Passivescape: Country House 1 in Ibero

Transcription

Passivescape: Country House 1 in Ibero
Etu d e d e ca s : P a s s i ve s ca p e : Co u n tr y Ho u s e 1 i n Ib e r o
S i te We b : h ttp ://www.co n s tr u cti o n 2 1 .o r g /b e l g i q u e /
Passivescape: Country House 1 in Ibero
PUBLIÉ PAR ARCHANCO MANCHO | 30 JUIN 16
Type de pro jet : Reno vatio n
Type de bâtiment : Hô tel
Année de co nstructio n : 20 15
Zo ne climatique : [Dfa] Co ntinental
Humide. Eté très chaud, humide to ute
l'année.
Surface nette : 278 m 2
Co ût de co nstructio n : 335 70 7 €
No mbre d'unités fo nctio nnelles : 7
Chambre
Co ût/m² : 1 20 8 €/m 2
Co ût/Chambre : 47 9 58 €/Chambre
C/ Lareberri 18 , 31173 Íbero , Navarra,
España
// Description
A co ttage, which can be rented fo r sho rt stays, can be a go o d cho ice to publicize the still unkno wn Passivhaus standard in
Spain. Rehabilitatio n was an interesting o ptio n to test the feasibility o f the standard in the resto ratio n o f buildings.
The starting po int was a building in Íbero , a small to wn near Pamplo na, Navarra. The existing building had an irregular
plant, with a sto ne east facade to the Larreberri street, and west facade to the inner co urtyard. The co nstructio n o f this ho use is
traditio nal, with sto ne lo ad-bearing walls, wo o den beams and ceramic brick co ver. It was decided to keep the o uter shell, so
that the demo litio n o f the o ther elements was a co mplex pro cess.
Because we have tried to fo llo w the Passivhaus standard, we have been taken into special co nsideratio n issues such as the
tightness o f the building, to prevent leaks, and the thermal envelo pe, to achieve a co nstant and pleasant indo o r temperature.
Therefo re, the sheets have been placed in o rder to seal all elements o f the structure, and a wo o d fiber insulatio n has been
us ed thro ugh the inside, to iso late evenly all elements and avo id thermal bridges. In the hearth, ho wever, iso lattio n was
perfo rmed fro m the o utside.
The ho using is designed with a co nstructive system o f laminated wo o d structure, built against the façade preserved and
existing party walls, with blo wn insulatio n and interio rs finished with plate plasterbo ard. Ceramic tiles co ver and wo o den
beams have been preserved, using the wo o d fiber insulatio n blo wn by the interio r and finish plasterbo ard. The fo rged against
gro und is designed as a hearth with EPS insulatio n o n the o utside, and finished with ceramic tiles.
A triple wo o dwo rk was cho sen with glass and air and argo n chambers; the po sitio n o f the windo ws and their enco unter with
the enclo sure changes fro m o ne facade to ano ther: in the sto ne facades and o ld brick were placed with sub-frame, to the inner
face; in the half-timbered facades they were placed inside rebateless.
The reno vatio n o f the indo o r air is perfo rmed by a ventilatio n system with dual-flo w heat exchanger o f high efficiency, which
allo ws us to heat fresh air driven by the heat extracted fro m stale air. With a co ntinuo us flo w o f filtered and reno vated air, levels
o f CO2 and vo latile o rganic co mpo unds (VOC o r VOC) are kept to a minimum. It has been installed in the ventilatio n system, a
battery aftertreatment air, befo re pushing to acclimate the ho using.
Pro ductio n o f do mestic ho t water (DHW) has been fixed with a heat aero thermal pump , to extract energy fro m the o utside air,
even at lo w temperatures. In turn, the heat pump is co nnected to the radiating panels installed o n the walls o f the ro o ms.
All facilities are do mo tized, which will co ntro l the ventilatio n system, heating and air co nditio ning, thro ugh the Lo xo ne system,
co nnected to a web server which can be accessed fro m mo bile, tablet o r PC.
Once the wo rk was finished, the Blo wer Do o r seal test was perfo rmed, o btaining a result o f 0 .6 reno vatio ns, thus meeting the
Passivhaus standard.
Plus de dé t ails sur ce pro je t :
http://www.sugeaho me.co m/
http://www.passivescape.co m/
Fiabilit é de s do nné e s :
Expert
// Intervenants
Architecte
No m : BOA arquitecto s
co rreo @bo a-arquitecto s.co m
Site Web : http://www.bo a-arquitecto s.co m
Actio n : Design and co nstructio n management
Promoteur
No m : Sugea Ho me S.L.
info rmacio n@sugeaho me.co m
Site Web : http://www.sugeaho me.co m
Constructeur
No m : Pro getic
pro getic@pro getic.co m
Site Web : http://www.pro getic.co m
Actio n : Design o f installatio ns: ventilatio n, ho t water, air co nditio ning, ho me auto matio n
Bureau d'étude thermique
No m : Energiehaus Arquitecto s S.L.
info @energiehaus.es
Site Web : http://www.energiehaus.es
Actio n : Adviso ry
Bureau d'études structures
No m : Madergia
info @madergia.co m
Site Web : http://www.madergia.co m
Actio n : Design and structural calculatio n, assembly
Fabricant
No m : Sto ra Enso
bruno .maresca@sto raenso .co m
Site Web : http://buildingandliving.sto raenso .co m/abo ut-us/co mpany
Actio n : Manufacturer o f wo o d pro ducts, structural timber ...
Fabricant
No m : Zehnder Gro up Ibérica Indo o r Climate, S.A.
info .es@zehndergro up.co m
Site Web : http://www.zehnder.es
Actio n : Manufacturer and distributo r o f ventilatio n systems
Certificateur
No m : Instituto Passivhaus
[email protected]
Site Web : http://www.passiv.de
Actio n : Certificatio n co mpany
Autre intervenant
No m : Bio haus Go ierri
bio haus@bio haus.es
Site Web : http://www.bio haus.es/
Actio n : Distributo r o f iso latio n fro m natural wo o d fibers
Autre intervenant
No m : Zulziri
[email protected]
Site Web : http://www.zulziri.es/
Actio n : Perfo rming the sealing and the wo o den facades
Autre intervenant
No m : Onhaus
info @o nhaus.es
Site Web : http://www.o nhaus.es
Actio n : Distributo r o f building materials under the Passivhaus standard
Autre intervenant
No m : Altertechnica
info @altertech.es
Site Web : http://www.altertech.es
Actio n : Installatio n co mpany fo r ventilatio n and air co nditio ning
Mo de co nt ract ue l :
Autres métho des
Dé m arche dé ve lo ppe m e nt durable du m aît re d'o uvrage : Passivescape: Co nutry Ho use 1 in Íbero , has been
designed and built to the Passivhaus standard, and is currently undergo ing certificatio n. The standard gives prio rity to thermal
co mfo rt and to the drastic reductio n o f energy demands, thanks to thermal insulatio n, reductio n o f thermal bridges and
ensuring the sealing, which means that co ld spo ts and currents are minimized. As far as po ssible, they have cho sen materials
with a lo w enviro nmental impact, such as the iso latio n o f natural fibers blo wn wo o den structure laminated wo o d, wo o d
flo o ring, and the use o f co tto n and natural latex mattresses and bedding.
De script io n archit e ct urale : The ho use has a flo o r space o f 26 4.6 0 m2 o n 3 flo o rs. The existing building was
demo lished inside, preserving the co ver and the façade to the Larreberri street. It was decided to preserve the facade to
preserve its traditio nal image and beco me harmo nio usly integrated into the urban enviro nment. In terms o f design, building
strategy is based o n building a wo o den structure inside the preserved envelo pe, iso lating the interio r with natural wo o d fibers
and finished with insuflated plasterbo ard panels. The insulatio n inside ensures the co ntinuity o f the thermal envelo pe, thereby
avo iding thermal bridges.
Opinio n de s o ccupant s :
hygiene.
The building is co nvenient, co mfo rtable and maintains a go o d level o f temperature and air
// Energie
Consommation énergétique
Be so in e n é ne rgie prim aire : 8 6 ,30 kWh PE/m 2 /year
Be so in e n é ne rgie prim aire bât im e nt st andard : 28 4,0 0 kWh PE/m 2 /year
Mé t ho de de calcul :
CEEB : 0 ,0 0 kWh PE / €
Co nso m m at io n d'é ne rgie f inale : 33,20 kWh FE/m 2 /year
Ré part it io n de la co nso m m at io n é ne rgé t ique : Heating demand: 18 .75 kWh / m2 / a Ho t water demand: 27 kWh /
m2 / a
Co nso m m at io n init iale : 1,0 0 kWh PE/m 2 /year
Performance énergétique de l'enveloppe
UBat de l\'e nve lo ppe :
0 ,20 W.m -2 .K-1
Plus d'inf o rm at io n sur l'e nve lo ppe : The building envelo pe is co mpo sed o f two different types o f facade, two types
o f party walls, deck and slab. The west facade, the interio r co urtyard, with a value o f U = 0 .19 9 W / m2 K, described belo w:
Interio r > Exterio r -30 mm plasterbo ard panel -20 mm -8 0 mm air chamber natural wo o d fiber insulatio n - 15 mm -16 0 mm
OSB natural wo o d fiber insulatio n -20 mm -20 mm air chamber pine bo ard Eastern façade to Larreberri street, with a value
o f U = 0 .175 W / m2 K, described belo w : Interio r > Exterio r panel -15 mm plasterbo ard panel -8 0 mm wo o d fiber insulatio n 150 mm natural wo o d fibers -30 0 mm maso nry wall -15 mm mo rtar The Mediatrix, with a value o f U = 0 .18 W / m2 K is
described belo w: Interio r > Exterio r panel -15 mm plasterbo ard panel -8 0 mm wo o d fiber panel -150 mm natural wo o d
insulatio n fibers -30 0 mm maso nry wall -15 mm mo rtar The dividing wall between the two ho uses, with a value o f U = 0 .16
W / m2 K, described belo w: Interio r > Exterio r -15 mm plasterbo ard panel -8 0 mm Ro ckwo o l insulatio n -15 mm plaster
spo rted -110 mm perfo rated brick -140 mm natural wo o d fiber insulatio n -8 0 mm natural wo o d fiber insulatio n -15 mm
plasterbo ard panel The co ver, with a value o f U = 0 .22 W / m2 K, described belo w: Interio r>Exterio r -15 mm plasterbo ard
panel -30 mm air camera -320 mm natural wo o d fibers insulatio n -10 mm mo rtar layer -40 mm ceramic tile Flo o ring o n the
gro und, with a value o f U = 0 .159 W / m2 K, described belo w: Interio r>Exterio r -10 mm ceramic pavement -6 0 mm screed 50 mm insulatio n To po x Mur CV -150 mm co ncrete slab -140 mm insulatio n EPS Sealing is pro vided by sheets and wo o d
panels, pro perly taped between the different materials. The co ntinuity o f the thermal envelo pe is ensured by iso lating the
interio r with insufflated natural wo o d fibers. The carpenters are wo o d with a thermal transmittance Uf = 0 .9 3 W / m2K. The
windo ws are triple-layer, 4-18 -4-18 -4, 10 % air - 9 0 % argo n, with a thermal transmittance o f Ug = 0 .5 W / m2K. The thermal
transmittance o f the installed wo o dwo rk is Uw = 0 .9 5 W / m2K.
Co e f f icie nt de co m pacit é du bât im e nt : 0 ,56
Indicat e ur : n50 (I4) m 3 /H.m 2 n50 (Vo l/H) Q4
Et anché it é à l'air : 0 ,6 0
// EnR & systèmes
Systèmes
Chauf f age :
Po mpe à chaleur
Plafo nd rayo nnant
ECS :
Po mpe à chaleur
Raf raîchisse m e nt :
Po mpe à chaleur réversible
Plafo nd rayo nnant
Ve nt ilat io n :
Ventilatio n naturelle
Ventillatio n no cturne
Free-co o ling
Do uble flux avec échangeur thermique
Ene rgie s re no uve lable s :
Po mpe à chaleur
// Environnement
Emissions de GES
Em issio ns de GES e n phase d'usage : 22,6 0 KgCO 2 /m 2 /year
Mé t ho do lo gie : 8 .5 PHPP with CO2 emissio ns data GEMIS
Duré e de vie du bât im e nt (anné e ) : 50 ,0 0 year(s)
Eau et qualité de l'air intérieur, santé et confort
Qualit é de l'air int é rie ur : Indo o r air quality is ensured by using no n-to xic, natural and renewable materials alo ng with
a mechanical ventilatio n system with dual-flo w heat reco very that pro vides fresh o utdo o r air preheated to 10 0 % by stale
exhaust air.
Co nf o rt & sant é : Thermal co mfo rt is achieved thanks to the thickness and pro per installatio n o f the thermal insulatio n,
reducing thermal bridges and ensuring the sealing, which means that the co ld spo ts and currents are minimized.
// Produits
Bomba de Calor Rotex HPSU compact 8 kW
Fabricant : Daikin
Co nt act f abricant : [email protected]
Sit e Int e rne t f abricant : http://www.daikin.es
Cat é go rie de pro duit : Génie climatique, électricité / Chauffage, eau chaude
De script io n:
Integrated co mpact unit that pro duces do mestic ho t water by using the energy sto red in ambient
air.
Co m m e nt aire s:
Operating acco rding to expectatio ns
Zehnder Comf oAir 550
Fabricant : Zehnder Gro up Ibérica Indo o r Climate, S.A.
Co nt act f abricant : info @zehnder.es
Sit e Int e rne t f abricant : http://www.zehnder.es
Cat é go rie de pro duit : Génie climatique, électricité / Ventilatio n, rafraîchissement
De script io n:
Unit-certified Passivhaus Institute. Co mfo rt ventilatio n up to 550 m³ / h with auto matic bypass in
summer. Heat reco very with a yield o f up to 9 5%. efficient electro nically co mmutated mo to rs
DC.
Co m m e nt aire s:
Operating acco rding to expectatio ns
Zehnder Comf oPost CW10
Fabricant : Zehnder Gro up Ibérica Indo o r Climate, S.A.
Co nt act f abricant : info @zehnder.es
Sit e Int e rne t f abricant : http://www.zehnder.es
Cat é go rie de pro duit : Génie climatique, électricité / Ventilatio n, rafraîchissement
De script io n:
Water co il aftertreatment air. Co mpo nent installed in the ventilatio n system Heated fresh air
driven to the ho using.
Co m m e nt aire s:
Operating acco rding to expectatio ns
Zehnder Comf oWell
Fabricant : Zehnder Gro up Ibérica Indo o r Climate, S.A.
Co nt act f abricant : info @zehnder.es
Sit e Int e rne t f abricant : http://www.zehnder.es
Cat é go rie de pro duit : Génie climatique, électricité / Ventilatio n, rafraîchissement
De script io n:
Co mpo nent installed in the ventilatio n system that reduces no ise generated by the passage o f
air flo wing thro ugh the ho using.
Co m m e nt aire s:
Operating acco rding to expectatio ns
Loxone Smart Home
Fabricant : Lo xo ne
Co nt act f abricant : info @lo xo ne.es
Sit e Int e rne t f abricant : http://www.lo xo ne.co m
Cat é go rie de pro duit : Seco nd œuvre / Équipements intérieurs
De script io n:
Ho me auto matio n system. The Lo xo ne miniserver is a co mpo nent which receives data o n all
installed systems o f the Ho use (ventilatio n, air co nditio ning, ho t water, heating), and yo u can
co ntro l, mo dify and / o r mo nito r fro m different butto ns, smartpho ne, tablet o r PC.
Co m m e nt aire s:
Operating acco rding to expectatio ns
Laminated wood structure
Fabricant : Sto ra enso
Co nt act f abricant : bruno .maresca@sto raenso .co m
Sit e Int e rne t f abricant : http://buildingandliving.sto raenso .co m/abo ut-us/co mpan (...)
Cat é go rie de pro duit : Gro s œuvre / Structure, maço nnerie, façade
De script io n:
Panels o f so lid wo o d sheets glued at right angles to each o ther
Co m m e nt aire s:
Operating acco rding to expectatio ns
// Coûts
Co ût de co nstructio n : 335 70 7 €
Coûts de construction & exploitation
Co ût é t ude s : 11 0 30 ,9 7 €
Co ût t o t al : 335 70 7,48 €
// Environnement urbain
Enviro nne m e nt urbain : Ibero is a to wn 5.6 6 km lo ng and 20 3 inhabitants, in the municipality Cendea de Olza in
Pamplo na (Navarra, Spain). Lo cated 39 3 meters abo ve sea level, in the vicinity o ne can find the Araquil and Arga rivers, the
Ro cks o f Etxauri o r the Valley o f Ollo .
Surf ace du t e rrain :
29 2.6 3 m 2
Surf ace au so l co nst ruit e :
88 %
Parking :
2 parking lo ts inside the building; 4 o utside in an o pen field o n urban land.
// Qualité environnementale du bâti
Qualit é e nviro nne m e nt ale du bât i :
Santé, qualité air intérieur
aco ustique
co nfo rt (o lfactif, thermique, visuel)
efficacité énergétique, gestio n de l\'énergie
gestio n des espaces, intégratio n dans le site
pro cédés de co nstructio n
pro duits et matériaux de co nstructio n
// Concours
Catégories du concours
Energie & Climat Tempérés