SRT BONAM NARLI LTCJ LTCH LTAF GAZ KABAN ANKARA FIR URF 37 DERYA TUSYR PINAR TOMBI 36 VESAR DOREN 35 ALSUS LCA Feed Sectors 27 28 29 30 31 38 ALRAM LTAJ ADA MUT 35 26 TBZ UMH KONAK DASNI 25 39 DASIS EZS KSR LTAG MANAV 40 IKINA ERN SIV MARTI ERZ LTCE BUDAK LTAR DAMLA OZYAK BRONZ FIR 41 MNI SEHIR KUMRU KAVAK LTCG TBN OBRUK LTAN KON LTAY OKESA KEA SMN LTAP L 40 42 GERZE ADELI MOSAR KTM ORMAN MARAL LTAL GOTAN TOP BKZ GOLDO ERSEN LTBA ALX SIVLI CEK EKI KALFA IST ASTAL ORGUN DENIZ YAA LTBQ SALGO IMREN ILHAN BOZOK TOKER ABEYPETAR BUK BIG ILHNS IRMAK LTBG BUR LTAE LTBE LTAC GURBU BEY BAG ANK BANDO ASKAM YAYLA LTADLTAB LTBI KUBER ESR RAMAN LTBF HAY AMANI YUCEL KARGI HALIL LTBN BAKIR TELVO BERGO LSV KINIK KFK LTBT KULAR LTAH LTBL TUMER LTBJ VEXOL LTBO PEREN TUDEK LTCM SIN LTBU 41 34 24 44 Feed Sectors BULEN 32 33 34 35 36 37 38 39 40 41 42 43 44 45 34 46 AR41 : Organisation 4 ODESSA 24 45 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 45 CND 44 44 BULEN DINRO 43 43 MATEL BLO OD2 BGS AN IST 42 A FI SO BU TALIK IR LF ANKARA FIR VARNA FIR R FI RAD INB RIXEN ADELI MOSAR GOTAN TOP BKZ MARAL SIVLI ERSEN CEK LTBA EKI KALFA IST DENIZ YAA LTBQ IMREN BOZOK ORMAN LTBU 41 ALX GOLDO PEREN BIG BANDO YAYLA LTBI ESR AMANI LTBF LTBT LTBL OLIDA SITRU KULAR LTBJ VEXOL 38 LTBN BERGO LSV TUMER KINIK KARGI 37 IST AN BU MILAS L RIPLI LTBV KAR SIV MARTI LTCE BUDAK LTAR LTCD ERZ ERN IGDIR LTCK MUS EZS LTAU LTCA VAN BAYIR LTCI LTAT TOROS LTCC DIY SEHIR LTCH LTAG LTAF KONAK MANAV SRT BONAM NARLI LTCJ TBZ 38 ALRAM UMH DAMLA LTAI AYT TAMER ASKER LTAN KON KUMRU RDS 39 TEHERAM FIR ERH OBRUK HISAR ALTIN ALPAY 40 IKINA GEM ERHAN LTBS DAL BANRO ERIBA DASIS OZYAK BRONZ FIR TBN LTCF LTAH KAVAK MARIS 36 MNI KSR LTAY OKESA 41 LTAQ LTAP LTBO REDRA LTCG SMN KTM ORGUN ILHAN SALGO 42 KFK CRD KEA ASTAL TUDEK GERZE LTAL MEN IMR LTCMSIN ABEYPETAR BUK ILHNS IRMAK LTAE LTAC GURBU BEY BAG ANK ASKAM LTADLTAB KUBER RAMAN HAY YUCEL HALIL BAKIR TELVO TOKER LTBG BUR LTBE 40 39 LEZON ANKIS TARGO GAZ LTAJ ADA MUT KABAN ANKARA FIR URF 37 TUSYR DERYA PINAR TOMBI 36 VESAR DOREN DASNI 35 34 24 35 ALSUS LCA 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 34 46 AR41 : Organisations 5 and 6 ODESSA 24 45 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 45 Overflying Traffic Western European Countries / Middle East. Overflying Traffic Western European Countries / Far East. BUUNI CND Istanbul Departures / Arrivals 44 BULEN Feed Sectors Antalya Departures / Arrivals LEZON TARGO 43 MATEL BGS AN IST RIXEN RIXEN EAST WEST RAD TASEV ADORO VARNA FIR 42 A FI SO R FI ADELI MOSAR LTBU 41 ALX BU IST YAA LTBQ PEREN ANKARA FIR fl 275 fl 165 ORMAN ERSEN BANDO ESR YAYLA AMANI LSV LTBF LTBN KARGI KFK EAST BERGO LTBT LTBL OLIDA LTBJ VEXOL 38 SITRU TUMER 37 IST AN BU MILAS L LTBV KAVAK MARIS DAL ALTIN SIV MARTI LTAI AYT LTCE BUDAK LTAR LTCD ERZ 40 IKINA IGDIR ERN GEM LTCK MUS EZS LTAU 39 LTCA VAN BAYIR LTCI LTAT TOROS LTCC DIY TBZ BONAM TAMER ASKER LTAN KON TEHERAM FIR ERH OBRUK SRT NARLI LTCJ KONAK MANAV LTCH LTAG LTAF ANKARA FIR URF 37 LTAJ GAZ ADA MUT 38 ALRAM UMH KABAN DAMLA ALPAY TUSYR DERYA RDS PINAR TOMBI 36 VESAR DOREN DASNI 35 KAR LTCF ERHAN OZYAK BRONZ FIR 41 ERIBA SEHIR LTBS BANRO 36 MNI LTAH KUMRU LTCG TBN DASIS fl 275 LTAY OKESA RIPLI ORGUN ILHAN KSR HISAR CRD 42 LTAQ LTAP KULAR LTBO REDRA KEA KFK KINIK MEN IMR SMN ABEYPETAR BUK ILHNS IRMAK LTAE LTAC GURBU BEY BAG ANK ASKAM LTADLTAB KUBER RAMAN HAY YUCEL HALIL BAKIR TELVO LTBI TUDEK KTM LTAL ASTAL SALGO TOKER LTBG BUR LTBE 39 LTCM SIN GERZE MARAL BIG 40 INB LTBA EKI 43 Airspace delegated to Ankara TALIK IR LF fl 315 fl 255 fl 165 BKZ SIVLI GOLDO Izmir,Dalaman Departures / Arrivals RUDON OD2 BLO 44 Ankara Departures / Arrivals DINRO Feed Sectors 35 ALSUS LCA 34 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 34 46